DRAFT Attachment 0008 SOW Inert Models and Cutaways.pdf
PDF 138 KB Posted
- Attached to
- M782 Multi-Option Fuze for Artillery (MOFA)
- Solicitation number
- W52P1J-21-R-0005
About this file
This document contains a statement of work and a related federal contract opportunity notice. The statement of work outlines requirements for inert cutaway models and full inert models of the M782 Multi-Option Fuze for Artillery, to be used for briefing purposes. Key deliverables include inert cutaway models with selective cross-sectioning to expose internal features while protecting sensitive components, as well as full inert models using equivalent inert materials in place of explosives. The federal contract opportunity notice indicates the Army Contracting Command - Rock Island intends to issue solicitation number W52P1J-21-R-0005 for the M782 MOFA, restricting competition to U.S. and Canadian companies, with the potential to procure up to 500,000 fuzes over five one-year ordering periods under a single firm-fixed-price indefinite-delivery indefinite-quantity contract. The pre-solicitation anticipates posting the request for proposal in the third quarter of fiscal year 2021 with an estimated award date of the second quarter of fiscal year 2022.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 March 2021
STATEMENT OF WORK FOR
INERT M782 MOFA Models
1. OBJECTIVE
The objective of this Statement of Work (SOW) is to enable the U.S. Government to purchase INERT cutaway models and full-up INERT models in support of ongoing IDIQ contracts. Deliverables under the IDIQ contract will be for INERT Cutaway models and INERT models, part of CLINs 0002 and 0003
2. BACKGROUND
The U.S. Government requires INERT models of the fuze system to brief the fuze design to team members, program management, and the user community under the production IDIQ contract being awarded.
3. APPLICABLE DOCUMENTS
3.1 DRAWINGS
The M782 MOFA TDP is applicable for this SOW. The MOFA models shall be fabricated in accordance with the following drawings from the Technical Data Package (TDP):
12984952 M782 MOFA
DTL12984952 DTL SPEC: M782
8864492 BOX, AMMO, FOR ARTILLERY FUZES
4. REQUIREMENTS
4.1 Inert Cutaway Models
4.1.1 The contractor shall fabricate and deliver to the Government inert cutaway models.
4.1.2 The inert cutaway model shall consist of a full-up assembled fuze with a 90-degree cross section of material removed to expose internal features and subassemblies. The following internal subassemblies are not subject to cross sectioning: transceiver, inductive coil, safe and arm device. With Government approval, the following internal subassemblies are not subject to cross sectioning: potted control processor, battery, detonator delay. The battery assembly shall have its hazardous materials, such as electrolyte and lithium, replaced with compatible non-hazardous materials or omitted with Government approval. The cross section shall be oriented to minimize destruction of internal features. Unnecessary lubricants or adhesives shall be omitted. Components which are difficult to install or cross section, such as O-rings, shall be omitted upon Government approval. Explosives shall be replaced with inert, non-hazardous, compatible materials with an equivalent final form. Components or features which when present reveal sensitive data or permit reverse engineering, shall be altered or omitted to prevent disclosure of sensitive data; Government approval of the altered design is required. The model shall be engraved or have a non-removable permanent marking to identify the assembly as inert per Government policy. The model shall be delivered with a display stand fixture to securely hold and
DRAFT
display the model. The model shall not be permanently attached to the fixture. The final design shall be compliant with the security classification guide and approved by the Government prior to fabrication.
4.1.3 The contractor shall modify drawings as necessary for fabrication of the cutaway inert models. The contractor shall deliver the modified drawings to the Government for review and approval before work is started on the sectioned models.
4.2 Inert Models
4.2.1 The contractor shall fabricate and deliver to the Government inert models.
4.2.2 The inert model shall consist of the functional full-up assembled fuze with compatible, mass equivalent, inert material used in place of explosive materials. Additionally, the battery assembly shall have its hazardous materials, such as electrolyte and lithium, replaced with compatible, non-hazardous, mass equivalents. Lubricants and adhesives which prevent disassembly shall be omitted. Components or features which when present reveal sensitive data or permit reverse engineering, shall be altered or omitted to prevent disclosure of sensitive data; Government approval of the altered design is required.
The model shall be engraved or have a non-removable permanent marking to identify the assembly as inert per Government policy. The final design shall be compliant with the security classification guide and approved by the Government prior to fabrication. The models shall be delivered in standard fuze packaging in accordance with the drawing.
4.2.3 The contractor shall modify drawings as necessary for fabrication of the inert models. The contractor shall deliver the modified drawings to the Government for review and approval before work is started.
5. GFM
GFM will not be provided during the performance of this SOW
6. SHIPPING INSTRUCTIONS
When quantities of each model are requested, items shall be shipped to the address specified on the delivery order.
File details come from the government source that posted it. Updated .