2016-6701

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-17-R-5018

X 9B. DATED (SEE ITEM 11)

11-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2017

CODE

GARRISON CONTRACTING BRANCH

CCRC-IG

BLDG 60, 3RD FLOOR

3055 RODMAN AVENUE

ROCK ISLAND IL 61299

W52P1J 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W52P1J-17-R-5018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

The purpose of this Amendment is to:

1. Extend the closing date from 12 June 2017 at 10:00AM CST to 19 June 2017 at 10:00AM CST.

2. Update ATTACHMENT 0001 SOW PR2016-6701 Water Main 06 June 2017.

3. Provide ATTACHMENT 0004 Boring Bedrock.

4. Provide ATTACHMENT 0005 Marked Up Tunnel Photos and Detail.

5. Update the description of CLIN 0001 - to request 250 cubic yards of bedrock and old foundation(s) to be included in the proposal and a request for an unit price for the bedrock and old foundation(s) if additional excavation and removal is required during performance of this contract.

6. Add clause 52.216-5 Price Redetermination.

7. Provide answers to contractor’s questions:

1. Q: First is it possible to get a time extension for the bid date (approx. 2 weeks)? The reason is there is a huge Illinois letting on June 16 for the Illinois side of the I-74 River Bridge.

A: The closing date has been extended to 19 June 2017 at 10:00AM CST.

2. Q: Are we to bid the project assuming all of the excavation required for this project can be excavated with an excavator? No rock excavation?

A: Please refer to ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, section 5.3 Bedrock and Old Foundations.

3. Q: Can we receive any and all soil boring's the Corp has in the area of this project?

A: Please see added map named ATTACHMENT 0004 Boring Bedrock” which has location and depths of bedrock or depth boring stopped without refusal.

4. Q: Section 5.2.1 How long can this line be out of service to ream and poly coat?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

5. Q: Section 5.2.1.2 How long can the sprinkler service for bldg 110 be out of service?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

6. Q: Section 5.2.1.10 How long can this be out of service?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

7. Q: Section 5.2.2.2 How long of sections gets the 6" HDPE slip lined in step, the 8" DIP on the fire loop? All of that line from station 0+00F to 10+20F?

A: The hole of the fire loop is expected to be slipped line with HDPE, from ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.2.2.2 to 5.2.2.13 and the second RPZ and hot box install.

8. Q: Section 5.2.3 How long do we install a new 8" HDPE main?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

9. Q: Section 5.2.3.10 How long can this be out of service?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

10. Q: Section 5.2.4.9 How long can this be out of service?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

11. Q: Section 5.2.4.10 How long can this be out of service?

A: Please see ATTACHMENT 0001 SOW - PR2016-6701 Water Main 06 June 2017, Section 5.6 Outages, Impacts, and Boil Orders.

12. Q: Section 5.2.5 How deep is the tunnel we have to go under?

A: Please see two photos and detail included in file named “ATTACHMENT 0005 Marked up Tunnel photos and detail”. There are no specific plans only a detail or two available for the tunnel.

13. Q: Is it possible to receive all the as-builts for the area in which this project will effect?

A: The most pertinent as-builts have been made available via ATTACHMENT 0002 DRAWINGS- PR2016-6701 Water Main.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 12-Jun-2017 10:00 AM to 19-Jun-2017 10:00 AM.

CLIN 0001

The CLIN extended description has changed from:

Repair Water Main and Improve Water Quality of Building 170 along East Street, 2nd Street, and Beck Avenue in accordance with the Scope of Work dated 12 April 2017 PR# 2016-6701.

To:

Repair Water Main and Improve Water Quality of Building 170 along East Street, 2nd Street, and Beck Avenue in accordance with the Scope of Work dated 12 April 2017 PR# 2016-6701.The Government estimates that 250 cubic yards of bedrock and old foundation(s), measured in situ, needs to be excavated and removed, please include these costs in your proposal.Please provide a unit price for the bedrock and old foundation(s):Excavation and removal of bedrock/old foundation(s) $_________/cubic yard (in situ).*You are advised that the unit prices set forth for the excavation and removal will be utilized in the event additional excavation and removal is required during performance of this contract. *Funds unused for excavation and removal will be returned to the Government based upon the provided cubic yards (in situ) price..

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.216-5 Price Redetermination--Prospective OCT 1997

(End of Summary of Changes)