Att 0004 - Cert Mat Test Rep MJU67B Cartridge Retainer.docx

DOCX document 15 KB Posted

Attached to
Plastic Parts for MJU-67B Countermeasure Flares - Sole Source
Solicitation number
W52P1J-21-Q-PTS6
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFIED MATERIAL TEST REPORT / CERTIFICATE OF ANALYSIS

For those material(s) identified below, a Certificate of Analysis (C of A) test report shall be provided to the government at time of delivery to CAAA (Crane Army Ammunition Activity). The test results contained on the Certificate of Analysis report(s) shall be adequate to determine compliance with all applicable requirements of the material specification(s) listed below. Availability of the Certificate of Analysis may be in addition to other Purchase requirements and does not reduce or prejudice the Government’s right to inspect supplies under other provisions of this contract.

The test report(s) shall contain the following:

a. Name and address of Manufacturer and Supplier when *applicable. (*If not manufactured by the Supplier.)

b. Purchase order number.

c. Identification of material by specification, revision, amendment and dates, together with type, grade, size etc. number.

d. Quantity of material.

e. Material testing results shall address drawing specifications.

Component: 67/B Cartridge Retainer Drawing: 3928AS111 Rev. D Material: IAW Dwg. 3928AS132 Rev C PPE + PS Blend – 20% Glass Reinforced

Note: Component (Cartridge Retainer) shall be identified with a traceable lot number at time of delivery.

Note: Component (Cartridge Retainer) shall be Identifiable / Traceable to Individual Cavities of Mold.

At time of delivery to CAAA, Item(s) cannot be accepted without documentation to support the above material was used to produce.

f. Quantity tested, sample size, and specimen type as applicable.

g. Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of test report content.

Component: Cartridge Retainer

Requirements for: MJU-67/B Program

File details come from the government source that posted it. Updated .