Statement_of_Objectivies_Portable_Rail_Ramp_19_FEB.pdf
PDF 606 KB Posted
- Attached to
- Rail Ramps
- Solicitation number
- W564KV19RAMPS
About this file
DRAFT STATEMENT OF OBJECTIVES FOR RAIL RAMPS
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTABLE RAIL RAMP
STATEMENT OF OBJECTIVES
Portable rail ramp system that is transportable and capable of being assembled with minimal man power or material handling equipment with a rapid assembly time of two hours or less.
The basic objectives are:
1. Capable of supporting the M1A2 SEP v3 in rail movement configuration (65 Metric Tons).
2. Assembled without the need of hand tools by two personnel and one 4k forklift, with minimum components and ease of assembly in under 2 hours for ramp and matting.
3. Includes a track skirt for unloading to prevent damage to rail lines.
4. Transportable using a Palletized Loading System (PLS).
5. Capable of multi-functional loading to truck conveyances onto M872 trailer and
European low bed (not lowboy) trailers
6. Functional for loading/unloading at level railhead and remote track locations
7. Capable of working on level or irregular graded surfaces
8. Accommodates for two rail gauges: standard (1435mm) and broad gauge (1520mm)
9. 20 year service life
10. Operation Temperature -20 C to +45 C.
11. Approach Angle to loading ramp of less than 25 degrees
DRAFT
File details come from the government source that posted it.