W52P1J21Q3024 0002.pdf

PDF 375 KB Posted

Attached to
Packaging Assembly
Solicitation number
W52P1J21Q3024
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Attached

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W52P1J21Q3024

X 9B. DATED (SEE ITEM 11)

07-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-May-2021

CODE

ARMY CONTRACTING COMMAND ROCK ISLAND

ACC-RI

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W52P1J 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W52P1J21Q3024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

Amendment 0002 to Request for Quote (RFQ) W52P1J21Q3024 is issued for the following:

1. To answer the following contractor question:

Q1: The descriptions listed in CLIN 0001 and 0002 do not appear to match the Part Numbers referenced. For PN 13-19-1021 the drawing calls out "Bottom Assembly" while the SOL lists "Top Assembly" for PN 13- 19-1021. For PN 13-19-1022, the drawing calls out " Top Assembly" while the SOL has "Bottom Assembyu" for PN 13-19-2022. Do you want us to quote according to PN or description?

A1: The intention is for CLIN 0001 to be for the Packaging Assembly, Top and CLIN 0002 to be for Packaging Assembly, Bottom. The CLINs will be corrected to reflect as such.

2. Amendment to correct the CLIN Descriptions for all CLINs to reflect the correct Drawings, Part Numbers, and update Attachment 0004 REV A date.

3. All other terms and conditions remain unchanged.

4. The POC for this action is Nick Brown, at nicholas.j.brown91.civ@mail.mil.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Packaging Assembly, Top, in accordance with Attachment 0004 - Drawing 13-19-1021 Revision A, dated 16 November 2010. Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A. End Item: M106

To:

Packaging Assembly, Top, in accordance with Attachment 0005 - Drawing 13-19-1022 Revision A, dated 21 May 2013. Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A. End Item: M106 The PROD/CAT number has changed from 13-19-1021:81361 to 13-19-1022:81361.

CLIN 0002

Packaging Assembly, Top, in accordance with Attachment 0005 - Drawing 13-19-1022 Revision A, dated 21 May 2013. Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A.End Item: M106

Packaging Assembly, Bottom, in accordance with Attachment 0004 - Drawing 13-19-1021 Revision A, dated 21 May 2013. Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A.End Item: M106

The PROD/CAT number has changed from 13-19-1022:81361 to 13-19-1021:81361.

CLIN 0003

Packaging Assembly, Top, Preproduction sample in accordance with Attachment 0004 - Drawing 13-19-1021 Revision A, dated 16 November 2010.Pre-production samples should consist of ten (10) top assemblies, with five each of the full assemblies and five each of the components required to create that assembly.Pre-production Report, Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A.End Item: M106

Packaging Assembly, Top, Preproduction Samples in accordance with Attachment 0005 - Drawing 13-19-1022 Revision A, dated 21 May 2013.Pre-production samples should consist of ten (10) top assemblies, with five each of the full assemblies and five each of the components required to create that assembly.Pre-production Report, Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, see Exhibit A.End Item: M106

CLIN 0004

Packaging Assembly, Top, Preproduction sample in accordance with Attachment 0005 - Drawing 13-19-1022 Revision A, dated 21 May 2013.Pre-production samples should consist of ten (10) bottom assemblies, with five each of the full assemblies and five each of the components required to create that assembly.Pre-Production Report, Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, Packaging Assembly, Bottom, Preproduction sample in accordance with Attachment 0004 - Drawing 13-19-1021 Revision A, dated 21 May 2013Pre-production samples should consist of ten (10) bottom assemblies, with five each of the full assemblies and five each of the components required to create that assembly.Pre-Production Report, Material Certification Report, Certificate of Conformance, and Test Reports shall be provided with each shipment, (End of Summary of Changes)

File details come from the government source that posted it. Updated .