ATTACHMENT 0001

DRAFT STATEMENT OF WORK

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

26 DECEMBER 2015

TABLE OF CONTENTS:

C.1 SCOPE

C.2 APPLICABLE DOCUMENTS

C.3 REQUIREMENTS

C.4 TESTING

C.5 ECP PREPARATION

C.6 DELIVERABLES

C.7 SCHEDULE

C.8 ANTITERRORISM AND OPERATIONS SECURITY (AT/OPSEC)

C.9 CONTRACTOR MANPOWER REPORTING (CMR)

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

C.1 SCOPE

The purpose of this Statement of Work is to establish the requirements to replace the Cathode Ray Tube (CRT) in the Apache Integrated Helmet and Display System (IHADSS) Improved Helmet Display Unit (IHDU) with a high brightness, high resolution flat panel display. The IHDU uses a monochrome CRT that is currently only made by one supplier. As a result, to protect against obsolescence, the CRT will be replaced with a flat panel micro display. The requirement is to have at least the same performance as the current IHDU set forth in PS14-11877, no more weight and backward compatibility to allow the use of either an IHDU or the Flat Panel Helmet Display Unit

(FHDU).

C.2 APPLICABLE DOCUMENTS

PS 14-11877 Block III Production Procurement Specification for the Apache Longbow Improved Helmet and Display Sight System (IHADSS) for the 21st Century

MIL-STD-461E Requirements for the Control of Electromagnetic

Interference Characteristics of Subsystems and Equipment

ADS-37A-PRF Electromagnetic Environmental Effects (E3)

Performance Verifications Requirements

MIL-STD-810F Environmental Engineering Considerations and Laboratory Test

95750A-00/L Improved Helmet Display Unit

MIL-STD-704D Aircraft Electrical Power Characteristics

AH-64-100 Aircraft Interface Control Document for the (BOEING) Block III Apache Longbow Improved Helmet Display and Sight System for the 21st Century

(IHADSS-21)

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

C.3 REQUIREMENTS

3.1 The contractor shall take actions to implement a Flat Panel Display Unit (FHDU) which can replace the existing IHDU. The purpose is to correct potential obsolescence and sole/single source vendor problems by replacing the current CRT with a micro-display.

3.2 The FHDU shall comply with the current legacy IHADSS performance specifications (PS 14-11877). The FHDU shall interface to the existing Display Drive Unit (DDU). The DDU, with any changes required for the FHDU, shall remain backward compatible to the IHDU.

3.3 No later than two (2) months after award, the contractor shall host a System Requirements Review (SRR) where the design concept will be presented along with the contractor’s plan for meeting system requirements. The SRR agenda shall be provided to the COR no later than fifteen (15) days prior to the SRR, and the SRR minutes shall be provided to the COR no later than thirty (30) days after the SRR.Agenda and meeting minutes shall be provided in accordance with DI-ADMN-81249A (CDRL A001) and DI-

ADMN-81505 (CDRL A002).

3.4 No later than five (5) months after award, the contractor shall submit a plan for prototype development. This task may include creating drawings for mechanical and electronic components, digital video interface implementation, circuit design, firmware modification (DDU), identifying any changes required in the ISDU, firmware development (FHDU scan conversion), flat panel display procurement, IHDU optics module procurement, and procurement of other hardware required for integrating micro-displays into the FHDU. The conclusion of this task shall be documented by a Preliminary Design Review (PDR) in which the Contractor will brief how it will begin development of prototypes. The PDR will be at the Contractor’s facility. The PDR agenda shall be provided to the COR no later than fifteen (15) days prior to the PDR, and the PDR minutes shall be provided to the COR no later than thirty (30) days after the PDR. Agenda and meeting minutes shall be provided in accordance with DI-ADMN- 81249A (CDRL A001) and DI-ADMN-81505 (CDRL A002).

3.5 No later than ten (10) months after award, the contractor shall supply four (4) prototype units which will be demonstrated by the Contractor in the laboratory, aircraft mock-up, and aircraft as available. To the existent possible, changes to hardware should be confined to the DDU and IHDU. The image quality (brightness, dimness, contrast, dynamic range, and resolution) shall be evaluated in comparison to the current IHDU image quality set forth in PS 14-11877. A Critical Design Review (CDR) shall be conducted at the Contractor’s facility to confirm the design and implementation of the prototype FHDU and associated components (Note: The prototypes are for internal

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

testing only, and will not be Government assets). The CDR agenda shall be provide to the COR no later than fifteen (15) days prior to the CDR, and the CDR minutes shall be provided to the COR no later than thirty (30) days after the CDR. Agenda and meeting minutes shall be provided in accordance with DI-ADMN-81249A (CDRL A001) and DI-

ADMN-81505 (CDRL A002).

3.6 No later than sixteen (16) months after award, four (4) qualification representative and eight (8) flight worthy FHDUs shall be supplied for the purpose of qualification and flight testing. The units shall be comprised of the “lessons learned” from the prototype demonstration and evaluation. The FHDUs shall incorporate the appropriate micro-display and optics chain as necessary. Any modification to the DDU or Integrated Sight Display Unit/Enhanced Display Electronics Unit (ISDU/EDEU) shall be implemented as specified (any hardware changes will be tested at the same time as the FHDU as a system). A Test Readiness Review (TRR) shall be conducted prior to the start of testing to confirm readiness to test in accordance with the testing procedures listed in C.4. The TRR agenda shall be provide to the COR no later than fifteen (15) days prior to the TRR, and the TRR minutes shall be provided to the COR no later than thirty (30) days after the TRR. Agenda and meeting minutes shall be provided in accordance with DI-ADMN- 81249A (CDRL A001) and DI-ADMN-81505 (CDRL A002).

C.4 TESTING

4.1 The contractor shall notify the Government no later than 20 business days before the scheduled safety of flight (SOF) and full qualification test occurs.

4.2 Environmental and electro-magnetic interference (EMI) testing shall be conducted to qualify the FHDU, as follows:

4.2.1 The contractor shall conduct component level EMI testing in accordance with MIL-STD-461E and ADS-37A as applicable per Block III requirements.

1. EMI methods CE101, CE102, CS101, CS114, CS115, CS116, RE101, RE102, RS101 and RS103.

2. Electro Static Discharge (ESD) - Personnel

3. Electrical Power Test IAW MIL-STD-704D.

4. .

Results of these tests shall be provided to the COR in accordance with paragraph 4.4.

4.2.2 The Contractor shall conduct the following environmental qualification testing required for fielding of the FHDU. All tests will be IAW MIL-STD-810F, notice 3 in order to be consistent with Block III requirements. An aircraft level Safety of Flight

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

environmental test shall be performed in the event that full qualification can not be met prior to aircraft testing.

(1) SOF and full qualification testing required for re-qualification:

Full Temperature Altitude Test of 10 cycles

Functional Shock

Humidity

Non-Gunfire Vibration

Gunfire vibration

Rain

Salt Fog

Sand and Dust

Bench Handling

Fluid Contamination

Acceleration

Fungus

Explosive Atmosphere

Some or all of these requirements may be qualified by similarity or analysis. These analyses shall be included in the environmental test plan.

4.3 Prior to flight testing, a SOF EMC test will be conducted by the Government.

Flight testing will be performed at the Aviation Flight Test Directorate (AFTD), Huntsville, AL on an aircraft provided by the Government.

4.4 The contractor shall prepare Test Plans and Reports IAW with the following:

1. Environmental:

- Test Plan IAW DI-NDTI-80566A (CDRL A003).

- Test Procedure IAW DI-NDTI-80603A (CDRL A004).

- Environmental Test Report IAW DI-NDTI-80809B (CDRL A005).

2. EMI:

- Test Plan IAW DI-NDTI-80566 (CDRL A003).

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

- Test Procedure IAW DI-EMCS-80201C (CDRL A006).

- EMI Test Report IAW DI-EMCS-80200C (CDRL A007).

C.5 Engineering Change Proposal (ECP) PREPARATION

5.1 No later than forty-five (45) days after successful completion of qualification testing, the contractor shall prepare an ECP in accordance with MIL-HDBK-61A and DI- SESS-80639D (CDRL A009). The ECP shall include Notices of Revision (NORs) prepared in accordance with DI-SESS-80642D (CDRL A010) as necessary to describe changes to the TDP.

5.2 The ECP shall be submitted to the COR for review. A recommendation will be forwarded to the Apache Program Manager who has final approval authority.

5.3 Within 60 days following ECP approval, the contractor shall prepare and submit Engineering Change Orders (ECOs) in accordance with DI-SESS-80463D (CDRL A011) for release of new/revised data. The new/revised engineering documentation and the ECO shall be submitted to the COR. ARDEC-RI shall review, approve and return this data within 60 days to insure the changes have been implemented correctly.

5.4 The contractor shall provide the Government copies of all changed/affected drawings. These drawings will be used for establishing provisioning data only.

C.6 DELIVERABLES

The following items shall be delivered as part of the scope of this SOW.

1. SRR Agenda (A001)

2. SRR Presentation/Minutes (A002)

3. PDR Agenda (A001)

4. PDR Presentation/Minutes (A002)

5. CDR Agenda (A001)

6. CDR Presentation/Minutes (A002)

7. Test Plans (EMI/ENV) (A003)

8. Environmental Test Procedure (A004)

9. EMI Test Procedure (A006)

10. TRR Agenda (A001)

11. TRR Presentation/Minutes (A002)

12. SOF Environmental Test Report (A005)

13. SOF EMI Test Report (A007)

14. Final Environmental Qualification Test Report (A005)

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

15. Final EMI Qualification Test Report (A007)

16. Functional Configuration Audit (A008)

17. ECP/NORs (A009/A010)

18. Technical Data Package (A011)

Hardware items shall include the following:

1. Prototype Units (4)

2. Qualification Units (4)

3. Flight Worthy Units (8)

C.7 SCHEDULE

SRR (Paragraph C 3.3) 2 Months ARO PDR (Paragraph C 3.4) 5 Months ARO CDR (Paragraph C 3.5) 10 Months ARO TRR (Paragraph C 3.6) 16 Months ARO

SOF Reports 18 Months ARO Flight Testing 20 Months ARO Qualification Reports 24 Months ARO ECP Submittal 26 Months ARO Contract completion 28 Months ARO

C.8 ANTITERRORISM AND OPERATIONS SECURITY (AT/OPSEC)

C.9 CONTRACTOR MANPOWER REPORTING (CMR)

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report

ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://contractormanpower.army.pentagon.mil.

The required information includes:

(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;

2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Estimated direct labor hours (including sub-contractors);

INTEGRATED HELMET DISPLAY UNIT (IHDU) CATHODE RAY TUBE (CRT)

REPLACEMENT - APACHE HELMET

(6) Estimated direct labor dollars paid this reporting period (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Estimated data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

(12) Presence of deployment or contingency contract language; and

(13) Number of contractor, and sub-contractor employees deployed in theater this reporting period (by country).

As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website.

The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.