W52P1J21R0052.pdf
PDF 227 KB Posted
- Attached to
- CXU-3 A/B Signal Cartridge
- Solicitation number
- W52P1J21R0052
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-21-R-0052 X
2021SEP30
2021NOV0301:00pm
DOA6
2021SEP30 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
JOSEPHINE L. HENNINGS
(309)782-3164
CCRI-AR
JOSEPHINE.L.HENNINGS.CIV@MAIL.MIL
1 89
X 1
X 5 X 8
X 11 X 13 X 25
X 32
X 34
X 37
X 61
X 62
X 76
X 84
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JOSEPHINE L. HENNINGS
Buyer Office Symbol/Telephone Number: CCRI-AR/(309)782-3164
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. This Request for Proposal (RFP) is issued to fulfill the U.S. Government's requirement for the production and delivery of CXU-3A/B
Signal Cartridge (smoke/cold) for the United States Air Force (USAF) and the United States Navy (USN). This RFP will be competed as a
100% Total Small Business Set-Aside.
2. The following items will be procured under this solicitation:
CLIN ITEM NSN______________________________________________________________________
0002 CXU-3A/B Signal Cartridge (USAF) 1325-01-112-8170
0004 CXU-3A/B Signal Cartridge (USN) 1325-01-088-4217
Note: CLINS 0001 and 0003 will be used for First Article Test Report (FATR) for the CXU-3A/B Signal Cartridges (smoke/cold).
3. The U.S. Government intends to award a Firm Fixed Price (FFP), five-year, Indefinite Delivery Indefinite Quantity (IDIQ) contract to the Offeror whose proposal represents the best value to the U.S. Government, non-price and price factors considered. The total minimum guaranteed quantity (MGQ) is a quantity of 30,000 each CXU-3A/B Signal Cartridges (smoke/cold) for the USAF. The U.S. Government is under no obligation to order more than the MGQ under this IDIQ contract. The MGQ will be awarded in the first delivery order which will be issued concurrently with the IDIQ contract award.
4. The resultant contract will consist of five Ordering Periods (OP) to award Fiscal Year (FY) 2022-2026 requirements. The Ordering
Periods are defined as follows:
Ordering Period 1: Date of Award through 365 Days After Award (DAA)
Ordering Period 2: 366 DAA to 730 DAA
Ordering Period 3: 731 DAA to 1,095 DAA
Ordering Period 4: 1,096 DAA to 1,460 DAA
Ordering Period 5: 1,461 DAA to 1,825 DAA
5. If the U.S. Government decides to order more than the MGQ, then the maximum quantities that may be ordered by the U.S. Government throughout the life of this contract, as a result of this RFP, is 340,000 each CXU-3A/B Signal Cartridges (smoke/cold) for the USAF, and
75,000 each CXU-3A/B Signal Cartridges (smoke/cold) for the USN.
6. Best value tradeoff procedures in accordance with FAR 15.101-1 will be utilized to select the Offeror that provides the overall best value to the U.S. Government. This best value source selection process will include an evaluation of the following three factors: (1)
Technical Ability, (2) Past Performance, and (3) Price. Section L provides specific instructions to Offerors regarding preparation and submittal of proposals. Evaluation of the proposals will be in accordance with the criteria stated in Section M. Award will be made to the Offeror whose proposal is determined to provide the best value to the U.S. Government based upon Section M criteria; therefore;
award may be made to other than the lowest priced Offeror, or other than the highest rated Offeror for the non-price factors.
7. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. The U.S.
Government will not make assumptions concerning an Offerors intent, capabilities, facilities or experience. The submission of CLEAR, ACCURATE, and COMPLETE information is the sole responsibility of the Offeror. Please ensure all fill-ins are completed, if applicable.
If fill-ins are not applicable, the Offeror shall indicate N/A. If the Offeror fails to include the information requested in Section L in its proposal, the Offerors proposal may be rejected by the U.S. Government and no longer considered for award.
8. The U.S. Government intends to award the contract resulting from this RFP without discussions (SEE FAR 52.215-1). The Contracting
Officer may contact Offerors for clarifications, as described in FAR 15.306(a) and FAR 52.215-1, without opening discussions. However, the U.S. Government reserves the right to conduct discussions, and to permit Offerors to revise its proposals if determined necessary by the Contracting Officer. The Offerors shall ensure its initial proposals contain the best terms and that proposals are complete, including all fill-ins and blanks.
9. Price Matrix - The Offeror shall submit a completed Price Matrix at Attachment 0001 in Section J. The pricing submitted in the Price
Matrix shall be fully executable by the U.S. Government at the unit prices and quantity range limits specified in the Price Matrix.
Prices are for FOB Destination to Letterkenny Munitions Center, Chambersburg, PA; Crane Army Ammunition Activity, Crane, IN; Tooele Army
Depot, Tooele, UT; and McAlester Army Ammunition Plant, McAlester, OK., with the exception of Foreign Military Sales, which will be FOB
Origin. Separately priced FATR CLINs shall also be completed for each item.
2 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
10. The M2A2 ammo cans and MK3 metal pallets required for packaging assembly will be provided as Government Furnished Material (GFM).
Navy Special Interface Gages will be provided as Government Furnished Property (GFP).
11. First Article Test - This RFP includes a separately priced FATR CLIN. FAT is required to be performed by the contractor, as described in Section E, E0006 - First Article Test (Contractor Testing) and clause 52.209-3, First Article Approval - Contractor Testing
(ALT 1). FAT shall be conducted 240 days after issuance of the Delivery Order. FATR shall be submitted no later than 270 days after issuance of the Delivery Order. Once submitted the U.S. Government has 30 days to provide disposition. FATR approval is required before production can commence. If there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in place of performance, manufacturing process, material used, or source of supply, the U.S. Government may require the contractor to perform an additional FAT at the contractors expense (reference Section E, E0006 - First Article Test (Contractor Testing). Offerors are required to propose separate prices for FAT for each ordering period.
12. If the Delivery Order is issued with FAT, then deliveries shall commence 365 days after issuance of the Delivery Order. After the first delivery order, subsequent delivery orders will be issued with or without FAT. If the Delivery Order is issued without FAT, then monthly deliveries will continue at the same rate and immediately after the delivery schedule in place for the items previously on contract. The delivery schedule will be set forth in Section B of each Delivery Order. Early deliveries, defined as deliveries occurring prior to the scheduled month, require prior written authorization from the Contracting Officer.
13. This solicitation will utilize the Acquisition Source Selection Interactive Support Tool (ASSIST) during the source selection evaluation process. A separate tool, the ASSIST2Industry, will be used in conjunction with ASSIST to accomplish all exchanges if applicable with Offerors after receipt of proposals pursuant to Federal Acquisition Regulation (FAR) 15.306. ASSIST2Industry provides the ability for the U.S. Government to issue, and the Offerors to receive and respond to, all Evaluation Notices (ENs) in a secure online environment. However, the U.S. Government reserves the right to work outside of ASSIST if it is determined necessary and in the best interest of the source selection.
14. The Technical Data Package (TDP) associated with the CXU-3 A/B Signal Cartridge is classified as Distribution D, Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors Only. These documents contain technical data whose EXPORT is restricted by the Arms Export Control Act (Title 22, U.S.C., SEC 2751, ET SEQ.) for the Export Administration Act of 1979, as Amended, titled, 50 U.S.C. App 2240 Et Seq. Violations of these export laws are subject to severe penalties. Dissemination shall be in accordance with provisions of DoD Directive 5230.25. If Offerors want to become certified in order to receive the Technical Information for this solicitation they must fill out a registration form at: https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/
. To obtain the Technical Information for this solicitation, the Offeror must request explicit access through the "attachments/links" tab in Sam.gov under RFP W52P1J-21-R-0052. An Offeror must have an approved DD form 2345, Military Critical Technical Data Agreement, on file with the Joint Certification Program (JCP) in order to be granted access to the Technical Information. Restricted technical data will not be available to an Offeror who has not been certified.
15. The U.S. Government anticipates price competition; therefore, certified cost or pricing data is not required to be submitted with the Offerors initial proposal. However, the U.S. Government reserves the right to require certified cost or pricing data, or other than certified cost or pricing data, in accordance with FAR 15.403, Requiring Certified Cost or Pricing Data.
16. Flowdown of requirements: All clauses and Contract Data Requirements List (CDRL) requirements of solicitation W52P1J-21-R-0052 and the resultant contract must be flowed down to and met by all major/key subcontractors or whose subcontract is for any portion of the proposed price of the associated CLINs.
17. Proposals shall be submitted electronically to josephine.l.hennings.civ@mail.mil and bridget.l.kramer.civ@mail.mil. Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), http://safe.apps.mil/
. Non-CAC users will have to request a drop-off request from the Contract Specialist or Contracting Officer. Please visit the website for more details and instructions for its use. Cloud Services and third party drop boxes are not acceptable for proposal submission. It is highly recommended that the Offeror request a Return Receipt or other form of acknowledgement to verify that the proposal submission was received prior to the closing of the RFP.
18. All proposals submitted in response to this RFP shall be valid for 180 calendar days. Offeror shall annotate the 180 day validity period in Block 12 of this RFP.
19. In the event that a discrepancy between any statements in Narrative A and another section of the RFP exists, the other sections take precedence.
20. Unless otherwise specified, the standard versions to be referenced are the latest version as of the date of this solicitation.
21. Army Contracting Command - Rock Island is the only ordering activity that can place orders on the resultant contract.
22. All questions regarding this RFP shall be submitted IAW paragraph 23 no later than 12:00PM CT on 25 October 2021.
23. This RFP shall NOT be discussed with any U.S. Government employee except the Contracting Officer, Ms. Bridget Kramer, and Contract
3 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Specialist, Ms. Josie Hennings. Comments and questions shall be directed in writing by email to bridget.l.kramer.civ@mail.mil and josephine.l.hennings.civ@mail.mil. Please indicate the RFP number, W52P1J-21-R-0052, in the subject line of the email for all correspondence pertaining to this RFP.
*** END OF NARRATIVE A0001 ***
4 89
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CXU-3 A/B SIGNAL CARTRIDGE (USAF)- FIRST ARTICLE ________________________________________________
TEST REPORT ___________
A First Article Test Report shall be submitted for the CXU-3 A/B Signal Cartridge within 270 days after issuance of Delivery Order. Refer to Section E, E0006, 'First Article Test (Contracting Testing)' and clause 52.209-3 - 'First Article Test Approval, Contractor Testing' for further information.
INSPECTION: Origin
ACCEPTANCE: Destination
The U.S. Government has 30 days to approve/disapprove the First Article Test Report after U.S. Government receipt of the report.
First Article Test prices shall be entered on the
Price Matrix at Attachment 0001 of Section J.
(End of narrative F001)
0002 CXU-3 A/B SIGNAL CARTRIDGE (USAF) - PRODUCTION ______________________________________________
QUANTITY $ $ ________ ______________ __________________
COMMODITY NAME: CXU-3 A/B SIGNAL CARTRIDGE
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
FOB Destination Locations:
McAlester, OK
Chambersburg, PA
Toole, UT
Crane, IN
FMS orders will be FOB Origin.
All proposed unit pricings shall be entered on the
Price Matrix at Attachment 0001 in Section J.
If the Delivery Order is issued with FAT, then deliveries shall commence within 365 days after issuance of the Delivery Order. If the Delivery Order
5 89
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
is issued without FAT, then monthly deliveries will continue at the same rate and immediately after the delivery schedule in place for the items previously on contract. The delivery schedule will be set forth in Section B of each Delivery Order.
(End of narrative F001)
0003 CXU-3 A/B SIGNAL CARTRIDGE (USN) - FIRST ARTICLE ________________________________________________
TEST REPORT ___________
A First Article Test Report shall be submitted for the CXU-3 A/B Signal Cartridge within 270 days after issuance of Delivery Order. Refer to Section E, E0006, 'First Article Test (Contracting Testing)' and clause 52.209-3 - 'First Article Test Approval, Contractor Testing' for further information.
INSPECTION: Origin
ACCEPTANCE: Destination
The U.S. Government has 30 days to approve/disapprove the First Article Test Report after U.S. Government receipt of the report.
First Article Test prices shall be entered on the
Price Matrix at Attachment 0001 of Section J.
(End of narrative F001)
0004 CXU-3 A/B SIGNAL CARTRIDGE (USN) - PRODUCTION _____________________________________________
QUANTITY $ $ ________ ______________ __________________
COMMODITY NAME: CXU-3 A/B SIGNAL CARTRIDGE
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
Deliveries or Performance _________________________
FOB POINT:
FOB Destination Locations:
McAlester, OK
Chambersburg, PA
Toole, UT
Crane, IN
FMS orders will be FOB Origin.
6 89
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
All proposed unit pricings shall be entered on the
Price Matrix at Attachment 0001 in Section J.
If the Delivery Order is issued with FAT, then deliveries shall commence within 365 days after issuance of the Delivery Order. If the Delivery Order is issued without FAT, then monthly deliveries will continue at the same rate and immediately after the delivery schedule in place for the items previously on contract. The delivery schedule will be set forth in Section B of each Delivery Order.
(End of narrative F001)
0005 CONTRACT DATA REQUIREMENTS LIST (CDRL) DD1423 _____________________________________________
The contractor shall prepare and deliver data submissions in accordance with the requirements, quantities, and schedules set forth in the Contract
Data Requirements Lists (DD Form 1423), Exhibit A.
Data Item Descriptions (DIDs) can be obtained from the following website:
http://quicksearch.dla.mil
*Not Separately Priced
**A DD250 is not required for this CLIN.
(End of narrative F001)
7 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C0001 -DRAWINGS/SPECIFICATIONS______________________________
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) The following Drawings and Specifications in accordance with the Technical Data Package Listing (TDPL) identified as follows, with revisions in effect as stated, are applicable to this procurement, and revisions of documents thereon:
ITEM NSN ADL/TDPL REV DATE__________________________________________________________________
CXU-3 A/B 1325-01-112-8170 1371AS100 K 02/25/2021
Signal Cartridge
(USAF)
CXU-3 A/B 1325-01-088-4217 1371AS100 K 02/25/2021
Signal Cartridge
(USN)
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with "Technical Data
Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
*** END OF NARRATIVE C0001 ***
C0002 - STATEMENT OF WORK - TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA______________________________________________________________________________________________________________________________
(a) TDPs will be obtained electronically via the Contracting Opportunities posting for this requirement on the Sam.Gov website. You must have an account prior to accessing any TDP(s). To register for an account in Sam.Gov, please visit https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select create account. The toll free helpdesk phone number is (866)606-8220 and for International (334) 206-7828. Vendors are responsible for placing correct information in Sam.Gov.
(b) You may need to use special software to view the documents that are posted on Sam.Gov. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or Lucent viewers to view the TDP(s) and are available as freeware at: ImageR Viewer: http://g6msd.redstone.army.mil Lucent Viewer: http://www.ec-edi.com/
(c) The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDP(s):
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the solicitation posting. The TDP and all necessary TDP documents will be posted under the Attachments / Links tab. You must have a Sam.Gov account prior to accessing the TDP.
(2) To access the TDP(s), click directly on the document you want to view under the Attachments / Links tab. You will be prompted for your username and password prior to gaining access to the TDP.
CLIN: N/A
TDPL Date: N/A
(e) FOR RESTRICTED TDP(s):
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDPs and any other related documents are posed with various options, such as Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDP(s):
TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the requested information. To request access log in to Sam.Gov, go to the applicable solicitation under Contracting Opportunities within Sam.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. Completion of a Use and Non-Disclosure
Agreement form may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from "mailto:donotrely@sam.gov " saying A Notice Manager from ACC-RI has updated your access to
8 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.
(2) Access to EXPORT CONTROL TDP(s)
(i) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid Contractor login credentials. In addition, to obtain access to these TDP(s), vendors and Contractors must have a current DD 2345, Military Critical
Technical Data Agreement on file with the Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Military
Critical Technical Data Agreement on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/ , click on Documents and follow the instructions provided.
Processing time is estimated at five (5)working days after receipt.
(ii) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to Sam.Gov, go to the applicable solicitation under Contracting Opportunities within Sam.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP. You will receive a system generated email from "mailto:donotrely@sam.gov " saying A Notice
Manager from ACC RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.
(iii) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.
(iv) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)
or the Export Administration Act of 1979. as amended, Title 50, U.S.C., App. 2401 et. seq.
CLIN: Various
TDPL Date: Various
(3) Further dissemination of Restricted TDP(s) must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is REQUIRED to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning or melting any physical copies of the TDP and/or deletion of removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in Sam.Gov should be directed to https://fsd.gov/fsd-gov/home.do . The helpdesk phone number is
(866)606-8820. Vendors are responsible for placing correct information in Sam.Gov. A user guide for Sam.Gov can be found here:
https://dodprocurementtoolbox.com/site-pages/contract-opportunities
*** END OF NARRATIVE C0002 ***
C0003 - CONFIGURATION MANAGEMENT DOCUMENTATION______________________________________________
(a) The Contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the U.S.
Government provided TDP. The Contractor shall prepare and submit ECPs, Notices of Revisions (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the U.S. Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be an emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
9 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or postproduction and prior to acceptance by the U.S. Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the
TDP or other baseline documentation until notified by the U.S. Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the U.S. Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specification which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required)).
*** END OF NARRATIVE C0003 ***
C0004 - RESTRICTION OF CRITICAL ITEMS AND COMPONENTS____________________________________________________
(a) The items and components listed in paragraphs (b) and (c) are critical to the support of national defense items. As such, it is necessary to create and/or maintain a domestic capability for the production of these items and components by limiting production and procurement to the United States Industrial base.
(b) Items listed in this paragraph, to include all components, contained therein, down to but not including raw materials (unless a more stringent restriction applies as set forth elsewhere in this contract), must be manufactured, assembled, and tested in the United States or its outlying areas. Raw Materials is defined as material in the mill forms and shapes normally produced for commercial use.
N/A
(c) Components listed in this paragraph must be manufactured, assembled, and tested in the United States or its outlying areas.
CXU-3 A/B SIGNAL CARTRIDGE (USAF)- NSN: 1325-01-112-8170
CXU-3 A/B SIGNAL CARTRIDGE (USN) - NSN: 1325-01-088-4217
In all cases, final assembly and testing of the items listed in the Schedule in Section B of this contract, must be performed in the
United States or its outlying areas.
(d) The failure of the Contractor or Subcontractor(s) to comply with this statement of work shall be a material breach of the contract.
(e) The Contractor will insert the substance of this statement of work, including this paragraph 5, in every subcontract for items or components identified above to ensure flowdown to, but not including, raw materials.
*** END OF NARRATIVE C0004 ***
10 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D0001 - PACKAGING REQUIREMENTS_______________________________
PRON: R12A02ECHI
NOMEN: Signal Cartridge CXU-3 A/B
PN: 1371AS100
NSN: 1325-01-112-8170
DODIC: F470
PACKAGING REQUIREMENTS
(a) Packaging shall be in accordance with 1371AS200 revision L, dated 18 DEC 2020.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 1371AS200, revision L, dated 18 DEC 2020. 2-D barcodes are required in accordance with
12999545, rev J, dated 26 January 2018.
(d) The following shall apply to drawing 1371AS200, revision L, dated 18 DEC 2020:
(e) HEAT TREAT WOOD QUALITY MARKING
(1)In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All
WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see
URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(f) MARKING
(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(g) Palletization shall be in accordance with 6214536, revision D, dated 26 FEB 2021. Marking shall be in accordance with ACV00561, Revision G, dated 26 JAN 2018. 2-D barcodes are required.
PRON: U12A02EBHI
NOMEN: Signal Cartridge CXU-3 A/B
PN: 1371AS100
NSN: 1325-01-088-4217
DODIC: F470
PACKAGING REQUIREMENTS
(a) Packaging shall be in accordance with 1371AS200 revision L, dated 18 DEC 2020.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 1371AS200, revision L, dated 18 DEC 2020. 2-D barcodes are required in accordance with
12999545, rev J, dated 26 January 2018.
(d) The following shall apply to drawing 1371AS200, revision L, dated 18 DEC 2020:
(e) HEAT TREAT WOOD QUALITY MARKING
11 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1)In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All
WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see
URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(f) MARKING
(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(g) Palletization shall be in accordance with 6214253, revision E, dated 26 FEB 2021. Marking shall be in accordance with ACV00561, Revision G, dated 26 JAN 2018. 2-D barcodes are required.
*** END OF NARRATIVE D0001 ***
12 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E0001 - MIL-STD-1916____________________
The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
E0002 - STATISTICAL PROCESS CONTROL___________________________________
Part I General Statistical Process Control Requirements
(a) In addition to the quality requirements of the technical data package, the Contractor shall implement Statistical Process Control
(SPC) in accordance with a government accepted SPC Program Plan. Control chart techniques shall be in accordance with the American
National Standards Institute (ANSI) B1, B2 and B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.
(b) The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan. The plans shall be structured as delineated on the Data Item Description referenced in the DD Form 1423. The general and the detailed plans shall be submitted to the government for review per DD Form 1423 requirements. Notification by the Government of acceptance or nonacceptance of the plans shall be provided in accordance with the timeframes specified on the DD Form 1423. Once a general plan for a facility has been approved by this
Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted general SPC plan is not required if current SPC contract requirements and Data Item Description (DID) requirements are fulfilled. If this Command has previously accepted the general SPC plan under essentially the same SPC contractual requirements, so indicate by providing the Contracting Officer with the following information:
Date of Acceptance ______________
Contract Number(s) ______________
(c) The contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the Government, and corrective action shall be accomplished by the contractor.
(d) A milestone schedule will be submitted for those facilities who do not have, or have never had, a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for those SPC subjects addressed in the Statistical Process Control requirement located in Part
II of this section. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a first article is not required. Milestones shall be developed for each commodity identified for SPC application. Milestones shall be submitted through the Government Quality Assurance Representative to the Contracting Officer for review and acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted through the same channels for review. The Government reserves the right to disapprove any changes to the previously accepted milestones.
Notification by the Government of the acceptance or nonacceptance of the milestones shall be furnished to the Contractor by the
Contracting Officer.
(e) The Contractor shall review all process and operation parameters for possible application of SPC techniques. This review shall include processes and operations under the control of the prime contractor and those under the control of subcontractor or vendor facilities. A written justification shall be included in the detailed plan for each process and operation parameter that controls or influences characteristics identified as critical, special, or major which have been deemed impractical for the application of SPC techniques. A pamphlet on application of SPC for short production runs is available through the Contracting Officer.
(f) Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of 3 years. The control charts shall be provided to the Government for review at any time upon request.
(g) When the process or operation parameter under control has demonstrated both stability and capability, the Contractor may request, in writing, through Administrative Contracting Officer (ACO) and Contracting Officer (CO) channels to the Product Assurance and Test
Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated. Upon
13 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices and the control charts.
(h) The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of if any one of the following conditions exist:
(1) The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of 100% acceptance inspection or testing for an attribute-type critical parameter or characteristic.
(2) The Contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.
(3) The critical parameter or characteristic is a first order, single point safety failure mode (nonconformance of the critical parameter or characteristic in and of itself would cause a catastrophic failure).
(i) The Government will only consider reduction or elimination of the 100% acceptance inspection or test requirement for other critical parameters or characteristics if either of the following conditions are met:
(1) The process is in a state of statistical control utilizing variable control chart methods for the critical parameter or characteristic under control and the process performance index (Cpk) is at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance index is being maintained for each production delivery.
(2) The critical parameter or characteristic is conclusively shown to be completely controlled by one or more process or operation parameters earlier in the process, and those parameters are in a state of statistical control utilizing variable data, and the product of the probability of the conformance for each earlier parameter associated to the critical characteristic is better than or equal to a value equivalent to that provided by a Cpk of at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance indexes are being maintained for each production delivery.
(j) For characteristics other than critical, requests for reduction or elimination of acceptance inspection and testing shall be considered when the process performance index is greater than or equal to a Cpk of 1.33 for variables data. Requests shall be considered for attributes data when the percent beyond the specification limits is less than or equal to .003 (Cpk=1.33).
(k) Process or operation parameters under reduced or eliminated inspection or testing that undergo a break in production less than 6 months in length, may continue to operate under reduced or eliminated inspection or testing provided there has been no degradation below a Cpk of 1.33 (2.0 for criticals). Any break in production greater than 6 months shall require resubmission of the request for reduction or elimination of inspection or testing through the same channels cited in paragraph (g) above.
(1) Not used.
(m) Immediately following a change to a process or operation parameter under reduced or eliminated inspection, the process capability
(Cp) or process performance indexes (Cpk) shall be recalculated and documented for variable data; the grand average fraction defective shall be recalculated for attribute data. If any of these values have deteriorated, immediate notification shall be made to the
Government along with the associated documentation. Return to original inspection and test requirements may be imposed as stipulated in paragraph n below.
(n) The Government reserves the right to withdraw authorization to reduce or eliminate final acceptance inspection or testing and direct the Contractor to return to original contract inspection or test procedures at any indication of loss of process control or deterioration of quality.
Part II Detailed requirements pertaining to plan submittal
In accordance with DD Form 1423 and Part I of this section, the following supplemental information shall be considered and used when designing your general and detailed SPC plans.
1.0 General Management Plan
This section shall define managements SPC responsibilities and involvement and shall include managements commitment to continuous process improvement. The plan shall embrace a total commitment to quality and shall be capable of standing on its own merit.
1.1 Policy/Scope:
Describe the Contractors policy for applying SPC, including goals and management commitment to SPC.
1.2 Applicable Document:
List documents that are the basis for the contractors SPC program (i.e., ANSI standard, textbooks, Government documents).
1.3 SPC Management Structure:
Define the SPC management structure within the organization. Identify and include interrelationships of all departments involved in SPC
(i.e., Production, Quality, Engineering, Purchasing, etc.) Identify by job title or position all key personnel within departments
14 89
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
involved in the application of SPC. Describe which functions are performed by key personnel and when these functions are performed
(i.e., include personnel responsible for performing inspections/audits, charting and interpreting data; personnel responsible for determining, initiating and implementing corrective action upon detecting assignable causes, etc.)
1.4 SPC Training:
Identify by job title or position the primary individual responsible for overseeing that SPC training is accomplished. Describe the qualification program required and in use for all personnel utilizing SPC techniques, including the qualification of trainers. Identify who is to be trained and the type, extent and length of such training (i.e., on-the-job, classroom, etc.). Identify when refresher training is required and how personnel using SPC techniques are monitored.
1.5 Manufacturing Controls:
Identify the criteria for performing SPC gage capability studies and describe how and when these studies are applied. Repeatability and accuracy of gages should be addressed.
1.6 Determination of SPC Use:
Describe how the process/operation parameters are determined appropriate for SPC application and explain what actions are taken if SPC is not deemed appropriate for critical, special and major process/operation parameters (i.e., Pareto analysis; analysis of characteristics with tight tolerances, etc.)
1.7 Process Stability and Capability:
a. Identify the criteria for performing process capability studies and describe how and when these studies are applied. Describe how the process capability index is calculated and include the frequency of these calculations. Describe what actions are taken as a result of each process capability study. Describe the contractors methodologies when process capability is for variable and attribute data. To determine a capable process, the process/operation parameters shall meet the following requirements:
(1) Variable Data. Process capability (Cp) shall be determined. Process performance index shall be greater than or equal to 1.33(Cpk).
For critical parameters/characteristics, the process performance index shall be greater than or equal to 2.0 (Cpk).
(2) Attribute Data: Process capability/performance shall be the percent beyond the upper/lower specification limit less than or equal to .003 percent (Cpk=1.33).
b. Describe what…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .