This solicitation requests proposals for a roof repair project on Building 212 at Rock Island Arsenal. The United States Army Contracting Command - Rock Island is seeking to repair an existing low-scope EPDM roofing system. The base bid and all options must be priced in proposals from small businesses. Work shall be completed according to the attached scope of work, specifications and plans. A pre-bid site visit is scheduled for February 11 and questions are due February 20. The total project value is estimated between $1-5 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2018-2936

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W52P1J20R5002

X 9B. DATED (SEE ITEM 11)

28-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Feb-2020

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W52P1J 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W52P1J20R5002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0001 NARRATIVE

The purpose of this amendment is the following:

1. To answer the following contractor questions:

Q1. Attachment 0002 – Appendix A – Specifications, specification 072200, 1.3 – 1.5.1: The only reference to what product is required is ASTM E84. Should the coverboard be a gypsum based product (densdeck prime or securerock) or any manufacturer approved coverboard required to meet the warranty?

A1. Any manufacturer coverboard that meets the warranty is approved if it meets the flame spread index of 75 or less as tested in accordance with ASTM E84.

Q2. Attachment 0002 – Appendix A – Specifications, specification 072200, 2.1.1: The ASTM C1289 is consistent with both polyisocyanurate facers supplied by the manufacturer. Which polyisocyanurate board is required – standard facer Type II, Class 1 or enhanced facer Type II, Class 2?

A2: The Contractor shall provide the manufacturer’s approved polyisocyanurate board to meet the contract warranty requirements.

Q3: What R-value/thickness is required?

A3: This project does not require increasing the overall R-value/thickness of insulation over the entire roof.

Insulation was specified because there will be areas requiring insulation infill to match the existing roofing system height, once items indicated on plans are removed. There is also an allotment for wet, damaged, or unserviceable areas of existing insulation. The areas requiring infill or repair, will be part of the new roof system and covered by the warranty.

Q4: Attachment 0002 – Appendix A – Specifications, specification 075323, 1.8 is calling for a minimum 30 year warranty but 075323, 1.8.1 is calling for 25 year warranty with 90mph peak gust coverage and 1.5” hail coverage.

Which takes precedence? A 30 year warranty will require a full tear off to deck and it appears you want to re-use the existing insulation.

A4: The language on page 77 in Attachment 0002 – Appendix A – Specifications, Section 07 53 23 part 1.8 requiring the 30 year warranty has be struck through. The Contractor shall provide the 25 year warranty as detailed therein.

Q5: Based on sheet A-909 photo 52 Attachment 0003 – Appendix B - Plans dated 21 February 2020 there is 1.25” of existing polyisocyanurate or R7 plus ½” woodfiber or R1.3 for a total existing R-value of R8.3. What is the desired finished R-value of the new construction?

A5: This project does not require increasing the overall R-value/thickness of insulation over the entire roof.

Insulation was specified because there will be areas requiring insulation infill to match the existing roofing system height, once items indicated on plans are removed. These infill areas and the new roofing covering them must be part of the roof system and the warranty.

Q6: Attachment 0003 – Appendix B - Plans dated 21 February 2020 Sheet G-005, General demolition and new work note #13 indicates the existing coping cap is to be removed, re-installed, primed and painted. Is there a reason you don’t want new coping? Often removed / reinstalled sheet metal can be dented or damaged during the removal/storage/re-install process. Plus, painted copings are a maintenance item. Is there a specific color that you want it painted that can’t be achieved in a kynar finished product? Please advise if removing and replacing is an option?

A6: There is no requirement per the solicitiation and attachmented documents. Please see the revised note in Attachment 0003 – Appendix B - Plans dated 21 February 2020.

Q7: Will a sky-track and manlift be allowed on site to stage material on and off the roof as well as work on perimeter edges?

A7: See Sheet Notes 4 & 5 on G-003 in Attachment 0003 – Appendix B - Plans dated 21 February 2020. The Contractor may use lifting equipment, but this needs to be coordinated the same as crane usage because there are numerous overhead and egress door.

Q8: Is there any lightning protection on the roof?

A8: There is no lightning protection on the roof.

Q9: Specification and drawings call out to remove and re-install coping cap. If damaged, will contractor have to replace to match? Should contractor include in their proposal an approximate linear footage of coping cap replacement?

A9: See General Demolition and New work note 13 on G-005 in Attachment 0003 – Appendix B - Plans dated 21 February 2020. The following allotment for replacing coping has been added:

Base bid: the contractor shall allot 25 linear feet of coping replacement for damaged or unserviceable materials.

Replacement materials shall match existing.

For each awarded bid option: the contractor shall allot an additional 25 linear feet of coping replacement for damaged or unserviceable materials. Replacement materials shall match existing.

Q10: Will contractor and employees be granted interior access, such as roof hatch, to get on roof? Or will contractor need a stair tower on the exterior?

A10: Yes, the Contractor and employees will be granted interior access to gain roof access and perform any other work necessary to comply with contract requirements.

Q11: What is the desired R-Value of Insulation for this project?

A11: Previously answered question. See the answer to Question 3.

Q12: Page 77 of Attachment 0002 – Appendix A – Specifications, reference specification 1.8 and 1.8.1. Can you clarify is this will be a 25 year or 30 NDL warranty?

A12: Previously answered question. See the answer to Question 4.

Q13: Does this roof have a Type B metal deck all throughout?

A13: Yes.

Q14: Will contractor have to acquire any special permits?

A14: If the contractor does any Hot Work such as cutting that produces sparks or has an open flame of any kind, then a permit will be required by the Installation Fire Department. The permit is free and can be easily obtained on the day the Hot Work will be performed by coordinating with the COR. The government does not know of any other "special" permits that will be required by this contract.

Q15: Just to clarify, the roof drains will only receive an inspection for proper functionality?

A15: Please read and review the requirements for roof drains in Attachment 0003 – Appendix B - Plans dated 21 February 2020 on sheet G-005 Demolition and Repair of Roof Drains. The contractor shall inspect all roof drains on the base bid and any awarded bid option. The contractor shall bring the worst roof drains to the attention of the COR. The Contractor shall replace 2 roof drains on the base bid as selected by the COR. The Contractor shall replace 2 roof drains as selected by the COR for each bid option awarded.

Q16: Just to clarify, a trash chute will be allowed on the side of building, if needed?

A16: Yes, sheet note 2 on G-003 in Attachment 0003 – Appendix B - Plans dated 21 February 2020 indicates a chute can be utilized. Chute location shall be coordinated through the COR.

Q17: Will all pipe supports be required to have a support pad under them?

A17: Yes, please see General Demolition and New Work Note 11 on G-005 in Attachment 0003 – Appendix B - Plans dated 21 February 2020.

Q18: Key note 10 in Plans state to install a new OSHA compliant ladder at indicated locations. Are there any guidelines or requirements to meet, such as dimensions or colors, besides meeting the OSHA compliance?

A18: Ladders need to be permanently affixed to the existing structure and constructed of hot dipped galvanized steel. Painting the ladder a color is not required. OSHA has specific required minimums for the load capacity, dimensions, and features of fixed ladders that can be found here: https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1053

Q19: Will this project require a coverboard? One manufacturer states a coverboard is needed in order to meet the 25 year NDL and 90MPH wind rider warranty requirements.

A19: The project doesn’t specifically call for a coverboard. However, some EPDM manufacturers may require a coverboard with a specific fastener placement to meet the contract warranty requirements.

Q20: Page 36 in the Solicitation states various types of required insurance. Can you clarify if ALL types will be required or necessary from contractor? Aircraft Public and Passenger and Vessel Collision Liability will likely not apply on this project.

A20: Per the information in the section titled, “REQUIRED INSURANCE” at a minimum the contractor must provide insurance for Worker’s Compensation, Employer’s Liability, General Liability, and Automobile Liability.

The amounts required must be in accordance with (IAW) the amounts listed in this section and must comply with the schedule.

Please see cluases 52.228-1, 52.228-5 and 52.228-7 as well as page 36 of the solicitation.

Q21. Will Crickets and Saddles be necessary on this project? There is no mention of this in the plans or specifications.

A21: Crickets not specifically required by the contract, but could be required as part of the manufacturer’s warranty of the roof system. The contractor should check with the roofing manufacturer as to what is specifically required to meet the contract warranty requirements.

There are many existing saddles that slope to drain. The contractor doesn’t need to install new saddles.

Q22. Will an extension on this project be considered? The turn-around time from original site visit date, amount of RFI’s, manufacturer concerns, and different trades working within the project will play a major role in order for contractor to submit a more accurate bid.

A22: The solicitation is not extended.

Q23: Can the proposal be emailed?

A23: Yes, the proposal can be emailed. The solicitation mentions bonds are required. Since bonds are required, the bonds must be sealed and delivered either by mail or in-person prior to solicitation closing. Please note, the bonds need to be received by the Government (contracting) prior to solicitation close.

Q24: Are you in need of mobile office or storage container pricing as part of your bid?

A24: The Government does not specifically request in the contract a requirement for a mobile office or storage container. The requirement to include a mobile office or storage container as part of the overall bid package is solely the decision of the contractor.

Q25: What is the R-Value specified on the new EPDM Roof?

A25: Previously answered question. See answer to Question #3.

Q26: What color of EPDM is specified?

A26: The color of the new EPDM roofing material shall be black.

Q27: Is there a preferred Mechanical Company that normally performs maintenance on site?

A27: The Government does not have a preferred company for on-site maintenance.

Q28. Can another site visit or an individual review of the site be offered?

A28: The Government does not offer multiple site visits or schedule individual visits to the site. The official site is the only opportunity provided by the Government to view/visit the site.

Q29: Will all personnel working on this project be required to be US Citizens? Or will legal foreign nationals be allowed to work here?

A29: General information and instructions on visitor access to the Rock Island Arsenal can be found at https://home.army.mil/ria/index.php/my-fort/all-services/gate-information. Specific requests will need to be directed to the visitors center and potentially the security office.

2. To incorporate a revised attachment: Attachment 0003 – Appendix B – Plans dated 21 February 2020

3. The closing date (March 03, 2020) and time (09:00 Central Standard Time) remain unchanged.

4. All other terms and conditions remain unchanged.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Solicitation – W52P1J20R5002 Attachment 0001 - Scope of Work dated 18 December 2019 Attachment 0002 – Appendix A – Specifications Attachment 0003 – Appendix B – Plans dated 21 February 2020 Attachment 0004 - Davis Bacon Wage Determinations dated 05 December 2019 Attachment 0005 – Access Control Record Check Request Form

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .