W52P1J-17-R-3019-0002.pdf
PDF 21 KB Posted
- Attached to
- 60mm & 81mm Cushion and Pad
- Solicitation number
- W52P1J-17-R-3019
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W52P1J-17-R-3019_Amend_0001.pdf | ||
| W52P1J-17-R-3019.pdf | ||
| Attachment_0001-Price_Matrix_W52P1J-17-R-3019.xlsx | XLSX spreadsheet | |
| Exhibit_A_CDRL_W52P1J-17-R-3019.pdf | ||
| 9390715F.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Attached
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-17-R-3019
X 9B. DATED (SEE ITEM 11)
28-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2017
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
CCRC-IS
BLDG 60, 3RD FLOOR
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J-17-R-3019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. The purpose of Amendment 0002 to Solicitation W52P1J-17-R-3019 is twofold:
a. To answer the following Contractor Question(s):
Q: Item 0003 on the RFQ “81mm cushion padding” has material A-A-59203 with a size of 3 – 3/8 dia x 1/16 thickness. It says see note 3 on dwg 9362799. Note 3 seems to refer to the 9362799-5 which it shows with a 1/4 “ thickness, not a 1/16”. The 1/16th” seems to refer to a commercial chipboard material and not the padding. Can you clarify for me which thickness 0003 is requesting? Is it actually 1/16” thickness? Or maybe its actually supposed to be chipboard?
A: The proper size for CLIN 0003 81MM Cushion Padding is as follows: Size: 3 - 3/8 Dia" X 0.250" +/- 0.025" thick.
b. Revise CLIN 0003 to reflect the correct description.
2. All other terms and conditions remain unchanged.
3. The Point of Contact for this action is Rebecca Jessen, at rebecca.y.jessen.civ@mail.mil.
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN extended description has changed from:
Material: Padding Material Resilient, Type I or II, A-A-59203Size: 3 - 3/8 Dia X 1/16 ThickNote 3:
materialDrawings 9362799 Rev U, dated 06 Oct 09 (Distro D) and 12993640 (2 sheets) Rev B, dated 06 Oct 09 (Distro D)MIL-P-13607Proposed Unit Prices are to include First Article Test (FAT) via Price MatrixAttachment 0001.Material certification shall accompany each lot of material shipped to PBA.End item: 81mm (M819) M853 Illum M816IR
To:
Material: Padding Material Resilient, Type I or II, A-A-59203Size: 3 - 3/8 Dia" X 0.250" +/- 0.025" thick IAW Drawings 9362799 Rev U, dated 06 Oct 09 (Distro D) and 12993640 (2 sheets) Rev B, dated 06 Oct 09 (Distro D) and MIL-P-13607. Proposed Unit Prices are to include First Article Test (FAT) via Price Matrix Attachment 0001.Material certification shall accompany each lot of material shipped to PBA.End item: 81mm (M819) M853 Illum M816IR.
(End of Summary of Changes)