B08_-_Amendment_0004_released_5-30-19.pdf
PDF 149 KB Posted
- Attached to
- Foam Parts
- Solicitation number
- W52P1J-19-T-3037
About this file
Amendment 0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J19T3037
X 9B. DATED (SEE ITEM 11)
14-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2019
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J19T3037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0004
1. The purpose of this Amendment is to extend the closing date from 30-May-2019 at 01:00 PM central time to 03-June-2019 at 01:00 PM central time.
2. MIS-DTL-61068 A document has been added to the TDP drawings link under W52P1J-19-T-3037 for approved JCP certified vendors to view. You may also click the following link to access request the MIS- DTL: https://www.fbo.gov/notices/234fb03f0b72c4299bd291063726dc66
3. CLIN’s 0001-0003 have been revised to the following:
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 42,464 Each Foam Collar tube
FFP
Manufacture of the Foam Collar tube for the Advanced Precision Kill Weapon System (APKWS) Guided Rocket, a member of the Hydra family of tactical rockets in accordance Manufacture of the Foam Collar tube for the Advanced Precision Kill Weapon System (APKWS) Guided Rocket, a member of the Hydra family of tactical rockets in accordance with (IAW) drawing 13722932 REV A dated 07-17-2019.
First Article Testing (FAT) will be IAW FAR Clause 52.209-3 which is part of the solicitation.
Certificate of Conformance and Certificate of Analysis is required WITH each shipment.
Inspection data report IAW with MIS-DTL-61068 A must be submitted with FAT if applicable and with each production delivery.
Period of Performance from date of award through 24 months.
Minimum Guaranteed Quantity: 1 Each Estimated Maximum Quantity: 42,464 Each
Minimum Order Limit: 1 Each
Contractor shall quote base and option year with and without FAT as follows:
Ordering Period 1 With FAT - 2019 Pricing: $___________ Each
Ordering Period 1 Without FAT - 2019 Pricing: $___________ Each
Ordering Period 2 With FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
Ordering Period 2 Without FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
FOB: Destination
PSC CD: 8140
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 6,088 Each Collar Tube Counter Bore
FFP
Manufacture of the Collar Tube Counter Bore for the Advanced Precision Kill Weapon System (APKWS) Guided Rocket, in accordance with (IAW) drawing 13723427 REV A dated 14 May 2018.
First Article Testing (FAT) will be IAW FAR Clause 52.209-3 which is part of the solicitation.
Certificate of Conformance and Certificate of Analysis is required WITH each shipment.
Inspection data report IAW with MIS-DTL-61068 A must be submitted with FAT if applicable and with each production delivery.
Period of Performance from date of award through 24 months.
Minimum Guaranteed Quantity: 1 Each Estimated Maximum Quantity: 6,088 Each
Minimum Order Limit: 1 Each
Contractor shall quote base and option year with and without FAT as follows:
Ordering Period 1 With FAT - 2019 Pricing: $___________ Each
Ordering Period 1 Without FAT - 2019 Pricing: $___________ Each
Ordering Period 2 With FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
Ordering Period 2 Without FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
UNIT UNIT PRICE MAX AMOUNT
0003 3,050 Each Aft Cushion Assembly
FFP
Manufacture of the Aft Cushion Assembly for the Advanced Precision Kill Weapon System (APKWS) Guided Rocket, in accordance with (IAW) drawings 13722935 REV A dated 17 Jul 2019, 13722936 dated 17 July 2019, and 13722934 dated 17 July 2019.
First Article Testing (FAT) will be IAW FAR Clause 52.209-3 which is part of the solicitation.
Certificate of Conformance and Certificate of Analysis is required WITH each shipment.
Inspection data report IAW with MIS-DTL-61068 A must be submitted with FAT if applicable and with each production delivery.
Period of Performance from date of award through 24 months.
Minimum Guaranteed Quantity: 1 Each Estimated Maximum Quantity: 3,050 Each
Minimum Order Limit: 1 Each
Contractor shall quote base and option year with and without FAT as follows:
Ordering Period 1 With FAT - 2019 Pricing: $___________ Each
Ordering Period 1 Without FAT - 2019 Pricing: $___________ Each
Ordering Period 2 With FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
Ordering Period 2 Without FAT - 2020 (THRU END CONTACT) Pricing:
$___________ Each
4. Certificate of Analysis information has been added to the RFQ as follows:
The offeror shall submit a Certificate of Analysis (COA) with quote submission that will provide the foam analysis that the Material (s);
a. DWG 13722935, aft cushion
b. DWG 13722932, collar tube
c. DWG 13723427, collar tube with counter bore.
Meets the following specifications: all shall be polyethylene foam, in accordance with A-A-59136, class1, Grade A, Type V, black.
* Aft Cushion, DWG 13722935, becomes the aft cushion assembly, DWG 13722934, when stiffener cushion, Part 13722936, four each, are placed in the four slots. The stiffener cushion must be: basic hardboard vegetable fiber, IAW ANSI/AHA A135.4, Class 1, surface: smooth one side (SIS).
The COA must contain the following information:
(1) Manufacturer Name (Materials are qualified by manufacturer not distributor)
(2) Product Name or Description
(3) National Stock Number (If available)
(4) Specification Requirements
(5) Lot/Batch Number
(6) Manufacture Date
(7) Expiration/Re-Inspection Date
(8) Signature of Certifying Official
(9) Test Results
The Certificate of Analysis shall be submitted with the proposal and each shipment.
ALL DELIVERIES SHALL INCLUDE A PACKING LIST; CERTIFICATE OF CONFORMANCE;
CERTIFICATE ANALYSIS AND REPORTING/MEASURING DATA IAW MIS-DTL-61068, paragraph 4.4 Quality Conformance Inspection.
5. All other solicitation terms and conditions remain the same.
6. Offerors must return a signed and dated copy of this amendment.
7. The point of contact for this action is Ms. Michelle Pleasant (309) 782-3016, email:
michelle.m.pleasant.civ@mail.mil.
File details come from the government source that posted it.