Amendment 0003 to Solicitation

View the file

Other files

File Type Posted
W52P1J17R0029-0004.pdf PDF
Attachment_0002,_Prce_Matrix_27JUN17.xlsx XLSX spreadsheet
W52P1J17R0029_0002.pdf PDF
W52P1J17R0029-0001.pdf PDF
W52P1J17R0029.pdf PDF
ATTACHMENT0001.pdf PDF
ATTACHMENT0002.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

MICHAEL V. GOOD

EMAIL: MICHAEL.V.GOOD.CIV@MAIL.MIL

W52P1J-17-R-0029

2017JUN01

X

X 2017JUL14 08:00am

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 10

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MICHAEL V. GOOD

Buyer Office Symbol/Telephone Number: CCRC-RK/(309)782-4130

Type of Contract 1: Firm Fixed Price

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

1. Amendment 03 is being issued to:

a. Provide responses to questions that were submitted to the Government for solicitation W52P1J-17-R-0029.

b. Update W52P1J-17-R-0029 Section L and Section M.

c. Provide updated Attachment 0002, Price Matrix to add requirement for Bobcat skid steer loader.

d. Extend the closing date of W52P1J-17-R-0029 from 05 July 2017 to 14 July 2017.

e. Add requirement that within seven (07) calendar days after award the successful offeror shall provide a memorandum signed by

Jordanian Armed Forces that the offeror has been authorized access to conduct operations in support of awarded transportation and material handling equipment contract on any Jordanian Armed Forces-owned installations throughout Jordan.

2. Questions and responses from the Government are as follows:

a. We reached out to a senior JAF officer in order to procure this memorandum (Per section L.7.1.3) but was denied since JAF has no intentions on signing any base memorandums until contract award. They have been contacted by a number of vendors and do not wish to make any commitments until receipt of award in order to deal with only one vendor. Will the USG consider modifying this requirement to state

Vendor must procure JAF memorandum within 15 calendar days upon receipt of award?

Answer: Reference revised Sections L and M.

b. Is transportation required to Qatraneh & Rukban? If so, we recommend adding language about military permitting for all transportation assets driving throughout those regions.

Answer: The only known location is Tower 22.

c. Can the USG clarify how the Duration of work as identified in PWS paragraph 8.1 Transportation Equipment will be applied to the handling equipments? For example; can the Forklift be requested to do loading and offloading in 3 deferent location within 1 day order?

If yes, are we transporting the forklift from Location A to B on our own expenses? If yes, transporting heavy equipment takes normally more time than trucks transportation which might delay offloading at destination. If the delay resulting from transporting the forklift caused a mission delay that exceed 24hrs can we double charge all order for that day mission? All above is also applicable for the cranes as the maximum speed for requested cranes according to manufacture guideline is 37Km/h.

Answer: When requested, the Material Handling Equipment (MHE) can be utilized in three different locations within a 24 hour time frame from beginning of services. If the 24 time frame is exceeded, and the equipment still needs to be used, the customer will be charged for an additional 24 hour service charge. For instance if 24 hour period starts at 0600 on Monday and equipment is used until 0800 on

Tuesday the customer will be charged for initial service and an additional service for going over the 24 hour period.

d. Regarding section L.7.1.7 if we can produce a signed letter of commitment from our key subcontractor (who owns these assets) will that meet the USG requirement? We do not currently own these assets but can immediately deploy based upon our existing subcontractor relationship.

Answer: Yes, as long as the vendor is able to procure the assets upon request by the USG within the stated time.

e. What is the minimum insurance amount for all cargo transportation in case of a lost / stolen or damaged container? What is the minimum insurance amount for all armored vehicle transportation? (T-72s, BMPs, M1A1, etc.)

Answer: This a business decision that needs to be made by the company depending on the amount of liability and risk the company is willing to accept.

f. In consideration of clause 1.4.11 (Insurance) in the PWS for Jordan Transportation and MHE RFP, we have two questions concerning insurance requirements as the answers will affect our incurred costs: What is the approximate value of US cargo requiring insurance and how much life insurance coverage for local personnel is required/recommended by the USG to support this contract?

Answer: Value of cargo and equipment being transported/handled will vary widely between Task Orders. The amount of insurance needed to be covered for cargo and local personnel is a business decision that needs to be made by the company depending on the amount of

2 10

W52P1J-17-R-0029 0003

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

liability and risk the company is willing to accept.

g. In reference to Duration of work as identified in PWS paragraph 8.1 Transportation Equipment. The USG states, Contractor must provide transportation equipment and operators within 12 hours of receiving a request from the USG, can you provide more accurate definition to this statement as within definition includes 0-12hrs which can cause a problem translating contract later on.

Answer: Vendor has to ensure that they are able to accommodate a customers request within a 12 hour timeframe, NLT 4 hours before mission commencement. This implies that a vendor has a 4-12 hour window to ensure they meet the needs of the USG.

h. In reference to paragraph 1.1 Description of Services/Introduction. Can the USG provide guideline for change order time as well?

Answer: If a change order is issued for Task Order already initiated vendor will be allowed sufficient time to schedule the different assets/operators.

i. In reference to Austere Environment Missions; flat rate per mission regardless number of assets used is difficult to quote based on description of the service and number of possible mission assets with possible maintenance and failures. We are requesting a change to be per vehicle.

Answer: Rate is based per piece of equipment used for any particular mission.

j. In reference to ATTACHMENT 2 Material Handling Equipment; you mentioned in the product specification for the 30ton crane minimum load is 30 ton which is wrong according to the manufacture guideline for Grove RT 530E2 crane which can lift up to 30ton on its maximum capacity. Same thing for the 60ton crane. Please clarify.

Answer: Attachment two does not state the minimum load is 30 ton/60 ton, it annotates the Crane will be required to lift a minimum of

30/60 tons. In the event the customer requests the 30T/60T and it is not able to fulfill its duties, then the vendor will be held liable for any damages/ maintenance discrepancies, and the USG will not be charged for its usage.

k. In regards to this RFQ, should we submit our bid/relevant attachments via e-mail to the POC or should we submit via the electronic response option?

Answer: In accordance with solicitation W52P1J-17-R-0029 section L.4. PROPOSAL SUBMITTAL proposals will be submitted to mailbox:

usarmy.ria.acc.mbx.W52P1J-17-R-0029@mail.mil.

3. All other terms and conditions of Solicitation W52P1J-17-R-0029 remain unchanged.

*** END OF NARRATIVE A0004 ***

3 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0002 PRICE MATRIX 27-JUN-2017 004

4 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1. GENERAL INSTRUCTIONS. Proposals in response to solicitation W52P1J-17-R-0029 shall be submitted in accordance with this section.

Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. The proposals shall clearly and convincingly communicate the capability of the offeror to perform the work as required. Proposals must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence of how contract requirements will be met.

The Offeror is expected to review the Performance Work Statement (PWS) contained in Section J of this Request for Proposal (RFP) for further insight into the areas that the proposal must address. Failure to provide the required supporting documentation may result in your offer being rejected. The United States Government (USG) intends to make one award using the Lowest Priced Technically Acceptable

(LPTA) evaluation criteria outlined in this solicitation.

The Government reserves the right to award without discussions (see FAR 52.215-1); consequently, it is your responsibility to submit a proposal that conforms to all of the terms and conditions of the solicitation and this section and contains your best offer. Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding or commitment not specified in the proposal. Should discussions become necessary, the Government reserves the right to hold discussions in accordance with (IAW) FAR Part 15.306. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR

Part 15.306 (c)(2).

L.2. POINT OF CONTACT. The Procuring Contracting Officer (PCO) is the sole point of contact for this acquisition. Any questions or concerns shall be addressed, in English, to the PCO. E-mail is the preferred method of communication.

E-mail: usarmy.ria.acc.mbx.W52P1J-17-R-0029@mail.mil

L.3. STANDARD PROPOSAL INSTRUCTIONS. This section specifies the instructions each Offeror shall use in preparing its proposal. The intent is not to restrict the manner in which proposals are prepared, but rather to ensure a certain degree of uniformity in proposal format for evaluation purposes. Three separate volumes shall be submitted.

L.3.1. Each proposal shall consist of the following:

Volume I: Supplemental Documents

Volume II: Technical Factor

Subfactor 1: Mission Capabilities

Subfactor 2: Quality Control Plan

Volume III: Price Factor

Three separate volumes shall be submitted. These volumes shall be self-contained and shall not be cross referenced. Proposals not structured IAW these instructions may be considered incomplete and may not be evaluated. The proposal shall include the following volumes subject to the limitations discussed below:

Offerors shall email one electronic copy for Volume I and III of the proposal, which must be virus free. For the Technical Volume II, Offerors shall include two electronic copies. One electronic copy of the technical proposal and another electronic copy completely redacting all company name/logos/pictures from all pages of the technical proposal with the exception of the volume cover page. All copies of the proposal shall be submitted using Microsoft Office (MS) Word, MS Excel (for the Price Volume only) or Adobe Acrobat software. All copies of an individual volume shall be identical. The use of hyperlinks in proposals is prohibited.

L.3.2. Proposal Format:

Page Layout: Pages must be 8.5 x 11, 12 Point, Ariel font, and single-spaced. Font size that is smaller than 12 point is ONLY acceptable in graphics, sketches, tables, charts, price matrix, etc. but must be readable without magnification. 11 x 17 inch folded pages are acceptable for tables/graphic representations; however, each 11 x 17 inch page counts as two pages. Any page that does not comply with these requirements will not be evaluated.

Proposal Limitation: The Technical Volume shall not exceed 50 pages. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will not be evaluated. The Offeror shall number each page consecutively. In the event the Offeror creates an ambiguity in its numbering of the pages, the Government may exercise its own discretion in counting pages. The following will not count against page limitations: Title or Cover pages, table of contents pages, acronym lists, Glossaries, Resumes, and page dividers (used to separate proposal sections). Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, annexes, documentation, attachments, etc. will count against the page limitations. Anything else not specifically specified in this paragraph will be included in the page count.

Each page is defined as one sheet, one-side. Excess pages will be removed from the back of each volume and will NOT be read or

5 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

evaluated. Page limitations do not prohibit the Government from requesting additional supporting data.

Each volume shall be organized and formatted so that an extensive search of the proposal is not necessary to perform an evaluation. The

Technical volume shall contain a Table of Contents that identifies all paragraphs and subparagraphs covered within that volume by paragraph and subparagraph number, title, and by page number, a list of tables, figures, etc. Information not in its appropriate volume and not appropriately referenced may be assumed to have been omitted. Volumes shall not be cross-referenced. Price proposal information shall not be included in the Technical Volume and the Technical Volume shall not exceed the specified length regardless of the reason.

L.4. PROPOSAL SUBMITTAL. Offerors must electronically submit a complete proposal as identified below prior to the closing date and time listed on page 1 of the solicitation. Offerors are responsible for contacting the Contracting Officer and/or Contract Specialist to confirm that proposals submitted have been received by the Contracting Officer and/or Contract Specialist by the date/time set in the solicitation for receipt of offers. Any proposal, or partial proposal, received after will be considered late and will not be considered for award. The Government will not accept any changes to the contractors proposal after the closing date of the solicitation (See FAR

15.208 for further information regarding late proposals).

All proposals and all related information shall be submitted in the format identified above, to the Army at the address shown below:

E-mail: usarmy.ria.acc.mbx.W52P1J-17-R-0029@mail.mil

Maximum e-mail attachment size is 15MB, which includes the email itself and ALL attachments. Complete proposal submittal may take numerous emails. When submitting multiple emails, the emails must be submitted consecutively. In addition, the Offerors must identify the total number of emails to be received (Example: Email 1 of 3, Email 2 of 3, Email 3 of 3). Please note that self-extracting .exe and

.zip files are no longer accepted. Offerors are advised to confirm the receipt of proposals. Failure to do so risks the failure to submit a timely proposal. Note: Receipt means receipt in the e-mail inboxes of the above mentioned individual, not merely arrival at a

Government server. Failure to confirm receipt will result in the waiver of any argument of an offer being timely sent, but not delivered. It is highly recommended that Offerors request a delivery confirmation or other form of acknowledgement to verify the proposal submission was received.

Should an Offeror have difficulties with the delivery of proposals, please immediately notify the PCO at usarmy.ria.acc.mbx. W52P1J-17-R-

0029@mail.mil.

L.5. THE FREEDOM OF INFORMATION ACT (FOIA). FOIA and its amendment have resulted in an increasing number of requests from outside the

Government for copies of contractors' proposals and other documents submitted to federal agencies. If an Offeror's submission contains information that it believes should be withheld from such requestors under FOIA on the grounds that it contains trade secrets and commercial or financial information [5 USC 552(b)(4)], the Offeror should mark its submissions in the following manner:

L.5.1. The following notice should be placed on the title page: Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secret or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) ___.

L.5.2. Each individual item considered privileged or confidential under FOIA should be marked by placing the text within {brackets} with the following notice placed in the right margin: Privileged or Confidential. Failure to do so may result in an involuntary release via a

FOIA request.

L.6. VOLUME I - SUPPLEMENTAL DOCUMENTS

There is no page limit to this volume, except as noted below.

- Completed and Signed Solicitation and any Amendments

- Executive Summary (5 page limit)

L.6.1. Solicitation. Offerors must provide a completed (all clause fill-ins) and signed copy of the solicitation including Sections A-K and any Amendments. An official of the firm authorized to legally bind the Offeror shall sign the electronic submission of the proposal to include the Standard Form (SF) 33, all signed amendment coversheets, SF30, and all certifications requiring signature. Offerors shall complete Box 12 of Standard Form 33, Solicitation, indicating its offer may be accepted within 180 calendar days of the RFP closing date.

L.6.2. Executive Summary. The Executive Summary should be a concise narrative of the entire proposal, including a highlight of any key or unique features, excluding price. It should include a detailed description of the internal corporate organizational hierarchy and the

Offeror's relationship to any higher corporate or parent companies to include any Joint Venture member and/or teaming member firms if applicable. The Executive Summary will not be evaluated for purposes of determining contract award. As such, any summary material presented here shall not be considered as meeting the requirements for any portions of other proposal volumes. The Offeror shall, at a minimum, provide an overview of its proposal and accurately summarize all parts of the proposal, except for the Price Volume.

6 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.7. VOLUME II - TECHNICAL PROPOSAL.

The Government will evaluate Offerors Technical Proposal using the following rating definitions:

Acceptable: Proposal meets the requirements of the solicitation.

Unacceptable: Proposal does not meet the requirements of the solicitation.

The Technical Factor is subdivided into two equally weighted subfactors. The requirement for an acceptable rating is for the Offerors proposal to clearly demonstrate a thorough approach and clear understanding of each of the subfactors. Offerors must be rated acceptable for each of the subfactors to be rated Technically Acceptable overall. The subfactors are:

Subfactor 1: Mission Capabilities

Subfactor 2: Quality Control Plan

L.7.1. Subfactor 1- Mission Capabilities.

L.7.1.1 - Describe the Offeror's level of experience and knowledge providing personnel, management, tools, supplies, equipment, materials, and supervision necessary to perform line haul and heavy lift transportation, MHE services, PAX transportation services and provide operators as defined in the PWS to various locations in Jordan that demonstrates its level of skill and working knowledge in this environment. Discuss the Offeror's skill and experience with the necessary steps to prevent internal sabotage or harm to the mission. Specifically address compliance with Jordanian laws, rules and regulations that demonstrate your understanding of the processes, procedures, capabilities and experience necessary to successfully execute the OCONUS requirements.

L.7.1.2 - Describe the Offeror's level of experience working contracts in the austere contingency environments throughout Jordan that demonstrates its level of skill and working knowledge in this environment. Describe the Offeror's experience and knowledge providing all listed assets expected to travel through rough desert terrain with thick dust and jagged rocks for a duration of time lasting over 12 hours and covering at minimum 350 KM. The trip may require extra vehicle maintenance, fuel, and long hours worked by operators.

L.7.1.3 - Offerors must provide proof of licensing to conduct business within the Kingdom of Jordan.

L.7.1.4 - Offerors proposal shall include a plan of action to ensure that all drivers and operators are cleared by JAF for access to JAF installations in order to perform required services. Plan should indicate all necessary steps and forms required to complete clearance process.

L.7.1.5 - Offerors shall provide a list of available assets and equipment that meet the minimum guaranteed quantity listed in Section A of the solicitation. Offeror must demonstrate that they have the required number of assets currently in inventory or if they are not currently in inventory, proposal must demonstrate how the Offeror will obtain the required assets within 24-hours of a call order being issued.

L.7.1.6 - Offerors shall include a detailed plan that addresses its assets and identifies its proposed subcontractors. Supporting evidence shall include letters of commitment from each proposed subcontractors. The letter of commitment shall include at a minimum the assets to be provided within the timeframes established in the PWS and a commitment to establish a working relationship with the offeror in providing the required assets.

L.7.1.7 - Offeror shall demonstrate at a minimum the immediate availability of the following: 65 x 40 Foot Flatbed Truck & Trailer; 20 x

70 Ton Heavy Equipment Transporter (HET); 16 x 30 Ton Cranes. Additionally, offeror shall detail its plan/procedure to obtain and transport all other assets not available in fleet to include but not limited to: 30 Ton Lowboy; Backhoe w/ Front Loader; 25 Pax Bus; 45

Pax Bus; Variable Reach Rough Terrain Forklift (15K); Variable Reach Rough Terrain Forklift (10K); 20 Foot Cargo Truck (Baggage Truck);

Bobcat Skid Steer Loaders; 60 Ton Crane; Rough Terrain Container Handler (RTCH).

L.7.2. Subfactor 2. Quality Control Plan.

L.7.2.1 - Offeror shall submit a Quality Control Plan (QCP) on how it will develop, manage and maintain a quality program and ensure services are performed in accordance with the PWS. The QCP shall address procedures to identify, prevent and ensure non-recurrence of defective services. The QCP shall address the areas identified in Technical Exhibit 1, Performance Requirements Summary of the PWS to include procedures to ensure all employees have the necessary credentials (ID, and all valid operator licenses) in order to perform effectively.

L.7.2.2 - The QCP shall demonstrate that the offeror has Personal Protective Equipment (PPE) on hand. PPE includes, but is not limited to safety steel toe shoes, coveralls or equivalent, safety goggles, eye protection, hearing protection, hard hats, and gloves in order to comply with local equipment operation policies, and is in accordance with the United States Occupational Safety and Health

Administration policies. Offeror shall also identify any gaps with PPE and ways to rectify deficiencies.

L.7.2.3 - Offeror will submit its plan for scheduled and corrective maintenance identifying its processes and procedures for ensuring

7 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

all vehicles, handling equipment, and cargo handling accessories i.e. straps, slings, and cables, will be load tested and meet all scheduled maintenance requirements. The corrective maintenance plan shall detail how any and all vehicle and asset deficiencies will be corrected and the planned course of action in the event a vehicle becomes inoperable during the mission and needs replacement.

L. 8. VOLUME III- PRICE PROPOSAL.

1. Proposed prices will be used by the Government to calculate the total evaluated price for the five ordering periods. Offerors shall complete the Transportation, MHE and Austere Environment Mission tabs on the Price Matrix for the Transportation Equipment, Material

Handling Equipment, and Austere Environment Missions, Attachment 0002. Note the Summary tab includes formulas and will automatically fill in once the offeror has completed the other tabs. Offerors shall submit Firm Fixed Unit Prices for all CLINs, ranges and Ordering

Periods. The instructions for completion of the Price Matrix are as follows:

a. The offeror shall fill in all information highlighted in yellow on the Price Matrix, Attachment 0002. If an Offeror fails to fully complete the Pricing Matrix, the Government may determine that the Offeror's proposal is unacceptable and may no longer consider the proposal for award.

b. The offeror shall enter its full name in the space provided on the Transportation Equipment Price Matrix;

c. Offerors are required to propose binding Firm Fixed Unit Prices inclusive of all costs, rates, and factors, as applicable.

d. Offerors shall not make any changes or add any other information to the Price Matrix.

e. All proposed prices for this acquisition shall be stated in U.S. dollars and rounded to the nearest whole dollar value;

f. Offerors are cautioned against placing conditions or qualifications upon its price proposals that are contrary to, or otherwise attempt to amend, the requirements of the solicitation; doing so may result in an offer being deemed non-responsive or unacceptable for further consideration of award. Any such condition or qualification shall be void.

g. Data Other Than Certified Cost or Pricing Data. The Government anticipates receiving competitive proposals and using competition to determine price reasonableness. The Government reserves the right to request data other than certified cost or pricing data after receipt of proposals. If required, data other than certified cost or pricing data must be submitted in accordance with the instructions specified at FAR 15.403-5.

*** END OF NARRATIVE L0002 ***

8 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

M.1. BASIS FOR CONTRACT AWARD. This acquisition will use formal Lowest Price Technically Acceptable source selection processes and techniques IAW Federal Acquisition Regulation (FAR) 15.101-2.

The Army Contracting Command Rock Island (ACC-RI) will make an award to the responsible contractor whose offer is determined to provide the lowest price technically acceptable approach to the Government considering price and non-price factors. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability.

The Government reserves the right to: limit the competitive range for the purposes of efficiency; award with or without discussions based upon the SSAs review of the initial evaluation results; and make no award should no Offeror provide an acceptable offer based on the criteria set forth in the solicitation.

All proposals received pursuant to this solicitation will be evaluated in the same manner. Selection of the successful offeror will be made following an assessment of each proposal against the solicitation requirements and the cited evaluation criteria. The criteria will be used to evaluate and assess the information provided by the offerors in response to the information called for in all sections of the solicitation.

M.2. NUMBER OF CONTRACT AWARDS. The Government intends to award a single Indefinite Delivery Indefinite Quantity (IDIQ) contract to the

Offeror providing the Lowest Price Technically Acceptable offer to the Government. The resultant contract for this solicitation will be a Firm Fixed Price (FFP) five year IDIQ contract. The Government reserves the right to reject any or all proposals and make no award if such action is in the best interest of the Government.

M.3. VOLUME 1. SUPPLEMENTAL DOCUMENTS.

M.3.1. Solicitation. The Government will review the completed solicitation and amendments for accurate completion and applicable signatures.

M.3.2. Executive Summary. The Executive Summary will not be evaluated. Rather, it will be reviewed to assist evaluators in familiarizing themselves with the approach each Offeror will use to meet the requirements of the Performance Work Statement (PWS).

M.4. EVALUATION APPROACH. All proposals with acceptable supporting documentation shall be subject to evaluation by the Source Selection

Team (SST).

M.5. TECHNICAL PROPOSAL. Offerors Technical Proposal will be evaluated on an Acceptable/ Unacceptable basis. A rating of Acceptable for each sub-factor is required to receive an overall Technical Factor rating of Acceptable. Incomplete or unclear proposals will be determined to be unacceptable. Only offerors whose Technical proposals are determined to be Acceptable will have their Price proposal evaluated and be considered for award. Ratings are assigned as follows:

Acceptable: Proposal meets the requirements of the solicitation.

Unacceptable: Proposal does not meet the requirements of the solicitation.

M.5.1. Subfactor 1. Mission Capabilities.

M.5.1.1 Offeror adequately described their level of experience and knowledge providing personnel, management, tools, supplies, equipment, materials, and supervision necessary to perform line haul and heavy lift transportation, MHE services, PAX transportation services and provide operators as defined in the PWS to various locations in Jordan that demonstrates its level of skill and working knowledge in this environment. They discussed their skill and experience with the necessary steps needed to prevent internal sabotage or harm to the mission. They specifically addressed their understanding of the need for compliance with Jordanian laws, rules and regulations that demonstrated their understanding of the processes, procedures, capabilities and experience necessary to successfully execute the OCONUS requirements.

M.5.1.2 - Offeror described their level of experience performing contracts in the austere contingency environments throughout Jordan that demonstrates its level of skill and working knowledge of this environment. Offeror's proposal showed the necessary experience and knowledge providing all listed assets expected to travel through rough desert terrain with thick dust and jagged rocks for a duration of time lasting over 12 hours and covering at minimum 350 KM. The trip may require extra vehicle maintenance, fuel, and long hours worked by operators.

M.5.1.3 - Offerors proposal provided proof of licensing to conduct business within the Kingdom of Jordan.

M.5.1.4 - Offerors proposal included a plan of action to ensure that all drivers and operators are cleared by Jordanian Armed Forces for access to Jordanian Armed Forces installations in order to perform required services. Plan indicated all necessary steps and forms required to complete clearance process.

9 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.5.1.5 - Offerors proposal provided a list of available assets and equipment that meet the minimum guaranteed quantity listed in

Section A of the solicitation. Offeror demonstrated that they have the required number of assets currently in inventory, or if they are not currently in inventory, proposal demonstrated how the Offeror will obtain the required assets within 24-hours of a call order being issued.

M.5.1.6 - Offerors proposal included a detailed plan that addresses its assets and identifies its proposed subcontractors. Supporting evidence included letters of commitment from each proposed subcontractors. The letters of commitment included at a minimum the assets to be provided within the timeframes established in the PWS and a commitment to establish a working relationship with the offeror in providing the required assets.

M.5.1.7 - Offeror demonstrated at a minimum the immediate availability of the following: 65 x 40 Foot Flatbed Truck & Trailer; 20 x 70

Ton Heavy Equipment Transporter (HET); 16 x 30 Ton Cranes. Additionally, offeror shall detail its plan/procedure to obtain and transport all other assets not available in fleet to include but not limited to: 30 Ton Lowboy; Backhoe w/ Front Loader; 25 Pax Bus; 45 Pax Bus;

Variable Reach Rough Terrain Forklift (15K); Variable Reach Rough Terrain Forklift (10K); 20 Foot Cargo Truck (Baggage Truck); Bobcat

Skid Steer Loaders; 60 Ton Crane; Rough Terrain Container Handler (RTCH).

M.5.2. Subfactor 2. Quality Control Plan.

M.5.2.1 - Offeror submitted a Quality Control Plan (QCP) demonstrating its plans to develop, manage and maintain a quality program that ensures services are performed in accordance with the PWS. The QCP addressed procedures to identify, prevent and ensure non-recurrence of defective services. The QCP also addressed the areas identified in Technical Exhibit 1, Performance Requirements Summary of the PWS to include procedures to ensure all employees have the necessary credentials (ID, and all valid operator licenses) in order to perform effectively.

M.5.2.2 Offerors QCP demonstrated that the offeror has PPE on hand, to include but not limited to, safety steel toe shoes, coveralls or equivalent, safety goggles, eye protection, hearing protection, hard hats, and gloves in order to comply with local equipment operation policies, and that this equipment is in accordance with the United States Occupational Safety and Health Administration policies.

Offeror also identified any gaps with PPE and ways to rectify the deficiencies.

M.5.2.3 - Offeror submitted its plan for scheduled and corrective maintenance identifying its processes and procedures for ensuring all vehicles, handling equipment, and cargo handling accessories i.e. straps, slings, and cables, will be load tested and meet all scheduled maintenance requirements. The corrective maintenance plan provided sufficient detail on how any and all vehicle and asset deficiencies will be corrected and the planned course of action in the event a vehicle becomes inoperable during the mission and needs replacement.

M.6. FACTOR 3 PRICE PROPOSAL.

1. Offerors shall submit Attachment 0002, Price Matrix with all formulas as provided with the solicitation. PDF files are not acceptable.

2. The Government will evaluate offers based on the prices proposed on the Price Matrix. For each proposal, the Government will calculate a Total Evaluated Price by adding the total of all CLINs, range and Ordering Periods. Failure to provide prices for all CLINS, ranges and Ordering Periods may be considered unacceptable and the Government may reject the proposal.

A subtotal for each Ordering Period will be calculated by summing the CLIN weighted prices. The CLIN weighted prices are calculated by multiplying the quantity of 1 times the weight times the Offerors Fixed Unit Price. A Total for each Transportation Equipment, MHE and

Austere Environment Missions will be calculated by summing the subtotals of the five Ordering Periods. A Total Evaluated Price will be calculated on the Summary Tab by summing the Total for Transportation Equipment, MHE and Austere Environment Missions.

3. For evaluation purposes, the Total Evaluated Price is automatically calculated on the Summary Tab by summing the Total for

Transportation Equipment, MHE and Austere Environment Missions. The Total Evaluated Price is the summary of the total evaluated prices for each Price Matrix tab and all ordering periods plus the Extension of Services FAR Clause 52.217-8. The offerors do not propose the amount for the Extension of Services; it is equivalent to 50% of the Ordering Period five (05) Total Evaluated Price. It is calculated on the respective Price Matrix.

4. Price analysis will be used to determine price reasonableness and whether the proposals reflect an understanding of the effort required. As part of the price evaluation, proposals may be reviewed to identify any significant unbalanced pricing. In accordance with

FAR 15.404-1(g), Unbalanced Pricing, a proposal may be rejected if the Contracting Officer determines the lack of balance poses an unacceptable risk to the Government.

5. Additional analysis techniques may be used as determined necessary by the Contracting Officer. These methods of evaluation may include the use of information/input from sources such as (but not limited to) other Government agencies and personnel.

*** END OF NARRATIVE M0002 ***