Attachment 0009 - Soto Cano Tech Exhibit - Rev1.xlsx
XLSX spreadsheet 880 KB Posted
- Attached to
- Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0001
About this file
This is a notice for the Logistics Civil Augmentation Program (LOGCAP) V solicitation. The U.S. Army Contracting Command-Rock Island intends to issue a Request for Proposal on or about November 6, 2017 for global logistical support services to the U.S. Military worldwide under solicitation number W52P1J-16-R-0001. The services include setting the theater, supply operations, transportation, engineering, base camp services, and other logistics and sustainment support. The Army will award a minimum of four and up to six Indefinite Delivery, Indefinite Quantity contracts for an initial five-year ordering period with options for five additional one-year ordering periods. A setting the theater requirement will be awarded for each Geographic Combatant Command as a task order for a base year plus nine option years. Current known requirements will be awarded as task orders at time of award for a base year plus four option years. The estimated maximum contract value is $82 billion over ten years.
0009
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data Pkg for A.1 and H.2
| UNCLASSIFIED | |||||||||||||
| Soto Cano | |||||||||||||
| GCC | Country | Task Order | Site Name | Site Code | CLIN | WBS Ref. | Service | Workload / H.2 | Activated | Workload Driver | Workload Descriptor | Workload Data Input | H.2 Data Input |
| 02.00 | Management and Planning | A.1 | |||||||||||
| 02.01 | Setting the Theater - Pre-Activation Planning | A.1 | |||||||||||
| 02.01.01 | Theater Analysis | A.1 | |||||||||||
| 02.01.02 | Develop Concept Of Support | A.1 | |||||||||||
| 02.01.03 | Exercise Support | A.1 | |||||||||||
| 02.01.03 | Exercise Support | Workload | |||||||||||
| 02.01.04 | Project Planning/Estimates (Phase 0) | A.1 | |||||||||||
| 02.02 | Management Support - Post Activation Planning | A.1 | |||||||||||
| 0009AA | 02.02.01 | Program Management Office | A.1 | X | |||||||||
| 02.02.01.01 | Project Planning | A.1 | |||||||||||
| 0009AA | 02.02.01.02 | Procurement and Supply Management | A.1 | X | |||||||||
| 02.02.02 | Contractor Support to Event Start | A.1 | |||||||||||
| SOUTHCOM | HND001 | 0009AA | 02.02.03 | Operational Support Office (OSO) | A.1 | X | |||||||
| 0009AA | 02.02.04 | Air Operations in Support of Contractors | A.1 | X | |||||||||
| 0009AA | 02.02.05 | Contractor Health Service Support | A.1 | X | |||||||||
| 02.02.06 | Non-military Individual Replacement Deployment Operations (N-m IRDOs) | A.1 | |||||||||||
| 03.00 | Engineering Services. | ||||||||||||
| 03.01 | Planning For Engineering Support. | ||||||||||||
| 03.01.01 | Power Generation and Distribution Planning | ||||||||||||
| 03.01.02 | Operational Energy (OE) Initiatives | ||||||||||||
| 03.01.03 | Water Support Planning | ||||||||||||
| 03.02 | Engineering | ||||||||||||
| 03.02.01 | Force Provider. | ||||||||||||
| 03.02.02 | Base Expeditionary Airfield Resources (BEAR). | ||||||||||||
| 03.02.03 | Utilities. | ||||||||||||
| 03.02.03.01 | Power Generation Equipment Engineering | ||||||||||||
| 03.02.03.02 | Water Production Engineering. | ||||||||||||
| 03.02.03.03 | Water Purification Engineering. | ||||||||||||
| 03.02.03.04 | Water Storage Engineering. | ||||||||||||
| 03.02.03.05 | Water Distribution Systems Engineering. | ||||||||||||
| 03.02.03.06 | Plumbing Engineering. | ||||||||||||
| 03.02.04 | Human Waste Management. | ||||||||||||
| 03.02.04.01 | Latrines Engineering . | ||||||||||||
| 03.02.04.02 | Sewage and Sanitation System Engineering. | ||||||||||||
| 03.02.05 | Infrastructure. | ||||||||||||
| 03.02.05.01 | Retail Fuel Storage and Issue. | ||||||||||||
| 03.02.05.02 | Bulk Fuel Storage. | ||||||||||||
| 03.02.05.03 | Petroleum Distribution Systems. | ||||||||||||
| 03.02.06 | Horizontal Construction. | ||||||||||||
| 03.02.06.01 | Site Preparation. | ||||||||||||
| 03.02.06.02 | Construct and Repair Roads, Railways, or Parking Lots. | ||||||||||||
| 03.02.06.03 | Drainage Systems. | ||||||||||||
| 03.02.06.04 | Runways, Taxiways, Parking Aprons, Helicopter Pads. | ||||||||||||
| 03.02.06.05 | Airfield Operational Support Areas (Horizontal). | ||||||||||||
| 03.02.07 | Force Protection Engineering. | ||||||||||||
| 03.02.07.01 | Ditches and Berms. | ||||||||||||
| 03.02.07.02 | Barriers. | ||||||||||||
| 03.02.07.03 | Protection, Security and Defense Structure. | ||||||||||||
| 03.02.07.04 | Guard Force Facilities. | ||||||||||||
| 03.02.08 | Vertical Construction. | ||||||||||||
| 03.02.08.01 | Life Support Areas and Billeting. | ||||||||||||
| 03.02.08.02 | Administrative Facilities. | ||||||||||||
| 03.02.08.03 | Food Service Facilities. | ||||||||||||
| 03.02.08.04 | Morale, Welfare, and Recreation (MWR) Facilities. | ||||||||||||
| 03.02.08.05 | Training Support Facilities. | ||||||||||||
| 03.02.08.06 | Fitness Facilities. | ||||||||||||
| 03.02.08.07 | Nonhazardous Material Storage. | ||||||||||||
| 03.02.08.08 | Hazardous Material Storage. | ||||||||||||
| 03.02.08.09 | Hazardous Waste Storage. | ||||||||||||
| 03.02.08.10 | Waste Management Facilities. | ||||||||||||
| 03.02.08.11 | Motor Pool and Maintenance Facilities. | ||||||||||||
| 03.02.08.12 | Emergency Services Facilities. | ||||||||||||
| 03.02.08.13 | Aviation Support Facilities. | ||||||||||||
| 03.02.08.14 | Navigation Aids, Airfield Systems, and Airfield Lighting. | ||||||||||||
| 03.02.08.15 | Airfield Berms, Revetments. | ||||||||||||
| 03.02.08.16 | Seaport Support Facilities. | ||||||||||||
| 03.02.09 | Soldier Support Facilities. | ||||||||||||
| 03.02.09.01 | Laundry Facilities. | ||||||||||||
| 03.02.09.02 | Chapel Facilities. | ||||||||||||
| 03.02.09.03 | Postal Facilities. | ||||||||||||
| 03.02.09.04 | Shower Facilities | ||||||||||||
| 03.02.10 | Other Construction | ||||||||||||
| 03.02.11 | Minor Construction including, Facility Repair, Refurbishment, Repurposing, and Improvements to Existing Structures | ||||||||||||
| 03.02.11.01 | Technical Inspections | ||||||||||||
| 03.02.11.02 | Facility Repair | ||||||||||||
| 04.00 | Base Camp Services | ||||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Billeting Population | 1400 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Number Bed/Bed Space | 1400 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Number of Billeting Offices | 1 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Avg billeting space issued per month | 30 | |||
| 04.02 | Utility Operations. | A.1 | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Split HVAC Units | 360 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Package HVAC Units | 98 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Window Units | 636 | |||
| 04.02.01 | Environmental Control | Workload | Swamp Chillers | ||||||||||
| 04.02.01 | Environmental Control | Workload | Unknown | ||||||||||
| 04.02.01 | Environmental Control | Workload | Heaters | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.02 | Power/Electricity | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.02 | Power/Electricity | Workload | X | GEN 1 to 400 Kw | 43 | |||
| 04.02.02 | Power/Electricity | Workload | GEN over 401 Kw | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.03 | Emergency Back up Power Generation | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.03 | Emergency Back up Power Generation | Workload | X | GEN 1 to 400 Kw | 43 | |||
| 04.02.03 | Emergency Back up Power Generation | Workload | GEN over 401 Kw | ||||||||||
| 04.03 | Water and Ice service | A.1 | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source Raw Water | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source Raw Water | Workload | X | Population | 1400 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source Raw Water | Workload | X | Avg Gallons Produced Per Day | 7000 | |||
| 04.03.01 | Source Raw Water | H.2 | Days of Supply | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source Raw Water | Workload | X | Number of Active Wells | 7 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.02 | Produce Bulk Potable Water | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.02 | Produce Bulk Potable Water | Workload | X | Population | 1400 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.02 | Produce Bulk Potable Water | H.2 | X | Days of Supply | 5 | |||
| 04.03.02 | Produce Bulk Potable Water | Workload | ROWPU / MMF | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.02 | Produce Bulk Potable Water | Workload | X | Distribution Point | 1 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.02 | Produce Bulk Potable Water | Workload | X | Avg Monthly Gallons Production | 560000 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.03 | Produce Bulk Non-Potable Water | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.03 | Produce Bulk Non-Potable Water | H.2 | X | Days of Supply | 5 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.03 | Produce Bulk Non-Potable Water | Workload | X | Avg Monthly Gallons Production | 630000 | |||
| 04.03.04 | Ice Services | A.1 | |||||||||||
| 04.03.04 | Ice Services | Workload | Population | ||||||||||
| 04.03.04 | Ice Services | Workload | Pounds Per Person Per Day | ||||||||||
| 04.03.04 | Ice Services | H.2 | Days Of Supply | ||||||||||
| 04.03.04 | Ice Services | Workload | Pounds for Other than Consumption | ||||||||||
| 04.03.04 | Ice Services | Workload | Avg Monthly Production | ||||||||||
| 04.03.04 | Ice Services | Workload | Avg Monthly Issued | ||||||||||
| 04.04 | Laundry and Textile Services | ||||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | A.1 | X | |||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Laundry Operations | Fee based laundry services; with the exception of organizational items, OCIE and linens | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Number of Bag Turn-ins per Month | 5600 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Bundle service - Items per bag | 20 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround Time One-Day Service | hours | 8 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround TimeTwo-Day Service | work days | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround Time Three-Day Piece Service | work days | 3 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Number of Pickup/Drop-off Points | 2 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Hours of Operation | hours per day | 10 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Transient Bags per Month | 500 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Avg Linens Turn-in per Month | lbs | 3600 |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | Workload | X | Pounds Per Bag | 35 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | Workload | X | Number of Turn-ins | bags per day | 80 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | H.2 | X | Turnaround Time (hrs) | hours | 24 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | Workload | X | Number of Pickup/Drop-off Points | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | H.2 | X | Hours of Operation | hours/day - 5 days/week | 10 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Number of Facilities | 11 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Wash Machines | 157 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Dryers | 186 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.04 | Textile Repair | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.04 | Textile Repair | Workload | X | Avg Pieces per month | 200 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | DFAC Quantity | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | DFAC Sq. Ft. | 16,299 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | DFAC Frequency of Cleanings | per week | 7 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Office Quantity | 118 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Office Sq. Ft. | 245335 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | per day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Latrine Quantity | 29 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Latrine Sq. Ft. | 19162 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | per day | 1 | |
| 04.05 | Custodial Services | Workload | Chemical Latrines | |||||||||
| 04.05 | Custodial Services | H.2 | Frequency of Cleanings | |||||||||
| 04.05 | Custodial Services | Workload | Handwash Stations | |||||||||
| 04.05 | Custodial Services | H.2 | Frequency of Cleanings | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower Quantity | 7 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower Sq. Ft. | 6788 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower/Latrine Combination Quantity | 5 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower/Latrine Combined Sq. Ft. | 3634 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | per day | 7 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | MWR Quantity | 41 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | MWR Sq. Ft. | 49189 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | per week | 7 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Industrial Quantity | 267 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Industrial Sq. Ft. | 438271 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Hospital | 4 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Hospital Sq. Ft. | 11104 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | per week | 7 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Site Population | 1,400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Site Avg Meals Served Monthly | 42,250 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Site Number of DFACs | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Meal Type | Regular and Short Order | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Seating Capacity | 250 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Breakfast Hours | hours | 3 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Breakfast Avg Meals Served per Month | 16,500 | ||
| 04.06 | Food Service Operations | H.2 | Brunch Hours | |||||||||
| 04.06 | Food Service Operations | workload | Brunch Avg Meals Served per Month | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Lunch Hours | hours | 1.5 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Lunch Avg Meals Served per Month | 12,000 | ||
| 04.06 | Food Service Operations | H.2 | Supper Hours | |||||||||
| 04.06 | Food Service Operations | workload | Supper Avg Meals Served per Month | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Dinner Hours | hours | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Dinner Avg Meals Served per Month | 13,500 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Midnight Meal Hours | hours | 1.5 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | workload | X | Midnight Meal Avg Meals Served per Month | 250 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Mermite Meals per Month | 500 | ||
| 04.06 | Food Service Operations | Workload | Soup and Sandwich | |||||||||
| 04.06 | Food Service Operations | Workload | Café' Grab n Go | |||||||||
| 04.07 | Provide Health Care Services (Medical, Dental, Veterinary) and Clinical Governance | A.1 | ||||||||||
| 04.07.01 | Manage and Operate Health Care Services and Facilities | A.1 | ||||||||||
| 04.07.01 | Manage and Operate Health Care Services and Facilities | Workload | Empaneled Patients | |||||||||
| 04.07.01 | Manage and Operate Health Care Services and Facilities | Workload | Patients per month | |||||||||
| 04.07.01 | Manage and Operate Health Care Services and Facilities | H.2 | Hours of Operation | |||||||||
| 04.07.01.01 | Role 1 Medical Facility | A.1 | ||||||||||
| 04.07.01.01 | Role 1 Medical Facility | Workload | Number of Facilities | |||||||||
| 04.07.01.01 | Role 1 Medical Facility | Workload | Empaneled Patients | |||||||||
| 04.07.01.01 | Role 1 Medical Facility | Workload | Patients per month | |||||||||
| 04.07.01.01 | Role 1 Medical Facility | H.2 | Hours of Operation | |||||||||
| 04.07.01.02 | Role 2 Medical Facility | A.1 | ||||||||||
| 04.07.01.02 | Role 2 Medical Facility | Workload | Number of Facilities | |||||||||
| 04.07.01.02 | Role 2 Medical Facility | Workload | Empaneled Patients | |||||||||
| 04.07.01.02 | Role 2 Medical Facility | Workload | Patients per month | |||||||||
| 04.07.01.02 | Role 2 Medical Facility | H.2 | Hours of Operation | |||||||||
| 04.07.01.03 | Dental Services Facility | A.1 | ||||||||||
| 04.07.01.03 | Dental Services Facility | Workload | Number of Facilities | |||||||||
| 04.07.01.03 | Dental Services Facility | Workload | Empaneled Patients | |||||||||
| 04.07.01.03 | Dental Services Facility | Workload | Patients per month | |||||||||
| 04.07.01.03 | Dental Services Facility | H.2 | Hours of Operation | |||||||||
| 04.07.01.04 | Optometry Services | A.1 | ||||||||||
| 04.07.01.04 | Optometry Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.04 | Optometry Services | Workload | Patients per month | |||||||||
| 04.07.01.04 | Optometry Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.05 | Combat Operational Stress Control and Behavioral Health | A.1 | ||||||||||
| 04.07.01.06 | Clinical Laboratory Services | A.1 | ||||||||||
| 04.07.01.06 | Clinical Laboratory Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.06 | Clinical Laboratory Services | Workload | Patients per month | |||||||||
| 04.07.01.06 | Clinical Laboratory Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.07 | Radiology Services | A.1 | ||||||||||
| 04.07.01.07 | Radiology Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.07 | Radiology Services | Workload | Patients per month | |||||||||
| 04.07.01.07 | Radiology Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.08 | Surgical Services | A.1 | ||||||||||
| 04.07.01.08 | Surgical Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.08 | Surgical Services | Workload | Patients per month | |||||||||
| 04.07.01.08 | Surgical Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.09 | Pharmacy Support | A.1 | ||||||||||
| 04.07.01.09 | Pharmacy Support | A.1 | Number of Facilities | |||||||||
| 04.07.01.09 | Pharmacy Support | A.1 | Customers per month | |||||||||
| 04.07.01.09 | Pharmacy Support | A.1 | Medical ASLs | |||||||||
| 04.07.01.09 | Pharmacy Support | H.2 | Hours of Operation | |||||||||
| 04.07.01.10 | Health Screening and Immunization Services | A.1 | ||||||||||
| 04.07.01.11 | Health Services Administration | A.1 | ||||||||||
| 04.07.01.12 | Occupational Health Services | A.1 | ||||||||||
| 04.07.01.12 | Occupational Health Services | A.1 | Number of Facilities | |||||||||
| 04.07.01.12 | Occupational Health Services | A.1 | Empaneled Patients | |||||||||
| 04.07.01.12 | Occupational Health Services | A.1 | Customers per month | |||||||||
| 04.07.01.12 | Occupational Health Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.13 | Hyperbaric Medicine Services | A.1 | ||||||||||
| 04.07.01.13 | Hyperbaric Medicine Services | A.1 | Number of Facilities | |||||||||
| 04.07.01.13 | Hyperbaric Medicine Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.13 | Hyperbaric Medicine Services | Workload | Customers per month | |||||||||
| 04.07.01.13 | Hyperbaric Medicine Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.14 | Health Service Support | A.1 | ||||||||||
| 04.07.01.15 | Telemedicine | A.1 | ||||||||||
| 04.07.01.15 | Telemedicine | Workload | Empaneled Patients | |||||||||
| 04.07.01.15 | Telemedicine | H.2 | Hours of Operation | |||||||||
| 04.07.01.16 | Medical Logistics | A.1 | ||||||||||
| 04.07.01.17 | Administrative Support Services | A.1 | ||||||||||
| 04.07.01.17 | Administrative Support Services | Workload | Number of Facilities | |||||||||
| 04.07.01.17 | Administrative Support Services | Workload | Empaneled Patients | |||||||||
| 04.07.01.17 | Administrative Support Services | H.2 | Hours of Operation | |||||||||
| 04.07.01.18 | Medical Recordkeeping and Referral Management | A.1 | ||||||||||
| 04.07.01.18 | Medical Recordkeeping and Referral Management | Workload | Number of Facilities | |||||||||
| 04.07.01.18 | Medical Recordkeeping and Referral Management | Workload | Empaneled Patients | |||||||||
| 04.07.01.18 | Medical Recordkeeping and Referral Management | H.2 | Hours of Operation | |||||||||
| 04.07.02 | Veterinary Services | A.1 | ||||||||||
| 04.07.02 | Veterinary Services | Workload | Number of Facilities serviced | |||||||||
| 04.07.02 | Veterinary Services | Workload | Number of Patients per Month | |||||||||
| 04.07.02 | Veterinary Services | H.2 | Hours of Operation | |||||||||
| 04.07.02.01 | Microchip Placement | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Facilities Supported | 698 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Avg Monthly Traps Set | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Avg Monthly pesticide applications | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Avg Rodenticide Used | lbs per month | 60 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Avg Herbicide Used | gallons per month | 60 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | workload | X | Avg Insecticide Used | gallons per month | 60 | |
| 04.09 | Waste Management Services | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Dumpster Density | 20 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | H.2 | X | Collected Frequency | per week | 6 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Avg of Waste Produced per Month in (M3) | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Incinerators | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Avg Waste Incinerated per Month | tons | 30 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Recycling Centers | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Recycling Dumpsters | collection points | 22 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | H.2 | X | Recycling Collected Frequency | per week | 5 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | workload | X | Total Recycled per Month (Tons) | tons | 15 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Number Collection Points for Pick-up | facilities | 12 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Liquid Waste (Gallons) | gallons | 30000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Solid Waste (Pounds) | lbs | 15000 | |
| 04.09.02 | Hazardous Waste Management | Workload | Battery Waste | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | 55 Gallon Drums | drums | 160 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 2 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 3 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 4 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 5 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 6 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 7 (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 8* (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 9* (kgs) | kgs | 125 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Oil/POL | gallons | 250 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Fuel | gallons | 225 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Antifreeze | gallons | 500 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Lead Acid (kgs) | kgs | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | NiCad (kgs) | kgs | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Lithium (kgs) | kgs | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Misc HAZMAT (kgs) | kgs | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.03 | Medical Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.03 | Medical Waste Management | Workload | X | Number Collection Points for Pick-up | 1 | ||
| 04.09.03 | Medical Waste Management | Workload | Avg of Waste Produced per Month in (cu.ft.) | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.03 | Medical Waste Management | Workload | X | Avg of Waste Produced per Month in (pounds) | lbs | 30000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.04 | Gray Water Management, Recycle and Reuse | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.04 | Gray Water Management, Recycle and Reuse | Workload | X | Gallons Produced per month | 225,000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Gallons Collected Monthly | 300,000 | ||
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Chemical Latrines | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Septic Tanks | 4 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Lifting /Pump Stations | pumps | 11 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Waste Water Treatment Facilities (WWTF) | 1 | ||
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Deep Pit Latrine | |||||||||
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Septic Vacuum Service Truck (SST) | |||||||||
| 04.10 | Community Services | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | A.1 | X | ||||
| 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | Number of Phone Banks | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | X | Number of Internet Café | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | H.2 | X | Hours of Operation | hours per day | 14 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | X | Avg Patrons per Month | 1400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Number of Community Centers | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Avg Patrons per Month | 400 | ||
| 04.10.02 | Community Centers | Workload | Distribution of Stars and Stripes Newspaper | |||||||||
| 04.10.02 | Community Centers | Workload | Distribution Points for Stars and Stripes Newspaper | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Theater/Movie Room | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | H.2 | X | Hours of Operation | hours per day | 14 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Number of Athletic / Exercise Centers | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | H.2 | X | Hours of Operation | hours per day | 14 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Avg Patrons per Month | 400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Cardio Rooms | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Crossfit Rooms | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Frequency of Activities | per month | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Track | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Volleyball Courts | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Basketball Courts | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Horseshoe Pits | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Multipurpose Fields | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Outside Pavilions | 8 | ||
| 04.11 | Camp Postal Operations | A.1 | ||||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Army Post Offices | |||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Satellite Army Post Offices | |||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Regional Distribution Centers | |||||||||
| 04.11 | Camp Postal Operations | H.2 | Hours of Operation | |||||||||
| 04.11 | Camp Postal Operations | Workload | Avg Pounds Processed Per Month | |||||||||
| 04.11 | Camp Postal Operations | Workload | Avg Postal Runs Per Month | |||||||||
| 04.12 | Fire and Emergency Services (F&ES). | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Number of Facilities | 698 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Monthly Preventive Inspections Performed | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Monthly Number of Fire Extinguishers Serviced | 1500 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Number of Smoke Detectors | 3000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Monthly Exercises | per month | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Education and Training | per month | 1 | |
| 04.12.02 | Fire Fighting Services | A.1 | ||||||||||
| 04.12.02 | Fire Fighting Services | Workload | Airfield Crash Fire and Rescue Vehicles | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Avg Airfield Crash Fire and Rescue Responses per Month | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Avg Airfield Crash Fire and Rescue Exercises per Month | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Number of Fire Fighting Vehicle | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Number of Fire Stations | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Coverage Area | |||||||||
| 04.12.02 | Fire Protection Services | Workload | Communications - Dispatches | |||||||||
| 04.12.03 | Ambulance Services | A.1 | ||||||||||
| 04.12.03 | Ambulance Services | Workload | Number of Emergency Vehicles | |||||||||
| 04.12.03 | Ambulance Services | Workload | Number of Ambulance Stations | |||||||||
| 04.12.03 | Ambulance Services | Workload | Coverage Area | |||||||||
| 04.13 | Security Services | A.1 | ||||||||||
| 04.13.01 | Badging Services and Biometric Support. | A.1 | ||||||||||
| 04.13.01 | Badging Services and Biometric Support. | Workload | ||||||||||
| 04.13.02 | Baggage and Postal Security Screening | A.1 | ||||||||||
| 04.13.02 | Baggage and Postal Security Screening | Workload | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | A.1 | X | ||||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Length of Roads | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Paved in Miles | 53 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Unpaved in Miles | 10 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Barriers (Total if unknown) | |||||||||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | HESCO barriers | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Jersey Barriers | 1000 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | T-Walls | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Acres of Grounds | 1920 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Perimeter Fencing (Linear Feet) | 89543 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Class I and Class II Fencing (Linear Feet) | 5115 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Snow Removal Vehicles | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Avg Sign Repair/Fabrication | 1500 | ||
| 04.15 | Range Management | A.1 | ||||||||||
| 04.15 | Range Management | Workload | Number of Ranges | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Emergency Service Requests | per month | 140 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Urgent Service Requests | per month | 420 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Routine Service Requests | per month | 500 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | H.2 | X | Hours of Operation | hours per day | 10 | |
| 04.16.01 | Facilities Equipment Training | |||||||||||
| 04.17 | Camp Logistics Support Functions | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | H.2 | X | Hours of Operations | hours per day | 16 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Number of Retail Points | 4 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Number of Fuel Trucks | 9 | ||
| 04.17.01 | Retail Energy Operations | Workload | FARP Hot Points | |||||||||
| 04.17.01 | Retail Energy Operations | Workload | FARP Cold Points | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Gallons Dispersed per Retail Point Monthly | 16,000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning. | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning. | Workload | X | Number of Wash Points | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning. | H.2 | X | Hours of Operations | hours per day | 8; 5 days a week | |
| 04.18 | Mortuary Affairs | A.1 | ||||||||||
| 04.18 | Mortuary Affairs | Workload | Remains process per Month | |||||||||
| 04.19 | Communication and Information Technology Support | A.1 | ||||||||||
| 04.19 | Communication and Information Technology Support | Workload | Number of Routine Service Requests | |||||||||
| 04.19 | Communication and Information Technology Support | Workload | Number of Urgent Service Requests | |||||||||
| 04.19 | Communication and Information Technology Support | Workload | Number of Emergency Service Requests | |||||||||
| 05.00 | Supply Management, Strategic and Operational | A.1 | ||||||||||
| 05.01 | Manage Supplies and Equipment, Operational and Tactical (Point of Service or Installation) | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | A.1 | X | ||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I Storage Facility | SSA | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I MROs | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I ASL / ATFL | # of lines | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I Pallets/Multipacks Processed | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII Storage Facility | SSA | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII MROs | Monthly | 3000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII ASL / ATFL | # of lines | 1000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII Pallets/Multipacks Processed; SSA incorporates CRSP operations | Monthly | 3000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | X | Hours of Operation | daily hrs/days per week | 8 / 5 | |
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) Storage Facility | SSA | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) MROs | Monthly | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class IX (Ground) ASL / ATFL | # of lines | Included in Class II, III(P), IV, VII ASL / ATFL | |
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) Pallets/Multipacks Processed | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) Storage Facility | SSA | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air)MROs | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) ASL / ATFL | # of lines | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) Pallets/Multipacks Processed | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X Storage Facility | SSA | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X MROs | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X ASL / ATFL | # of lines | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X Pallets/Multipacks Processed | Monthly | ||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation). | A.1 | ||||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | Workload | Centralized receiving and shipping points | Number of pallets processed Monthly | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | Workload | Theater Distribution Centers | Number of containers and vehicles throughput monthly | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | Workload | Convoy Support Centers (primarily for class IX repair parts) | Number of centers | ||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.03 | Forward Redistribution Point (FRP) | A.1 | ||||||||||
| 05.01.03 | Forward Redistribution Point (FRP) | Workload | Battle loss/Battle damage Replacement Operations | Number of containers and vehicles throughput monthly | ||||||||
| 05.01.03 | Forward Redistribution Point (FRP) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| 05.01.03 | Forward Redistribution Point (FRP) | Workload | Redistribution Property Assistance Team Yards | Number of Yards | ||||||||
| 05.01.03 | Forward Redistribution Point (FRP) | H.2 | Hours of Operation | daily hrs/days per week | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.02 | Property Book Office - Asset Management Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.02 | Property Book Office - Asset Management Services | Workload | X | Subsistence Supply Management Office (SSMO) | Number of Facilities | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.02 | Property Book Office - Asset Management Services | H.2 | X | Direct Labor Hours | hours per Month | 1408 | |
| 05.02 | Property Book Office - Asset Management Services | Workload | SSSC | Number of Facilities | ||||||||
| 05.02 | Property Book Office - Asset Management Services | Workload | SSSC Lines Managed | |||||||||
| 05.02 | Property Book Office - Asset Management Services | Workload | CIF | Number of Facilities | ||||||||
| 05.02 | Property Book Office - Asset Management Services | Workload | CIF Lines Managed | |||||||||
| 05.02 | Property Book Office - Asset Management Services | Workload | CIF Customers (Monthly) | Monthly | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | H.2 | X | Hours of Operation | Monday - Sunday (daily hrs) | 16 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | Workload | X | Number of Bulk Fuel Points | 5 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | Workload | X | Number of Bulk Fuel Issues Transactions Monthly | 15750 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | Workload | X | Number of Bulk Fuel Receipt Transactions Monthly | 16000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | Workload | X | Gallons Dispersed per Point Monthly | 8000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.03 | Class III Bulk Operations | Workload | X | Fuel Point Storage Capacity | 2257622 | ||
| 05.04 | Ammunition and Munition Operations | A.1 | ||||||||||
| 05.04 | Ammunition and Munition Operations | Workload | Number of Ammunition Supply Points | |||||||||
| 05.04 | Ammunition and Munition Operations | Workload | Number of Ammunition Issues/Receipt Transactions Monthly | |||||||||
| 05.04 | Ammunition and Munition Operations | Workload | Number of Ammunition Shipments Processes Monthly | |||||||||
| 05.04 | Ammunition and Munition Operations | Workload | Number of Munitions Storage Areas | |||||||||
| 05.04 | Ammunition and Munition Operations | Workload | Munition Storage Area Capacity | |||||||||
| 05.05 | Class VIII Medical Supply | A.1 | ||||||||||
| 05.05 | Class VIII Medical Supply | Workload | Number of Medical Supply Points | |||||||||
| 05.05 | Class VIII Medical Supply | Workload | Number of Medical Issues Monthly | |||||||||
| 05.05 | Class VIII Medical Supply | Workload | Number of Medical Receipts Monthly | |||||||||
| 06.00 | Maintenance Management | A.1 | ||||||||||
| 06.01 | Equipment and Material Maintenance (field level and below depot sustainment maintenance). | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Physical Fitness | equipment density | 159 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Reefer | equipment density | 79 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Power Generation | equipment density | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Tactical Vehicles | equipment density | 12 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Non-Tactical Vehicles | equipment density | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Environmental Control Units (ECUs) | equipment density | 1094 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Sensitive Items | equipment density | 150 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Communications Equipment | equipment density | 150 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Laundry Operations | equipment density | 166 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Avg Monthly Primary/Satellite Lift Stations | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Avg Monthly DFAC Equipment Services | 3 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Physical Fitness | equipment density | 159 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Reefer | equipment density | 79 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Power Generation | equipment density | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Tactical Vehicles | equipment density | 12 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Non-Tactical Vehicles | equipment density | 120 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Environmental Control Units (ECUs) | equipment density | 1094 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Sensitive Items | equipment density | 150 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Communications Equipment | equipment density | 150 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Laundry Operations | equipment density | 166 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Avg Monthly Primary/Satellite Lift Stations | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.01 | Preventive Maintenance Services | Workload | X | Avg Monthly DFAC Equipment Services | 3 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Non-Tactical Vehicles | 80 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Reefer | 79 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Fitness Equipment | 159 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Power Generation | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Tactical Vehicles | 12 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Environmental Control Units (ECUs) | 1094 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Sensitive Items | 150 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Communications Equipment | 150 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Laundry Operations | 166 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Avg Monthly Primary/Satellite Lift Stations | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | H.2 | X | Hours of Operation | hours per day | 10 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Non-Tactical Vehicles | 80 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Reefer | 79 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Fitness Equipment | 159 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Power Generation | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Tactical Vehicles | 12 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Environmental Control Units (ECUs) | 1094 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Sensitive Items | 150 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Communications Equipment | 150 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Laundry Operations | 166 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | Workload | X | Avg Monthly Primary/Satellite Lift Stations | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.01.02 | Fault Repair | H.2 | X | Hours of Operation | hours per day | 10 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BH | 06.01.03 | Recovery | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BH | 06.01.03 | Recovery | Workload | X | Number of Non-Tactical Recoveries per Month | per month | 5 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BH | 06.01.03 | Recovery | Workload | X | Number of Tactical Recoveries per Month | per month | 3 | |
| 06.01.04 | Oil Analysis | A.1 | ||||||||||
| 06.01.04 | Oil Analysis | Workload | Number of Samples tested weekly | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BH | 06.01.05 | Calibration | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BH | 06.01.05 | Calibration | Workload | X | Frequency of Calibrations | per month | 150 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.02 | Facility Maintenance | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.02 | Facility Maintenance | Workload | X | Facility Semi-permanent | 830 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 06.02 | Facility Maintenance | Workload | X | Facility sq. ft | 1367566 | ||
| 06.02 | Facility Maintenance | Workload | Facility - Tent | |||||||||
| 06.02 | Facility Maintenance | Workload | Facility sq. ft | |||||||||
| 06.02 | Facility Maintenance | Workload | Facility - RLB | |||||||||
| 06.02 | Facility Maintenance | Workload | Facility sq. ft |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .