W56HZV-20-Q-0115 Basic.pdf
PDF 180 KB Posted
- Attached to
- Fixture Tru Alignment - Amendment 001 Federal contract opportunity
- Solicitation number
- W56HZV-20-Q-0115
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV-20-Q-0115 Amend 0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W56HZV-20-Q-0115 2021JUN09 DOA4
W56HZVACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
RISING ORIS (586)282-3523
CCTA-HDB-S
EMAIL: RISING.M.ORIS.CIV@ARMY.MIL
X
2021JUN30
1 58
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: RISING ORIS
Buyer Office Symbol/Telephone Number: CCTA-HDB-S/(586)282-3523
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
This solicitation is intended to result in the award of a single requirements contract for the estimated supplies specified. The resulting contract will establish pricing to be utilized through issuance of delivery orders for discrete quantities for the period stated in the schedule. The Government bears no responsibility to issue an initial minimum order upon base contract award. For further guidance related to a Requirements type contract, see FAR clause 52.216-21, Requirements.
Fixture, Tru Alignment Part Number 5002720 is a Tank, M1 Abrams Family of Vehicles (FOV) spares.
All contractors are to quote the required part for shipment to the Government. DCMA may monitor the loading/shipment.
*** END OF NARRATIVE A0003 ***
THIS IS A SOLICITATION NOTICE
The U.S. Army Contracting Command Warren, Michigan intends to issue an 18 month Requirement Contract with an estimated maximum quantity of 32 each for the following:
Proposed procurement for:
NSN: 4931-01-152-9871
P/N: 5002720
Cage: 19200
Noun: Fixture,tru Alignme
NAICS: 333514
Firm Fixed Price Contract (FFP)
Estimated Maximum Quantity: 32 Each
Note: THE ORDERING PERIOD QUANTITY IS AN ESTIMATE THAT MAY BE ORDERED
OVER AN 18 MONTH PERIOD
EST = ESTIMATE
All shipments will be FOB Destination.
A. 01 Electronic Contracting
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website (www.sam.gov
). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal beta.SAM.gov, however until beta.SAM.gov can accept proposals Offerors should follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov the site have been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist (rising.m.oris.civ@mail.mil) and cc the corresponding Contracting Officer (james.r.jones3.civ@mail.mil) with the subject header: Proposal Submission - W56HZV-20-Q-0088
(company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
2 58
W56HZV-20-Q-0115 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.
All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), Offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore Offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A. 02 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) Only one award will be made as a result of this solicitation.
(2) Offers submitted for less than the total quantities of all the items in this solicitation will be deemed nonresponsive.
A. 03 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A. 04 ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/accwrn/CompMgmtOffice.html .
A. 05 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title
22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via beta.SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six
(6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
AS7527
A._06_NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of
ID badges, etc).
*** END OF NARRATIVE A0001 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
FIRST ORDERING PERIOD OF THE CONTRACT IS THE DATE OF
AWARD PLUS 546 DAYS.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS_____
THE PRICE FOR THE ORDERING PERIOD IN WHICH THE ORDER
IS ISSUED. THE INFORMATION PRESENTED BELOW APPLIES
TO CLIN No. 0011:
Contract Estimated Quantitites______________________________
CLIN 0011
Noun: Fixture,Tru Alignment (PERIOD 1)
Estimated Quantity: 32 EA
Note: EACH ORDERING PERIOD QUANTITY IS AN ESTIMATE_____
THAT MAY BE ORDERED OVER AN 18 MONTH PERIOD.
EST = ESTIMATE
(End of narrative A001)
0011 FIRST ORDERING PERIOD - FIXTURE, TRU ALIGMENT EST 32(E) EA $ $ _____________________________________________ ______________ __________________
NSN: 4931-01-152-9871
COMMODITY NAME: FIXTURE, TRU ALIGNMENT
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 54490
Mfr Part Number: 5002720
PROGRAM YEAR: 1
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 5002720
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
PACKAGING REQUIREMENT IN SECT D
UNIT PACK: 1
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0021 DATA ITEM: FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** ____________________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST REPORT
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENT OF THE CLAUSE ENTITLED "FIRST ARTICLE
APPROVAL - CONTRACTOR TESTING."
THE PRICE FOR FIRST ARTICLE TESTING IN THE TOTAL
AMOUNT OF $_____________, IS INCLUDED IN THE TOTAL
AMOUNT(S) FOR CLIN(S): 0001AA
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0210
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0031 BASIC CLIN FOR ELIN ___________________
A001 FIRST ARTICLE TEST REPORT (FATR) CONTRACTOR ___________________________________________
FACILITY 1 LO $ ** NSP ** ________ __________________
SERVICE REQUESTED: TEST/INSPECTION REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 01 TECHNICAL DATA PACKAGE INFORMATION
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the Beta System for Award Management (SAM) (https://beta.SAM.gov ) associated with this solicitation number:
To access the data through Beta.SAM:
a. Log on to the Beta.SAM web site: https://beta.SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and
Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. Beta.SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted.
Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-
8220. Vendors are responsible for placing correct information in Beta.SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
CONTRACT C REQUIREMENTS
C. 02
TDPL: 5002720:54490 TDPL DATE: 05/13/2019
NSN: 4931-01-152-9871 NOMENCLATURE : TRU ALIGNMENT FIXTURE ASSY, THERMAL IMAG
ENGINEERING EXCEPTIONS: The Following Engineering Exceptions Apply To This Procurement Action(s):
DOCUMENT DELETE REPLACE WITH
PD 5002720 MIL-P-116 MIL-STD-2073
PD 5002720 MIL-B-117 MIL-DTL-117
10 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5002712,5002713 QQ-P-35 SAE-AMS-QQ-P-35
5002723
5002713 QQ-W-423 ASTM A313
5002738 MS18066-23 SET SCREW, #6-32NC-3A, 3/8 +/- .010 LONG,
HEXAGON SOCKET, FLAT POINT, SELF LOCK
ELEMENT, CRES.
GFM/GFE : DRAWING NO
*** END OF NARRATIVE C0001 ***
C.03 DRAWING LIMITATIONS
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
C.04 CONFIGURATION MANAGEMENT DOCUMENTATION
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
11 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of
EIA-649-1 for ECPs.
(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of EIA-649-1 for RFVs.
(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of EIA-649-1 for NORs.
(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
C. 05 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the
Procuring Contracting Officer (PCO).
C.06 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
12 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0003 ***
PACKAGING AND MARKING
Packaging Requirements Sheet
NSN: 4931-01-152-9871
Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
A. PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPI NUMBER5002720, DATED05 OCT 01, REV A
B. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
C. Marking: In addition to any special markings called out on the SPI;
C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information
Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be
2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard
Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection
Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
E. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of ______________________________________________________________________________ the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior________ to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
F. Hazardous Materials (as applicable):
F.1..Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
F.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
International Air Transport Association (IATA) Dangerous Goods Regulations
International Maritime Dangerous Goods Code (IMDG)
Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO
P4030.19/DLAM 4145.3 (for military air shipments).
F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent
Authority of the nation of origin and in accordance with regulations of all applicable carriers.
F.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS: N/A.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
"ISO 9001:2015" OR "EQUIVALENT"
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E. 01 REWORK AND REPAIR OF NONCONFORMING MATERIAL
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E._02_ INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E._03_ DRAWINGS FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable
Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
*** END OF NARRATIVE E0001 ***
E. 01 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.ccdc-ac.mbx.rdar-qep.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E. 02 DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E. 03 NOTICE REGARDING FIRST ARTICLE
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
*** END OF NARRATIVE E0002 ***
DELIVERIES OR PERFORMANCE
5 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
6 52.242-15 STOP-WORK ORDER AUG/1989
7 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
8 52.247-34 F.O.B. DESTINATION NOV/1991
9 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
10 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
Production
0011 Ordering Period 1 32 Each 420 DARO with FAT; 180 DARO without FAT
0021 1 Each 210 DARO
Quantities above represent the total estimated quantity for the ordering period.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
11 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html .
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Governments unit acquisition cost" means
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractors estimated fully burdened unit cost to the
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractors estimated fully burdened unit cost to the Government at the time of delivery.
"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the
Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459 .
"Issuing agency code" means a code that designates the registration (or controlling) authority for the enterprise identifier.
"Item" means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
"Lot or batch number" means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
"Machine-readable" means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
"Original part number" means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
"Parent item" means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
"Serial number within the enterprise identifier" means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
"Serial number within the part, lot, or batch number" means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
"Serialization within the enterprise identifier" means each item produced is assigned a serial number that is unique among all the tangible items produced by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .