I. INTRODUCTION

A. This is a Combined Synopsis/Solicitation for commercial items prepared in accordance with the format in FAR Parts 12.6 as supplemented with additional information in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.

B. The combined Synopsis and Solicitation/Request for Quotation (RFQ) number for this acquisition is: W56HZV-17-T-L552.

C. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 05-95, 19 JAN 2017

D. Small Business Set-Aside: N/A

E. Posting Date: 29 MARCH 2017

F. Response Date: 4 APRIL 2017 (3:00 PM EDT)

G. Contracting Office: Army Contracting Command - Warren (ACC-WRN) 6501 E. Eleven Mile, Warren, MI 48397.

H. The NAICS code applicable to this acquisition is 611310. Offeror must be certified under this NAICS code prior to receiving an award.

I. This Combined Synopsis Solicitation contains clauses and provisions requiring a fill-in or representation. Offeror shall submit a copy of this Combined Synopsis Solicitation with their bid and respond to these clauses and provisions accordingly. A failure to complete these fill-ins may cause your offer to be determined ineligible for award.

***TOTAL PROPOSED COST AMOUNT: $_______________

J. Basis for award - The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 13.106-1(b)(1). Interested persons may identify their interest and capability to respond to the requirement or submit proposals before the closing date of this Solicitation. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. The Government intends to negotiate and award a contract to Eckerd College, Inc. (CAGE Code 0DF08) for this effort. Any other interested parties in this effort must contact Michael Ciaciuch, Contract Specialist, at e-mail michael.r.ciaciuch.civ@mail.mil before submitting a proposal.

II. GENERAL

A. This acquisition is unrated under the Defense Priorities and Allocations System (DPAS).

B. Bids must be received by ACC-WRN no later than 3:00 PM EDT (1500 hours) local Warren, MI time, 4 APRIL 2017. E-mail bid to michael.r.ciaciuch.civ@mail.mil. Offeror must be registered in System for Award Management (SAM) prior to receiving an award. Refer to website https://www.sam.gov/portal/public/SAM/.

PERFORMANCE WORK STATEMENT (PWS)

Mastering Conflict Dynamics Training for PEO GCS 16-18 May 2017 Solicitation W56HZV-17-T-L552

Part 1 General Information

1. GENERAL: This is a non-personnel services contract to provide Mastering Conflict Dynamics Program Training. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Mastering Conflict Dynamics Program Training as defined in this Performance Work Statement (PWS) except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this Contract.

1.2 Background: The Contractor has provided Mastering Conflict Dynamics Program Training in the past to multiple agencies and organizations. The Mastering Conflict Dynamics Program training service will provide leaders and managers methods and techniques on how to recognize unresolved conflicts among individuals, teams and organizations.

1.3 Objectives: The Contractor shall provide a training program that provides participants an increased awareness of the root causes of conflict and helps them acquire new skills for effectively assessing and resolving conflict. The Contractor shall provide this through a variety of teaching techniques including lectures, simulations, group exercises and personal feedback. The three-day Training Program shall be conducted 16-18 May 2017 for 15-18 PEO GCS personnel on-site in Warren, MI, and performed in accordance with this PWS as well as the Contractor’s Letter of Agreement included with this Purchase Order as Attachment 0001.

1.4 Scope: The Contractor shall provide services as described herein as Mastering Conflict Dynamics Program training for PEO GCS participants.

1.5 Period of Performance: The Period of Performance (PoP) for this training shall be 16 May 2017 through 18 May 2017.

1.6 General Information

1.6.1 Recognized Holidays: The Contractor is not required to perform services on the listed holidays:

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1.6.2 Hours of Operation: The Contractor is responsible for conducting business between the hours of 8:00 a.m. through 4:30 p.m., Monday through Friday, except for Federal holidays (see Paragraph 1.6.1 above) or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for one of the above reasons. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Place of Performance: The work to be performed under this Contract shall be performed at the TACOM Life Cycle Management Command (LCMC) in Warren, MI, and as coordinated between the Government’s Contracting Officer’s Representative (COR) and the Contractor.

1.6.4 Type of Contract: The Government will award a Firm-Fixed Price contract to accomplish this effort.

1.6.5 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for the Contractor’s use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.6.6 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the Contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs and specifications; monitor the Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government-furnished property (if applicable); and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which will be furnished to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting Contract award.

1.6.7 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their status as a Contractor is not obvious to third parties, are required to identify themselves as such in order to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractors are required to wear contractor badges in the performance of this service.

1.6.8 The Contractor is responsible for obtaining required identification cards, tags, and badges for personnel working on Government premises, in accordance with AR 600-8-14.

1.6.9 Contractor personnel performing services per this task order shall conform to all security requirements as specified in this Contract.

1.6.10 Contractor Travel: The Contractor shall arrange individual Contractor employee travel. The Contractor shall be required to travel from Tampa, FL to Warren, MI and return to Tampa, FL for a total of three individuals. The Contractor shall be required to travel CONUS and within the NCR during the performance of this Contract I order to conduct the Mastering Conflict Dynamics Program Training. The Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds clause as specified in this Contract. All travel requires Government approval/authorization and notification to the COR.

1.6.11 Organizational Conflict(s) of Interest: Contractor and subcontractor personnel performing work under this Contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

2. GOVERNMENT FURNISHED ITEMS:

2.1. Services: none

2.2 Facilities: The Government will provide training rooms at the TACOM Life Cycle Mangement Command in Warren, MI for training purposes.

PART 3

CONTRACTOR FURNISHED ITEMS AND SERVICES

3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

3.1 General: The Contractor shall furnish all materials and services required to perform work under this Contract that are not listed under Section 4 of this PWS.

3.2 Materials: The Contractor shall provide training course materials to include: folders, handouts, development guide (Managing Conflict: A Practical Approach) and other items as detailed in Attachment 0001.

PART 4

SPECIFIC TASKS

4. Specific Tasks:

4.1 Basic Services: The Contractor shall provide services for the below listed tasks:

4.1.1 The Contractor shall facilitate classroom exercises, to include a Costs of Conflict multi-phase interactive exercise, Solving Team Conflict activity, and Communicating Effectively activity in conjunction with the training objectives.

4.1.2 The Contractor shall provide a Conflict Dynamics Profile (CDP) 360-degree feedback tool that assesses effective and non-effective responses to workplace conflict and identifies causes of interpersonal conflict.

4.1.3 The Contractor shall provide a one-on-one personal feedback session with a feedback coach to help participants understand and interpret data from the Conflict Dynamics Profile (CDP).

4.1.4 The Contractor shall provide feedback on the Kirton Adaption-Innovation Inventory (KAI) or Change Style Indicator (CSI) and the R2 Strengths Profiler surveys.

4.1.5 The Contractor shall provide Conflict Vignettes to participants on actual past or current conflict situations. These Vignettes shall not be video recorded.

4.1.6 The Contractor shall provide an hour and a half (90 minute) one-on-one consultation session in order to discuss the partipants’ feedback, program content or particular issues in the workplace.

4.2 Contractor Manpower Reporting (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this Contract. The Contractor shall completely fill in all the information in the format using the following web address: https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the Period of Performance not to exceed 12 months ending September 30 of each Government Fiscal Year and must be reported by 31 October of each Calendar Year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website.

TECHNICAL EXHIBIT 1

Performance Requirements Summary (Sample)

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard
Performance Threshold
Method of Surveillance

PRS # 1. The Contractor shall provide Mastering Conflict Dynamics Training to include: Costs of Conflict multi-phase interactive exercise, Solving Team Conflict activity, Communicating Effectively activity, Conflict Dynamics Profile (CDP) 360-degree feedback tool, one-one- personal feedback session with a feedback coach, Kirton Adaption-Innovation Inventory (KAI) or Change Style Indicator (CSI) and R2 Strengths Profiler surveys, Conflict Vignettes, and a 1.5 hour one-on-one consultation session

PWS 4.1.1, 4.1.2, 4.1.3, 4.1.4, 4.1.5, 4.1.6

100% training
100% error free
100% Inspection

(end of Performance Work Statement)

1. SOLICITATION PROVISIONS AND CONTRACT CLAUSES

The following provisions and clauses apply to this Combined Synopsis/Solicitation:

CLAUSES INCORPORATED BY REFERENCE

52.212-1Instructions to Offerors-Commercial Items (OCT 2015)
52.247-34F.O.B. Destination (Nov 1991)
252.204-7006Billing Instructions (OCT 2005)
252.225-7001Buy American and Balance of Payments Program (NOV 2014)
252.246-7000Material Inspection and Receiving Report (MAR 2008)
52.204-7System for Award Management OCT 2016
52.204-9Personal Identity Verification of Contractor Personnel JAN 2011
52.204-13System for Award Management Maintenance OCT 2016
52.204-18Commercial and Government Entity Code Maintenance JUL 2016
52.204-19Incorporation by Reference of Representations and Certifications DEC 2014
52.222-1Notice To The Government Of Labor Disputes FEB 1997
52.222-40Notification of Employee Rights Under the National Labor Relations Act DEC 2010
52.222-41Service Contract Labor Standards MAY 2014
52.222-44Fair Labor Standards And Service Contract Labor Standards-Price Adjustment

MAY 2014

52.223-11Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons JUN 2016
52.223-18Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011
52.225-20Prohibition on Conducting Restricted Business Operations in Sudan--Certification

AUG 2009

52.229-4Federal, State, And Local Taxes (State and Local Adjustments) FEB 2013
52.232-11Extras APR 1984
52.232-39Unenforceability of Unauthorized Obligations JUN 2013
52.233-1Disputes MAY 2014
52.237-2Protection Of Government Buildings, Equipment, And Vegetation APR 1984
52.242-17Government Delay Of Work APR 1984
52.246-4Inspection Of Services--Fixed Price AUG 1996
252.203-7000Requirements Relating to Compensation of Former DoD Officials SEP 2011
252.203-7002Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005Representation Relating to Compensation of Former DoD Officials NOV 2011
252.204-7000Disclosure Of Information OCT 2016
252.204-7003Control Of Government Personnel Work Product APR 1992
252.204-7006Billing Instructions OCT 2005
252.204-7008Compliance With Safeguarding Covered Defense Information Controls OCT 2016
252.204-7015Notice of Authorized Disclosure of Information for Litigation Support MAY 2016
252.223-7006Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.225-7002Qualifying Country Sources As Subcontractors DEC 2016
252.232-7003Electronic Submission of Payment Requests and Receiving Reports JUN 2012
252.232-7003Electronic Submission of Payment Requests and Receiving Reports JUN 2012
252.232-7010Levies on Contract Payments DEC 2006
252.237-7010Prohibition on Interrogation of Detainees by Contractor Personnel JUN 2013
252.243-7001Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.201-4000 (TACOM) ARMY CONTRACTING COMMAND – WARREN (DTA) OMBUDSPERSON (APR 2011)

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

[End of Provision]

52.204-4016 (Warren) Electronic Contracting (AUG 2015)

(a) All Army Contracting Command – Warren (DTA) solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.

2. Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

4. FBO will send an email to vendor’s registered email address confirming the electronic submission.

5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide – Section 4.3.1 “Submitting an Electronic Response” (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).

(d) Note to offerors: Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the Army contracting Command - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified. It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission. Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified in Block 10 on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptacus.org/ to locate a regional center.

[End of Notice]

52.204-4020 (TACOM) ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES (MAR 2015)

a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management (see clause 52.204-4600 “Trusted Associate Sponsorship System (TASS) Program”).

c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see provision (TACOM) 52.215-4405 “Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement”), or at OCONUS locations, in accordance with Status of Forces Agreement and other theater regulations.

(End of Clause)

52.204-4023 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON) JUN 2014

Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

(End of Clause)

52.204-4024 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP) JUN 2014

In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc).

(End of Clause)

52.209-4011 (TACOM) CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD (JUL 2016)

(a) The Government will award a contract to the offeror that:

(1) submits the lowest evaluated offer if award is based on price only, or the offer that provides the best value to the Government if factors in addition to price are identified elsewhere in this solicitation, and

(2) submits a bid or proposal that meets all the material requirements of this solicitation, and

(3) meets all the responsibility criteria at FAR 9.104.

(b) To make sure that an offeror meets the responsibility criteria at FAR 9.104 the Government may:

(1) arrange a visit to the offeror’s plant and perform a preaward survey;

(2) ask the offeror to provide financial, technical, production, or managerial background information.

(c) If the offeror does not provide the Government with the data requested within 7 days from the date the requested is received, or if the offeror refuses to have an onsite visit to the offeror’s facility, the Government may determine the offeror to be nonresponsible.

(d) If the Government visits the offeror’s facility, please make sure that current certified financial statements and other data relevant to the bid or proposal available for Government personnel to review.

(End of Provision)

52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (JAN 2017)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. If repair/replacement or re-performance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights

(1) within a reasonable time after the defect was discovered or should have been discovered; and

(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Government-wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes'', as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer--Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.--

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order: (1) the schedule of supplies/services; (2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause; (3) the clause at 52.212-5; (4) addenda to this solicitation or contract, including any license agreements for computer software; (5) solicitation provisions if this is a solicitation; (6) other paragraphs of this clause; (7) the Standard Form 1449; (8) other documents, exhibits, and attachments; and (9) the specification.

(t) System for Award Management (SAM). (1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an ``I agree'' click box or other comparable mechanism (e.g., “click-wrap”' or “browse-wrap”' agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2017)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

_X_ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small…