W56hzv16R0092_SOLICITATION_DRAFT_RELEASE_21_AUG_2017.pdf
PDF 587 KB Posted
- Attached to
- SETS, KITS, AND OUTFITS OF HAND TOOLS
- Solicitation number
- W56HZV16R0092
About this file
Draft solicitation subject to change
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0627A0000-EH7TD024EH.zip | ZIP file | |
| Instructions_to_view_TDPs.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-16-R-0092
COLETTE THOMAS (586)282-7439
COLETTE.F.THOMAS.CIV@MAIL.MIL
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
332216
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 48
DRAFT
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: COLETTE THOMAS
Buyer Office Symbol/Telephone Number: CCTA-HCP-A/(586)282-7439
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.201-4000 ARMY CONTRACTING COMMAND-WARREN (DTA) OMBUDSPERSON APR/2011
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
[End of Provision]
2 52.212-4003 ALL OR NONE--COMMERCIAL ITEM ACQUISITION SEP/1996
(TACOM)
This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS.
Paragraph (h) is modified to say that you must offer to provide the total quantity of the items in this solicitation. ONLY ONE AWARD
WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS
SOLICITATION WILL NOT BE CONSIDERED FOR AWARD.
[End of Clause]
3 52.214-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date in the box below:
: Amendment Number : Date : ________________________________________________
[End of Provision]
1. Solicitation, W56HZV-16-R-0092 for the General Mechanics Tool Kit will be issued as an other than full and open, limited source, firm fixed price buy and will result in an Indefinite Delivery, Indefinite Quantity (IDIQ) Contract for 5 one-year ordering periods. The List of Attachments, Section J, define all of the requirements for the General Mechanics Tool Kit.
2. Estimated maximum total contract quantity is 30,330 EA. The Ordering Periods are as follows:
Base Period Date of Award- 364 Days After Award
Ordering Period 2: 365 Days After Award- 729 Days After Award
Ordering Period 3: 730 Days After Award- 1,094 Days After Award
Ordering Period 4: 1,095 Days After Award- 1,459 Days After Award
Ordering Period 5: 1,460 Days After Award- 1,824 Days After Award
2 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
3. The procurement is to be a lowest price techinically acceptable, limited source acquisition in accordance with FAR 15.101-2(a). The
Government will select a contractor based on the criteria set forth under section M:"Evaluation Factors for Award" titled "Evaluation
Criteria" of this Request for Proposal (RFP).
4. The Government intends to award one contract for the General Mechanics Tool Kit. See section L: "Instructions, Conditions and Notices to Offerors" Titled: "Instructions to Offerors" of the solicitation for proposal content and submission requirements. See section
"Evaluation Factors for Award" titled "Evaluation Criteria" for information on proposal evaluation and the basis for award.
5. Offerors must complete the Price Evaluation Sheet at Attachment 0002 in order to be considered for award.
6. The Product Verification Testing is due 90 days after issuance of a delivery order and in accordance with the Quality Assurance
Provisions. Before Product Verification Testing, the acquisition of materials or components for or the commencement of production is at the sole risk of the contractor. The contractor shall provide written documentation for the tool chest. The contractor shall incorporate the Government's recommended changes.
7. The Government intends to award without discussions, but reserves the right to conduct discussions if necessary. Therefore, it is imperative that your proposals contain all the information requested.
*** END OF NARRATIVE A0001 ***
3 48
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING PERIOD OF THE CONTRACT IS THE
DATE OF AWARD PLUS 364 DAYS.
SECOND ORDERING PERIOD OF THE CONTRACT IS 365
DAYS THROUGH 729 DAYS AFTER CONTRACT
AWARD.
THIRD ORDERING PERIOD OF THE CONTRACT IS 730
DAYS THROUGH 1,094 DAYS AFTER CONTRACT
AWARD.
FOURTH ORDERING PERIOD OF THE CONTRACT IS 1,095
DAYS THROUGH 1,459 DAYS AFTER CONTRACT
AWARD.
FIFTH ORDERING PERIOD OF THE CONTRACT IS 1,460
DAYS THROUGH 1,824 DAYS AFTER CONTRACT
AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL
ORDER IS THE PRICE FOR THE ORDERING PERIOD
IN WHICH THE ORDER IS ISSUED. THE DELIVERY DATE
DOES NOT DETERMINE THE ORDERING
PERIOD.
The information presented below applies to Item
No. 0011-0015:
Minimum 5-Year Quantity: 1,011
(This will be ordered at the time of the basic contract award).
Maximum 5 Year Quantity: 30,330(Inclusive of
Option PERIOD, if applicable)
ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.
NOTE: EACH ORDERING PERIOD ESTIMATE, AS WELL AS
EACH OPTION PERIOD ESTIMATE, IF
APPLICABLE,
IS A 12 MONTH AVERAGE MONTHLY DEMAND WITH
CONTRACT FACTORS BUILT IN AND A 25% INCREASE
PER YEAR.
CAUTION: OFFERORS MUST SUBMIT OFFERS
ELECTRONICALLY IN ACCORDANCE WITH DIRECTIONS
IN THE TACOM-WARREN PROCUREMENT NETWORK
WEBPAGE AT:
http://contracting.tacom.army.mil/acqinfo/ebidnot ice.htm
ALL OFFERS MUST INCLUDE A SIGNED SF33/SF 1449
COVER SHEET.
SEE PARAGRAPH (d) OF CLAUSE 52.204-4016, TACOM-
WARREN ELECTRONIC
CONTRACTING, OF THIS SOLICITATION FOR INSTRUCTION ON
HOW TO SUBMIT YOUR OFFER.
(End of narrative A001)
0011 GENERAL MECHANICS TOOL KIT
NSN: 5180-01-605-5146
0011AA FIRST ORDERING PERIOD $ ___________________________ __________________
4 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Range Pricing
COMMODITY NAME: GENERAL MECHANICS TOOL KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
700 2000 $
2001 3000 $
3001 4000 $
4001 5000 $
5001 6000 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
5 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 GENERAL MECHANICS TOOL KIT
NSN: 5180-01-605-5146
0012AA SECOND ORDERING PERIOD $ ___________________________ __________________
See Range Pricing
COMMODITY NAME: GENERAL MECHANICS TOOL KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
450 950 $
951 1250 $
1251 1800 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
6 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 GENERAL MECHANICS TOOL KIT
NSN: 5180-01-605-5146
0013AA THIRD ORDERING PERIOD $ ___________________________ __________________
See Range Pricing
COMMODITY NAME: GENERAL MECHANICS TOOL KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
450 950 $
951 1250 $
1251 1800 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
7 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 GENERAL MECHANICS TOOL KIT
NSN: 5180-01-605-5146
0014AA FOURTH ORDERING PERIOD $ ___________________________ __________________
See Range Pricing
COMMODITY NAME: GENERAL MECHANICS TOOL KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
450 950 $
951 1250 $
1251 1800 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
8 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0015 GENERAL MECHANICS TOOL KIT
NSN: 5180-01-605-5146
0015AA FIFTH ORDERING PERIOD $ ___________________________ __________________
See Range Pricing
COMMODITY NAME: GENERAL MECHANICS TOOL KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
450 950 $
951 1250 $
1251 1800 $
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
9 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0016 PRODUCT VERIFICATION TEST
NSN: 9999-99-999-9
0016AA PRODUCT VERIFICATION TEST REPORT $ $ ________________________________ ______________ __________________
COMMODITY NAME: PRODUCT VERIFICATION TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 90
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
10 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0017 REPLACEMENT WARRANTY GMTK
0017AA REPLACEMENT WARRANTY $ $ __________________________ ______________ __________________
COMMODITY NAME: REPLACEMENT WARRANTY GMTK
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W911RQ) XR W0MC USA DEP RED RIVER
DIR FOR CONTRACTING KO
100 MAIN DRIVE BUILDING 431
TEXARKANA,TX,75507-5000
0018 DATA ITEM _________
The below ELIN is associated with Section J, see
Attachment 0006-SOW for Digital Images.
(End of narrative A001)
A001 DATA ITEM-DIGITAL PHOTOS $ ** NSP ** ________________________ __________________
SERVICE REQUESTED: DIGITAL PHOTOS
Deliveries or Performance _________________________
11 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION MAY/2014
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[x ] 2. The TDP for this solicitation resides within FedBizOpps (https://www.fbo.gov), associated with this solicitation number, and can be accessed via this URL:
://www.fbo.gov/notices/274afbc9b0848a174c0079b029dd04a7
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, go to http://www.dlis.dla.mil/jcp/
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the
TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://HYPERLINK - on the right is User Guides - click on Vendor.
[End of clause]
12 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2 52.211-4008 DRAWING LIMITATIONS NOV/2005
(TACOM)
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) YOU ARE RESPONSIBLE for producing the shop or process drawings needed to cover intermediate steps in the manufacturing ___________________ process.
(d) You, the contractor, are responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
(End of Clause)
13 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
SECTION D COMMERCIAL PACKAGING REQUIREMENTS
PRESERVATION AND PACKAGING
NSN: 5180-01-548-7634
ITEM: Tool Kit, General Mechanics
PRESERVATION: COMMERCIAL
LEVEL OF PACKING: COMMERCIAL
QUANTITY PER UNIT PACKAGE:-001-
1 Packaging. Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a _________ minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
1.1 Cleanliness. Items shall be free of dirt and other contaminants which would contribute to the ___________ deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants. Cleaning may be any suitable process that is not injurious to the item or the protective finish.
1.2 Preservation. Items susceptible to corrosion or deterioration shall be provided protection by means of ____________ preservative coatings, volatile corrosion inhibitors, desiccants, waterproof and or watervaporproof barriers.
1.3 Cushioning. Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, __________ material critical) or which could cause physical damage to other items shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration to prevent damage during handling and shipment. Items of a delicate nature shall not be subjected to damage from rugged items contained within the kit. Non-critical items of odd shapes or having sharp protrusions will not damage other items or protective barriers.
2 Unit Package. A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), ____________ and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of a unit package shall be a container such as a sealed bag, carton or box. Unit packs shall be designed to have minimum size and weight while retaining the protection required and enhancing standardization.
3 Unit Package Quantity. Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc. _____________________
4 Intermediate Package (as applicable) Intermediate packaging is required whenever one or more of the following conditions exist: ____________________
a. the quantity is over one (1) gross of the same national stock number,
b. use enhances handling and inventorying,
c. the exterior surfaces of the unit pack is a bag of any type, regardless of size,
d. the unit pack is less than 64 cubic inches,
e. the weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.
Intermediate containers shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.
5 Shipping Containers. Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed ___________________ in shipping containers. All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the items. The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
6 Unitization. Shipments of identical items going to the same destination shall be palletized if they have a total cubic ___________ displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads shall be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two pallet loads high and wide in a conveyance. The weight capacity of the pallet shall be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the contracting office prior to implementation.
The load shall be contained in a manner that will permit safe handling during shipment and storage.
7 Marking. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in _______ accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not
14 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors shall check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/rfid/index.htm for the current DoD Suppliers Passive RFID Information Guide and Supplier
Implementation Plan. If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.
8 Hazardous Materials (as applicable): Hazardous Materials is defined as a substance, or waste which has been determined by the ____________________________________
Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
When applicable, the packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
International Air Transport Association (IATA) Dangerous Goods Regulations
International Maritime Dangerous Goods Code (IMDG)
Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
Product Material Safety Data Sheet (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
9 Heat Treatment and Marking of Wood Packaging Materials. All non-manufactured wood used in packaging shall be heat treated to a core ______________________________________________________ temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. . Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program.
In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
10 Quality Assurance. The contractor is responsible for establishing a quality system. Full consideration to examinations, _________________ inspections, and tests will be given to ensure the acceptability of the commercial package. All items, packing configurations, and markings supplied under this contract shall be identical to the first article
11 Supplemental Instructions. The General Mechanics Tool Kit shall be placed into a fiberboard container conforming to ASTM-D5118, _________________________
RSC. This will serve as the unit and shipping container. Items within foam organizers may not require packaging if placed in a dedicated position within the case, where there is no potential for corrosion or physical damage and can be identified by a layout plan.
Items susceptible to corrosion shall be protected with the use of Volatile Corrosion Inhibitors (VCI) or Desiccant packs. Where VCI is used, electric or battery operated devices, batteries, natural or synthetic rubber, optical systems, or precision moving parts shall be placed in a heat sealed bag to prevent exposure to vapors. Desiccant and VCI shall not be present in the same pack. The exterior unit pack shall be marked for handling to indicate that the load must be shipped and stored in the upright position only.
Manuals, parts lists, and warranty information shall be packed in sealed water proof packaging that is reusable, i.e. zip lock bag.
Packing Lists shall be sealed in water-resistant envelopes and secured to the exterior of the load or crate in the most protected location.
(End Statement of Work: SECTION D COMMERCIAL PACKAGING REQUIREMENTS)
*** END OF NARRATIVE D0001 ***
15 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.209-4000 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE MAR/2000
(TACOM)
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of one that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of two that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
4 52.209-4512 FIRST ARTICLE TEST (CONTRACTOR TESTING) MAR/2008
TACOM (RI)
a. The product verification shall be examined and tested in accordance with contract requirements, the item specification(s), Quality
Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The product verification shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the product verification sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The product verification shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the Product Verification Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the Product Verification Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the product verification, and results of the tests are submitted with the Product Verification Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the product verification and results of the tests are submitted with the Product Verification Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the Product Verification Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the product verification was selected.
e. A Product Verification Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The Product Verification Report shall include actual
16 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the Product Verification Report will be copy furnished to -1-.
f. Notwithstanding the provisions for waiver of product verification, an additional product verification sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional product verification sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional product verification testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.
(ES6026) (End of Clause)
5 52.246-4028 INSPECTION AND ACCEPTANCE POINTS: ORIGIN NOV/2005
(TACOM)
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
[End of Clause]
6 52.246-4049 DRAWINGS FOR INSPECTION--COMMERCIAL ITEMS AUG/2007
(TACOM-WARREN)
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings and specifications will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Governments inspection requirements.
(c) The Government may rely on the contractors Certificate of Conformance, as outlined in FAR 52.246-15, that the commercial item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the contractor be required to make available to the Government drawings, specifications or other technical data such that the Government can determine if the commercial item meets the contract requirements. These conditions may include but not be limited to the following: 1.) Complex items or items which have quality characteristics, for which contractual conformance must be established through precise measurements and functional operation either as an individual item or in conjunction with other items. 2.) Items used in critical applications or items denoted as critical on technical data. 3.) Items with known quality conformance issues. 4.) Items with an unstable design history. 5.)
Contractor changes in technical requirements, technical data, and/or production processes which impacts the fit, form or function of the item.
[End of clause]
17 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
2 52.242-15 STOP-WORK ORDER AUG/1989
3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
4 52.247-34 F.O.B. DESTINATION NOV/1991
5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
6 52.247-4456 LONG TERM CONTRACTS - FOB DESTINATION OCT/1999
(TACOM)
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 100% BR4 Red River
(End of Clause)
18 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type. Combo
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer. See FAR 52.246-4028
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC W56HZV
Admin DoDAAC TBD
Inspect By DoDAAC See Scheduled
Ship To Code See Schedule
Ship From Code See Schedule
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC Contact ACO
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
19 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system. N/A
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
20 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT CLAUSES
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.202-1 DEFINITIONS NOV/2013
2 52.203-3 GRATUITIES APR/1984
3 52.203-7 ANTI-KICKBACK PROCEDURES MAY/2014
4 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
5 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS MAY/2014
6 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS NOV/2016
7 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN JAN/1999
8 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES OCT/2016
9 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015
10 52.222-26 EQUAL OPPORTUNITY SEP/2016
11 52.232-25 PROMPT PAYMENT JAN/2017
12 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013
13 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR/2012
14 252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS FEB/2014
15 252.225-7036 BUY AMERICAN--FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM-- DEC/2016
BASIC
16 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012
17 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR JUL/2014
EXECUTIVE ORDERS--COMMERCIAL ITEMS
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22U.S.C. 7104(g)).
--Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_x__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995)(41 U.S.C. 4704 and
10 U.S.C. 2402).
_x__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of
Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_x__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved].
___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section
743 of Div. C).
__x_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment (Aug 2013) (31 U.S.C. 6101 note).
__x_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012)(section 740 of Division C of Public
Law 111-117, section 743 of Division D of Public Law 111-8, and section 745 of Division D of Public Law 110-161)
21 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
___ (11) 52.219-3, Notice of Total HUBZone Set-Aside or Sole-Source Award (Nov 2011)(15 U.S.C. 657a).
___ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (13) [Reserved]
___ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011) of 52.219-6.
___ (iii) Alternate II (Nov 2011) of 52.219-6.
___ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003)(15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
__x_ (16) 52.219-8, Utilization of Small Business Concerns (MAY 2014) (15 U.S.C. 637(d)(2) and (3). ____
_x__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jul 2013)(15 U.S.C. 637 (d)(4)). _____
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (Jul 2010) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
___ (19) 52.219-14, Limitations on Subcontracting (Nov 2011)(15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages--Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008)(10 U.S.C. 2323)
(if…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .