WIDEBAND SATELLITE COMMUNICATIONS (SATCOM) TREND ANALYSIS AND

ANOMALY RESOLUTION SUBSYSTEM/WIDEBAND SATCOM OPERATIONS

MANAGEMENT SYSTEM (WSOMS) MEDIATED INTEROPERABILITY

INFRASTRUCTURE (WSTARS/WMII)

TASK ORDER 0001

Customer Requirements Statement (CRS)

1. PURPOSE

The primary purpose of this Task Order (TO) is to complete the Definition and Design of the requisite WSTARS capability to operate as a functional replacement for the existing Defense Satellite Communications System (DSCS) Integrated Management System (DIMS), as well as complete the Definition and Design of the Centralized Wideband Control Database and Common Information Management system.

Moreover, the Definition, Design, Procurement, and Build of the Integration Hardware Environment (IHE) for the full WMII Converged and Composable Infrastructure will be completed during this TO.

Finally, the additional WSTARS functionality that will be implemented across the final four years of the overall indefinite delivery/indefinite quantity (IDIQ) contractual effort, will be investigated and defined during this TO.

2. TYPE OF ORDER

The Government will award a Cost Plus Fixed Fee Task Order for this effort.

3. PERIOD OF PERFORMANCE (PoP)

The contractor shall complete this TO within 12 months of the contract award, with the exception of Program Management and Cyber Security which have a PoP of 12 months from TO award with four, 12 month option periods.

4. OBJECTIVES

a) Develop and maintain a WSTAR/WMII Product Roadmap (as defined in Section 1.1.a of the WSTARS/WMII base IDIQ CRS.) of iteratively derived functionality across the life of the contract, which includes dependencies on the corresponding evolution of other WSOMS subsystems (as defined in Section 5.1 of the WSTARS/WMII Base Contract CRS).

b) Definition and design of a single centralized database each for Red and Black

Equipment Areas for the WSOMS subsystems including, but not limited to CNPS, GSCCE, RSCCE, WRMS, GT3CS, JMOS, RFMOW, RRFIS, and RMCE (as defined in Section 5.1 of the WSTARS/WMII base IDIQ CRS.)).

c) Definition and design of a standardized Information Management system conforming to Service Oriented Architecture (SOA) standards.

d) Design and implementation of a Common Object Request Broker Architecture (CORBA) to SOA Translator, as the interim WSTARS/WMII interface with all applicable WSOMS subsystems.

e) Definition, Design, Procurement, and Build of three (3) identical IHE Converged and Composable Infrastructures that host the CNPS, GSCCE, RSCCE, WRMS, GT3CS, JMOS, RFMOW, RRFIS, and RMCE subsystem applications and associated databases in a Virtual Machine environment.

f) Assist other WSOMS subsystems Integrated Product Teams (IPTs) with conversion to new Database and Information Management designs and interfaces.

g) Identify and Develop Necessary legacy DIMS functionality for WSTARS.

h) Investigate and develop WSTARS design requirements for:

o Resource Allocation and Configuration Tool o Trend Analysis and Anomaly Resolution o Data Collection & Trouble Tickets o Public Key Infrastructure (PKI) / Access Management o Cybersecurity / Information Assurance

5. ASSUMPTIONS

• General Information requirements (as defined in Section 1.2 of the WSTARS/WMII base IDIQ CRS) and deliverables of the WSTARS/WMII Base Contract CRS are applicable, unless noted in this Task Order.

• Mutual cooperation will exist between the WSTARS/WMII contractor and the other WSOMS subsystems IPTs, and all WSOMS subsystem dependencies identified in the aforementioned Product Roadmap will be accomplished within the required timeframe.

• In addition to the GFI (listed in Section 3.3 of the WSTARS/WMII base IDIQ CRS) that will be supplied upon contract award, Attachment 1: DIMS Synopsis, provides a summary of the pertinent information regarding legacy DIMS requirements, and associated interfaces with other subsystems.

6. SCOPE

The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this task order that are not listed under Section 3 of the base CRS.

The Contractor shall be responsible for providing cables, connectors, and other ancillary equipment as required to configure the WSTARS/WMII systems to full operational states. All equipment fielded on Department of Defense (DOD) networks are required to be on the DOD Unified Capabilities (UC) Approved Products List (APL).

7. SPECIFIC TASKS

The Contractor shall perform applicable System Engineering tasks in accordance with the referenced WSTARS/WMII base IDIQ CRS Sections and Subsections:

i) CONVERGED AND COMPOSABLE WMII: INFRASTRUCTURE DESIGN

• Contractor shall define and design the Converged and Composable WMII hardware and software infrastructure necessary to provide the requisite Virtual Machine Host for WSTARS, in accordance with Section 5.1.a of the WSTARS/WMII base IDIQ CRS.

• Contractor shall produce a Drawing Tree as defined in Section 5.3.3 of the

• Contractor shall produce a Technical Data Package as defined in Section 5.3.4 of the WSTARS/WMII base IDIQ CRS.

• Contractor shall produce an Interface Control Document as defined in Section

5.3.6 of the WSTARS/WMII base IDIQ CRS.

• Contractor shall perform all necessary Safety tasks as defined in Section 5.7 and

Subsections of the WSTARS/WMII base IDIQ CRS.

• The following CDRLs apply to this task:

CDRL Data Item Description (DID) Description

H006 DI-DRPR-81961 Engineering Drawing Tree H007 DI-SESS-80776A Technical Data Package C015 DI-SAFT-80102C Safety Assessment Report (SAR) C016 DI-SESS-81248B Interface Control Document (ICD) https://aplits.disa.mil/apl/

ii) CONVERGED AND COMPOSABLE WMII: INFRASTRUCTURE PROTOTYPES

• Contractor shall procure, build, test, install, and verify the WMII Converged and

Composable Infrastructure IHE prototypes (Quantity 3), as defined in Sections 5.1.b and 5.3.1.a of the WSTARS/WMII base IDIQ CRS.

• Contractor shall perform all necessary Test, Evaluation, and Acceptance in accordance with Section 5.3.2 and Subsections of the WSTARS/WMII base IDIQ

CRS.

• Contractor shall produce an As-Built Configuration List in accordance with Section 5.3.5 of the WSTARS/WMII base IDIQ CRS.

• Contractor shall perform all necessary Post Design/Production Software Support tasks in accordance with Section 5.8 and Subsections of the WSTARS/WMII base IDIQ CRS.

F001 DI-IPSC-81488 Source Lines of Code F004 DI-IPSC-81488 Computer Software Product F005 DI-SESS-81646B Configuration Audit Plan F007 DI-CMAN-81516 As-Built Configuration List F008 DI-MISC-80711A Software Build Procedures F009 DI-IPSC-81441A Software Product Specification F010 DI-IPSC-81427A Software Development Plan (SDP) F012 DI-IPSC-81435A Software Design Description F015 DI-IPSC-81442A Software Version Description (SVD) J001 DI-NDTI-80566A Test Plan J002 DI-NDTI-80603A Test Procedures J003 DI-NDTI-80809B Test/Inspection Reports

J008 DI-NDTI-80809B Failure Analysis and Fault Correction Technical Report

iii) CENTRALIZED DATABASE

• Contractor shall ensure the centralized database is instantiated, and accessible to all applicable WSOMS subsystems in accordance with Section 5.1.c of the

• Contractor shall produce a Technical Data Package as defined in Section 5.3.4 of the WSTARS/WMII base IDIQ CRS.

• Contractor shall produce an Interface Control Document as defined in Section

5.3.6 of the WSTARS/WMII base IDIQ CRS.

C016 DI-SESS-81248B Interface Control Document (ICD) H007 DI-SESS-80776A Technical Data Package F001 DI-IPSC-81488 Source Lines of Code F004 DI-IPSC-81488 Computer Software Product F005 DI-SESS-81646B Configuration Audit Plan F007 DI-CMAN-81516 As-Built Configuration List F008 DI-MISC-80711A Software Build Procedures F009 DI-IPSC-81441A Software Product Specification F010 DI-IPSC-81427A Software Development Plan F012 DI-IPSC-81435A Software Design Description F015 DI-IPSC-81442A Software Version Description (SVD) J001 DI-NDTI-80566A Test Plan J002 DI-NDTI-80603A Test Procedures J003 DI-NDTI-80809B Test/Inspection Reports

iv) COMMON INFORMATION MANAGEMENT SYSTEM

• Contractor shall ensure that the Common Information Management system is instantiated and usable by all applicable WSOMS subsystems through the CORBA to SOA Translator, in accordance with Section 5.1.d of the

• Contractor shall produce a Technical Data Package as defined in Section 5.3.4 of the WSTARS/WMII base IDIQ CRS.

• Contractor shall produce an Interface Control Document as defined in Section

5.3.6 of the WSTARS/WMII base IDIQ CRS.

C016 DI-SESS-81248B Interface Control Document (ICD) H007 DI-SESS-80776A Technical Data Package F001 DI-IPSC-81488 Source Lines of Code F004 DI-IPSC-81488 Computer Software Product F005 DI-SESS-81646B Configuration Audit Plan F007 DI-CMAN-81516 As-Built Configuration List F008 DI-MISC-80711A Software Build Procedures F009 DI-IPSC-81441A Software Product Specification F010 DI-IPSC-81427A Software Development Plan F012 DI-IPSC-81435A Software Design Description F015 DI-IPSC-81442A Software Version Description (SVD) J001 DI-NDTI-80566A Test Plan J002 DI-NDTI-80603A Test Procedures J003 DI-NDTI-80809B Test/Inspection Reports

v) DIMS FUNCTIONALITY

• All necessary legacy DIMS functionality to be incorporated into WSTARS/WMII shall be identified and documented by the Contractor as defined in Section 5.1.j of the WSTARS/WMII base IDIQ CRS, and in accordance with CDRL F014: DI- IPSC-81433: Software Requirements Specification.

vi) WSTARS/WMII FUNCTIONALITY AND REQUIREMENTS WHITE PAPERS

• Contractor shall investigate and define appropriate WSTARS/WMII functionality and requirements in accordance with CDRL B0001: DI-MISC-80508B: White Paper, to implement a Resource Allocation and Configuration Tool defined in Sections 5.1.k.1 and 5.1.i.1 of the WSTARS/WMII base IDIQ CRS.

Paper, to implement Trend Analysis and Anomaly Resolution defined in Sections 5.1.k.1 and 5.1.i.2 of the WSTARS/WMII base IDIQ CRS.

Paper, to implement Status Reporting & Trouble Tickets defined in Sections 5.1.k.2 and 5.1.i.3 of the WSTARS/WMII base IDIQ CRS.

Paper, to implement PKI / Access Management defined in Sections 5.1.k.3 and 5.1.g of the WSTARS/WMII base IDIQ CRS.

Paper, to implement Cybersecurity and Information Assurance Requirements defined in Sections 5.1.k.4 and 5.4 of the WSTARS/WMII base IDIQ CRS.

vii) PROGRAM MANAGEMENT

• Contractor shall perform all applicable Program Management and Security tasks in accordance with the WSTARS/WMII base IDIQ CRS Sections 2 and 5.2 and Subsections.

• The following CDRLs are applicable to this task:

A002 DI-MGMT-81861A Integrated Master Schedule A003 DI-QCIC-81722 Quality Program Plan A004 DI-MGMT-81605 Briefing Materials A005 DI-MGMT-80227 Meeting Minutes A006 DI-MGMT-80227 Progress, Status, and Management Reporting A007 DI-MGMT-81466A Contractor Manpower Reporting A008 DI-MGMT-81809 Risk Management Status Report A009 DI-MGMT-80934C Operations Security Plan C004 DI-MISC-80711A Configuration Control Document H001 DI-SESS-81875 Configuration Management Plan H003 DI-SESS-80639D Engineering Change Proposal H004 DI-SESS-80643D Specification Change Notice H005 DI-SESS-80640D Request For Variance

viii) Cyber Security

Contractor shall perform all necessary Cyber Security tasks in accordance with the WSTARS/WMII base IDIQ CRS Section 5.4 and Subsections.

The following CDRL is applicable to this task:

I002 DI-MGMT-82001 DOD Risk Management Framework (RMF) Package Deliverables

ix) OTHER TASKS AND APPLICABLE CDRLs TO THIS TASK ORDER:

The Contractor shall perform other applicable tasks in accordance with the referenced WSTARS/WMII base IDIQ CRS Sections and Subsections:

i) Product Roadmap as defined in Section 1.1.a of the WSTARS/WMII base IDIQ CRS.

CDRL

Data Item

Description

(DID)

Description

F002 DI-MISC-80711A Product Roadmap

ii) WSOMS Coordination as defined in Section 1.1.b of the WSTARS/WMII base IDIQ

A004 DI-MGMT-81605 Briefing Materials A005 DI-MGMT-80227 Meeting Minutes

iii) Post Award Conference as defined in Section 1.2.5 of the WSTARS/WMII base IDIQ

A004 DI-MGMT-81605 Briefing Materials A005 DI-MGMT-80227 Meeting Minutes

iv) Technical Execution Plan as defined in Section 1.2.6 of the WSTARS/WMII base IDIQ

A001 DI-MGMT-80004A Task Execution Plan

v) Key Personnel as defined in Section 1.2.8 of the WSTARS/WMII base IDIQ CRS, in

Contractor format at the time of the Post Award Conference

vi) Contractor Manpower Reporting as defined in Section 1.2.9 of the WSTARS/WMII

A007 DI-MGMT-81466A Contractor Manpower Reporting

vii) Data Rights as defined in Section 1.2.13 of the WSTARS/WMII base IDIQ CRS.

B003 DI-MISC-80711A Government Data Rights

viii) International Traffic in Arms Regulations as defined in Section 1.2.14 of the

WSTARS/WMII base IDIQ CRS. The Contractor shall submit a copy of the Technical Assistance Agreement to the Government Contracting Officer prior to the export of applicable data, software, or material.

8. TRAVEL REQUIRED

Under this TO, the contractor will be required to travel to the Joint Satellite Engineering Center (JSEC)- Control Systems Laboratory in Aberdeen, MD, and the National Capital Region, to conduct any necessary investigations or technical coordination. All travel will be on a cost reimbursable basses. The Contractor is authorized travel expenses consistent with the provisions of the Joint Travel Regulation. All travel requires Government approval/authorization and notification to the Contracting Officer Representative.

The following CDRL is applicable to all travel under this TO:

A006 DI-MGMT-80227 Progress, Status, and Management Reporting

9. OTHER DIRECT COSTS (ODC)

ODCs, when approved by the Government and incurred by the Contractor in performance of tasks will be reimbursed by the Government. The Contractor shall obtain prior approval from the COR for micro purchases (< $3K) and the Contracting Officer approval for all purchases over the micro purchase level. Only actual costs for ODCs that are supported with detail sufficient for the Government to verify that costs are reasonable and in performance of tasks will be reimbursed.

10. COMPLETION/ACCEPTANCE CRITERIA

All deliverable data items under this task are subject to review and acceptance by the Government. Acceptance criteria will vary by product delivered and requirements specified in each individual CDRL.

Attachment 1: DIMS Synopsis

************************** NOT PROVIDED WITH THIS DRAFT TO 1 CRS***************************

File details come from the government source that posted it. Updated .