ACC15-900.pdf
PDF 414 KB Posted
- Attached to
- ACC WARREN
- Solicitation number
- W56HZV13R0501
About this file
ACC15-900
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CMO Control No.:14-056 M242 Gun Drive Motor Repair
Est. Dollar Value: $4,500,000
b. Acquisition data availability. Skurka Aerospace is the proprietary owner of the Technical Data Package (TDP) as it developed this item for the original manufacturer of the M242 25mm Gun, McDonnell Douglas, for integration of the weapon on the Bradley Fighting Vehicle. As such, the Government does not have the technical data rights to allow for full and open competition. No actions are being taken to increase competition at this time reasons stated in paragraph 6 above.
c. Unusual and compelling urgency. N/A
d. Subcontracting Competition. FAR clause 52.244-5 Competition in Subcontracting will be included in the resultant contract to assure Skurka Aerospace selects subcontractors (including suppliers) on a competitive basis to the maximum extent practical.
11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Name: Paul Petersen Date:_____9/13/2013________________ Title: Actg Chief , Artillery and Mortars Br Signature:_//Signed//_Paul Petersen_____
12. Requirement Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Name: Wayne Schaaf Date:_____12/20/13_______________ Title: PSID Weapons Director Signature:_//signed// Wayne J.
Schaaf
13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be determined fair and reasonable based on cost and price analysis. Certified cost or pricing data will be required in accordance with FAR 15.403-4(a)(1). The Contracting Officer will rely on Certified Cost or Pricing Data for the fair and reasonable price determination.
Name: Matthew R. Jewell Date:__20 December 2013___ Title: Contracting Officer Signature:___//MRJ//________
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .