8663_Rev_1.pdf

PDF 197 KB Posted

Attached to
24 X 48 Pallet Federal contract opportunity
Solicitation number
W53W9L-19-T-0001
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to 24 X 48 Pallet, newest first.
File Type Posted
First_Article_Delivery_Terms.pdf PDF
Certificate_of_Conformance.pdf PDF
Crane_Army_Pallet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING REVIEW CHECKLIST

Questions to be answered by Design Engineer:

Y N NA

1. Is there an alternate tool or design that could be used to perform this task?

if yes, please explain what and why not used (i.e., cost, time, etc.).

2. Are cracks, voids, weld seams, or other areas where explosives could accumulate eliminated if it is used in and explosive atmosphere?

3. Are all pinch points eliminated so that neither explosive can be pinched or personnel injured?

4. Is the material specified appropriate for explosive atmosphere if used in this environment?

5. Are all Electrical components properly rated for the type of location where it will be used?

7. Are all commercial components specified for use adequately rated for the type of location where it will be used?

8. Does the item have adequate safety interlocks designed (i.e., two-handed controls, etc.)?

9. Is the item strong enough to perform at 150% of intended use (i.e., weight, pressure, etc.)?

10. Is the item designed with ergonomic considerations (i.e., proper height, ?

repetitive movements, proper gripping, line of sight, strength required to operate?

11. Is the item designed for minimal maintenance and does it provide easy access if maintenance is required?

12. Is the item designed to allow lockout/tag out when maintenance is performed?

13. If required, can the item be decontaminated without destroying its intended use?

14. If required, had adequate special fire protection been built into the design?

15. Has the item been designed to interact with other components within the system?

REMARKS: (To add remarks, click on the "Comment" button at the top of the page.)

Signature

6. Is adequate guarding/shielding designed into the item?

REVISIONS

LTR DESCRIPTION DATE DATE

NOMENCLATURE MATERIAL

TITLE

ITEM

NO.

NO.

REQ'D

BREAK ALL

SHARP EDGES

UNLESS OTHERWISE NOTED, TOLERANCES ARE:

DECIMALS: .XXX .005, .XX .01, .X .1 ANGLES: 30'

FOR DRAWING NO.

CHECKED BY

FABRICATION

SAFETY

APPROVAL

DATE

DATE

DATE

DATE

DRAWN BY

DATE

C SCALE DWG. NO. SHEET

OF

CRANE ARMY AMMUNITION ACTIVITY

ENGINEERING DIVISION

7.06

14.19

21.25

28.31

35.44

15.75

26.75

48.00

24.00

11.25

A ADDED NOTES RJW 3/5/19

NOM. 2" X 4" X 48" LONG

NOM. 1" X 6" X 24" LONG

11 SEE

NOTE

NOTE:

1. NORMAL ACCEPTED FASTENING METHODS TO

BE USED IN CONSTRUCTION OF PALLET.

2. MATERIAL TO BE #2 CONSTRUCTION GRADE

LUMBER OR BETTER.

3. TOLERANCE TO BE .25.

DOES NOT APPLY TO MATERIAL LIST

4. MINIMUM NAIL REQUIREMENT: (9) TOTAL NAILS PER

1 X 6 BOARD. EACH 1 X 6 WILL CONTAIN (3) EACH

(8) PENNY RING SHANK NAILS ON 1 X 6 AND 2 X 4

JOINT. 1/4 8663 1 1

PALLET FOR DEMO AREA

11/17/99

RJ WILSON

4 NOV 1999

Sheet 1
Views
new_view_1
right_2
bottom_3
Design Checklist.pdf
10493 FACE TOOL SHOCK CHARGE.pdf
Sheet 1
Views
new_view_4
top_5
new_view_6
right_7
new_view_8
right_9
2019-03-05T15:47:14-0500
DANT.HAROLD.L.JR.1230337647
Check Box1: Off
Check Box2: Yes
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Yes
Check Box13: Off
Check Box14: Off
Check Box15: Yes
Check Box16: Off
Check Box17: Off
Check Box18: Yes
Check Box19: Yes
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Yes
Check Box25: Yes
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Yes
Check Box31: Off
Check Box32: Off
Check Box33: Yes
Check Box34: Off
Check Box35: Off
Check Box36: Yes
Check Box37: Off
Check Box38: Off
Check Box39: Yes
Check Box40: Off
Check Box41: Off
Check Box42: Yes
Check Box43: Off
Check Box44: Off
Check Box45: Yes
2019-03-05T09:59:38-0500
WILSON.ROBERT.J.1230335458

File details come from the government source that posted it.