ATTACHMENT_0018_-_W52P1J-18-R-MISC_Amendment_0006_07AUG2018.pdf

PDF 124 KB Posted

Attached to
Miscellaneous Hardware Kits Used in Assembly of M8E1 Chemical and Biological Protective Shelters
Solicitation number
W52P1J-18-R-MISC
Issued by

About this file

Interested vendors are required to sign and submit solicitation Amendment 0006 with their proposal package.

View the file

Other files

File Type Posted
ATTACHMENT_0020_-_Question_1_and_Answer_1_Received_Regarding_Misc_Hardware_Kit.pdf PDF
ATTACHMENT_0019_-_Price_Matrix_-_CBPS_Misc_Kit_-_Revised_07AUG2018.xls XLS spreadsheet
ATTACHMENT_0021_-_Combined_Synopsis_and_Solicitation_-_Miscellaneous_Kit_-_Revised_07AUG2018.docx.pdf PDF
ATTACHMENT_0017_-_Combined_Synopsis_and_Solicitation_-_Miscellaneous_Kit_-_Revised_31JUL2018.pdf PDF
ATTACHMENT_0016_-_W52P1J-18-R-MISC_Amendment_0005.pdf PDF
ATTACHMENT_0015_-_Combined_Synopsis_and_Solicitation_-_Miscellaneous_Kit_-_Revised_25JUL2018.pdf PDF
ATTACHMENT_0014_-_W52P1J-18-R-MISC_Amendment_0004.pdf PDF
W52P1J-18-R-MISC_Amendment_0003.pdf PDF
ATTACHMENT_0012_-_Combined_Synopsis_and_Solicitation_-_Miscellaneous_Kit_-_Revised_29JUN2018.pdf PDF
ATTACHMENT_0013_-_Price_Matrix_-_CBPS_Miscellaneous_Kit_-_Revised_29JUN2018.xls XLS spreadsheet
ATTACHMENT_0008_--_CDRL_A002__-_Test_and_Inspection_Reports.PDF PDF
ATTACHMENT_0007_--_CDRL_A001_-_Shipping_Schedule.pdf PDF
ATTACHMENT_0010_--_CDRL_A004__-_Quality_Program_Plan.PDF PDF
ATTACHMENT_0009_--_CDRL_A003_-_Certified_Material_Reports.pdf PDF
ATTACHMENT_0011_--_CDRL_A005_-_Test_Procedure-_CARC_Paint.PDF PDF
W52P1J-18-R-MISC_Amendment_0002.pdf PDF
ATTACHMENT_0006_-_W52P1J-18-R-MISC_Amendment_0001.pdf PDF
Combined_Synopsis_and_Solicitation_-_MISC_KIT_-_Posted_to_FBO_5-3-2018.docx.pdf PDF
ATTACHMENT_0001_-_Scope_of_Work-_M8E1_Miscellanies_Kit_-_20180501.pdf PDF
ATTACHMENT_0002_-_Price_Matrix_-_CBPS_Miscellaneous_Kit.xls XLS spreadsheet
ATTACHMENT_0005_-_Notice_to_Accompany_TDPs.pdf PDF
ATTACHMENT_0004_-_Non-Disclosure_Agreement_-_MISC_KIT.docx.pdf PDF
ATTACHMENT_0003_-_FAR_Provision_52.212-3_-_MISC_KIT.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W52P1J-18-R-MISC AMENDMENT 0006

Issued AUGUST 7, 2018

1. Solicitation W52P1J-18-R-MISC is hereby amended to clarify that requirements regarding the First Article Test and to incorporate pricing-related revisions.

2. Although a First Article Test sample is still required, CLIN 0002, and all references to CLIN 0002, have been removed from solicitation W52P2J-18-R- MISC (to include the Price Matrix). The required First Article Test sample quantity will be subtracted from the total delivery order production quantity.

3. First Article Test item(s) should be delivered 30 days after date of contract award. Once the Government approves the First Article Test item(s), the awardee will then have 30 days to begin delivering the remaining order quantity.

The Government may request that the awardee delivery three to five kits per month. Delivery schedule may be negotiated. Initial delivery for the first delivery order is needed no later than March 2019.

4. Paragraph 3(c)(iv) in FAR clause 52.212-1, Instructions to Offerors – Commercial has been changed to now read “The Government reserves the right to request data other than certified cost and pricing data. If this data is requested, it shall be submitted in accordance with the instructions found at FAR 15.408, table 15-2, and shall be submitted electronically in a formula/algorithm-driven, fully calculating Microsoft EXCEL file with working formulas. This data shall be necessary to determine the reasonableness of offerors proposals as it corresponds to the Price Matrix.”

The section used to read as follows: “The Government reserves the right to request the submission of any additional data (i.e. cost or pricing data) necessary to validate the reasonableness of an offer.”

5. Steps 1, 2, and 3 in FAR clause 52.212-2, Evaluation – Commercial Items, have been revised and now read as follows:

“STEP 1: All proposals will be evaluated against the Technical subfactors. Should a proposal be determined “Technically Unacceptable” under any of the subfactors, the proposal will not be considered further for award.

STEP 2: Each proposal that is determined “Acceptable” in each of the four Technical subfactors will be evaluated to determine the total evaluated price, to include price reasonableness and completeness as follows:

Price Reasonableness: The Government will evaluate the price reasonableness of the offeror’s proposed price. A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.

Completeness: Since exchanges are not intended or desired, the Government requires complete proposals with respect to price. A complete proposal will include all information required by the Price Matrix, and must include pricing for the base period and each ordering period and must be consistent with the instructions contained in this solicitation.

The Government will identify the proposal with the lowest Total Evaluated Price.

STEP 3: The proposal with all four Technical subfactors determined to be “Technically Acceptable”, and with the lowest total evaluated price, will be evaluated against the Past Performance Factor. If a proposal is determined to be “Unacceptable” under the Past Performance Factor, the proposal will not be further considered for award. The proposal that is determined “Acceptable” in all Technical subfactors, has the lowest total evaluated price, and is also determined “Acceptable” in the Past Performance Factor will be selected for award.

The Procuring Contracting Officer reserves the right to contact Offerors for clarification, without opening discussions. The Government intends to award a contract without opening discussions (except for clarifications as described in FAR 15.306(a) and FAR 52.215-1). However, the Government reserves the right to conduct discussions and permit offerors to revise their proposals.

The Government reserves the right to make no award as a result of this solicitation if, upon evaluation, none of the proposals are deemed technically acceptable, and there is no reasonable expectation that opening discussions would result in technically acceptable proposals, or if the prices cannot be determined fair and reasonable.”

6. The following sentence has been removed from paragraph 2a of the “PRICE

EVALUATION FACTOR” section of FAR clause 52.212-2 - Evaluation – Commercial Items: “The Weighted Evaluation Price is then added to CLIN 0002, i.e. the proposed First Article Test price, to create the Proposed Ordering Period Price.”

7. Paragraph 2b of the “PRICE EVALUATION FACTOR” section of FAR clause

52.212-2 - Evaluation – Commercial Items has been revised to read as follows:

“The Government anticipates utilizing Price Analysis techniques to determine price reasonableness. The FAR requires that contracts be awarded at prices that are determined fair and reasonable. The Government will evaluate price reasonableness in accordance with FAR 15.404-1(b), relying primarily on competition; the Government may use any one, or a combination of techniques listed at FAR 15.404-1(b)(2) to determine the price fair and reasonable for Firm- Fixed-Price CLINs. Additional analysis techniques may be used as determined necessary by the Procuring Contracting Officer. These methods of evaluation may include the use of information/input from sources such as (but not limited to) other Government agencies and personnel. The Government reserves the right to required submission of any data other than certified cost or pricing data necessary to determine the reasonableness of an offer.”

Paragraph 2b used to read as follows:

“Price Analysis shall be used to determine price reasonableness. The FAR requires that contracts be awarded at prices that are determined fair and reasonable. The Government will evaluate price reasonableness in accordance with FAR 15.404-1(b), relying primarily on competition; the Government may use any one, or a combination of techniques listed at FAR 15.404-1(b)(2) to determine the price fair and reasonable for Firm-Fixed-Price CLINs. Additional analysis techniques may be used as determined necessary by the Procuring Contracting Officer. These methods of evaluation may include the use of information/input from sources such as (but not limited to) other Government agencies and personnel. The Government reserves the right to require the submission of any cost or pricing data necessary to validate the reasonableness of an offer.”

8. The solicitation is also hereby amended to instruct interested offerors to submit their delivery schedule in narrative form and to include the following:

1) the number of days after date of contract award until first article test quantity will be delivered to Pine Bluff Arsenal; and

2) the number of days after first article test approval until the remaining production quantity will be delivered to Pine Bluff Arsenal.

9. The following question was received regarding the miscellaneous hardware solicitation, and the Government’s respective response is provided below.

Question Answer

Q1. “Can you please provide the drawing of part

AA55859-16-4-1-A-1 (HOSE,

PVC, 20.0 INCH LENGTH).

This is a component to assembly 17-3-2150-2 (Item 7 on the BOM).

A1. There is no drawing associated with the part since it is a mil-spec/bulk item. That part number defines the material, cut length is in the description (20.0 inches). To clarify (since there is no tolerance in the title block for ‘1 PLACE’ dimensions, just 2 & 3 place decimals), the tolerance on the tube length could be +/-0.2.

10. As a result of the changes above, the following two documents, which reflect the above changes, are hereby incorporated into the solicitation as Attachments 0018, 0019, 0020, and 0021 respectively.

ATTACHMENT 0018: W52P1J-18-R-MISC Amendment 0006 07AUG2018 ATTACHMENT 0019: Price Matrix – CBPS Misc Kit – Revised 07AUG2018 ATTACHMENT 0020: Combined Synopsis and Solicitation – Miscellaneous Kit – Revised 07AUG2018 ATTACHMENT 0021: Question 1 and Answer 1 Received Regarding Misc Hardware Kit Solicitation

The attachments have been uploaded to the https://www.fbo.gov website.

11. Offerors are allowed to revise their proposals to reflect the above changes.

Revised proposals should be submitted no later than 3:00 p.m. central time, Tuesday, August 14, 2018.

12. All other terms and conditions of the solicitation remain unchanged.

13. Vendor’s acknowledgement of Amendment 0006 is to be submitted with its proposal.

Name

Company

Date https://www.fbo.gov/

File details come from the government source that posted it.