Attachment_0005,_Maintenance_Analysis_29May14_RESERVED.docx
DOCX document 32 KB Posted
- Attached to
- Light Engineer Utility Trailer (LEUT) Type II
- Solicitation number
- W56HZV-16-R-0210
About this file
Attachment 0005, Maintenance Analysis 29May14 RESERVED
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0005 SUMMARY TITLE: Maintenance Analysis/Supportability Analysis
SPECIFIC INSTRUCTIONS: The contractor shall document a Maintenance Analysis Summary for the system. This summary will identify each repairable item and may be used to verify that the maintenance actions and support structure are aligned with the government’s requirements and maintenance concept. The repairable items should be identified by end item hardware, breakdown/disassembly sequence. The summary should identify all preventive and corrective maintenance actions along with the required spares and support equipment to perform each maintenance task. The Annual Maintenance Man hour data will be used to prepare the Basis Of Issue Plan (BOIP) Feeder Data. The summary data can also be used to develop the Maintenance Allocation Chart (MAC).
DATA IN LMI SPECIFICATION MIL-PRF-49506:
• Task Frequency
• Task Time
• Mean Time To Repair (MTTR)
• Level of Maintenance
• Military Occupational Specialty (MOS)*
• Number of personnel required for task
• Annual Maintenance Man hours (AMMH)
• Failure Ratio
• Assumptions
• Constraints
• Tools required, specific
• Maintenance Function/Task
DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):
Title: Maintenance Analysis/Supportability Analysis Required Data Elements:
• Indenture Code
• Component/Assembly Name
• Component Part Number & Commercial And Government Entity Code (CAGEC)
• Source, Maintenance & Recoverability (SMR) Code
Additional data elements may be added at the contractor’s discretion.
Format: Contractor’s format using Microsoft Excel
*Government Provided.
SUMMARY LAYOUT Contractor Provided
File details come from the government source that posted it.