SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-16-B-0005 X 2016JUL29
1 signed
/SIGNED/
2016AUG3012:00pm
DOA6
2016JUL29 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
BRANDON M. GARNICA
(309)782-3650
CCRC-AC
BRANDON.M.GARNICA.CIV@MAIL.MIL
1 57
X 1
X 4 X 6
X 10 X 12 X 20
X 26
X 28
X 31
X 46
X 47
X 54
X 57
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: BRANDON M. GARNICA
Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-3650
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The Army Contracting Command Rock Island (ACC-RI) is soliciting bids to procure the following metal shipping and storage containers used for 155mm Modular Artillery Charge System (MACS).
CLIN Nomenclature____ ____________ NSN___
0001 PA161 8140-01-490-2443
2. This Invitation for Bid (IFB) will be restricted in accordance with FAR 6.302-1(a)(2)(ii)(B) to the two incumbent small-business contractors who currently have the ability to manufacture this item and meet the U.S. Governments schedule: Conco Inc, and Delfasco, LLC.
3. NAICS code 332993 Ammunition (except small arms) manufacturing, 1,500 employees.
4. The planned Firm-Fixed Price (FFP) contract is a one-time buy for a total quantity of 60,660 each MACS PA161 containers, with First
Article Test (FAT) separately priced. All proposed prices shall be entered on the Pricing Lines contained in Section B of the solicitation. Prices entered anywhere other than Section B will not be considered. Please refer to section L for instructions on submitting your bid and Section M for an explanation of how the U.S. Government will evaluate the price factor for this IFB.
5. The contractor shall perform a FAT, as described in clauses 52.209-4512 and 52.209-3. FAT will be a separately priced CLIN in the contract award. FAT is due 150 days after award. Production deliveries shall begin 60 days after FAT approval.
6. The Technical Data Package (TDP) for the PA161 MACS Container (CLIN 0001) is Distribution F which is not approved for public release; distribution is restricted. The TDP for the PA161 MACS Container will be released to Conco, Inc. and Delfasco LLC. as approved by the Project Manager, Combat Ammunition Systems (PM CAS).
Businesses are required to be certified by the Department of Defense, United States/Canada Joint Certification Office. If offerors want to become certified in order to receive the TDPs for this IFB they must fill out a registration form at http://www.dlis.dla.mil/jcp. To obtain a TDP for this solicitation, the offeror must request explicit access at the link identified in clause 52.211-4502 of this IFB. Offeror must submit a copy of the certified registration from (DD form 2345), Military Critical
Technical Data Agreement. Restricted technical data will not be forwarded to a contractor who has not been certified.
7. Inspection/Acceptance Point is Origin and FOB Point is Destination. See Section F, Deliveries or Performance, for more details.
8. Early deliveries may be authorized, at no additional cost to the U.S. Government, subject to Procuring Contracting Officer (PCO) approval.
9. Bidders are advised to carefully read this entire solicitation, including Section L and Section M prior to submitting its bids for evaluation. The basis for evaluation has been clearly identified in the Section M narrative. Offerors are responsible for understanding all requirements of the IFB and should carefully read FAR 52.214-5 Submission of Bids, 52.214-7 Late Submissions, modifications and withdrawals of bids, 52.214-10 Contract Award Sealed Bid, and 52.214-12 Preparation of Bids. All bidders are responsible for ensuring that its bid contains all the information to be included per this IFB and will permit a complete and accurate evaluation of the bid.
The U.S. Government intends to award a contract resulting from this solicitation without discussions.
10. All contractors who provide goods/services to the Department of Defense (DoD) must be registered in the System for Award Management
(SAM). The internet site for registering in SAM is http://www.sam.gov. Failure to register in SAM will preclude an offeror from receiving a contract award resulting from this IFB.
11. All contractors must have current, accurate and complete Representations and Certifications at SAM prior to bid opening. Please refer to http://www.sam.gov.
12. Contractors must utilize the Wide Area Work Flow Receipt and Acceptance system in accordance with clause 252.232-7003 of this IFB.
This is the U.S. Governments electronic process for receipt and acceptance documents, as well as contractor payment.
13. Certified Cost and Pricing Data is not required to be submitted with an offerors bid. However, if an offerors proposed price cannot be determined fair and reasonable, the U.S. Government reserves the right to request Other Than Certified Cost and Pricing Data
2 57
W52P1J-16-B-0005
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in accordance with FAR 15.403-3.
14. Pursuant to FAR 9.103, contracts will only be awarded to bidders that the PCO determines to be responsible. The U.S. Government will conduct a pre-award survey to assist the PCO with determination of contractor responsibility. A Pre-Award survey will be required.
The Pre-Award Survey will be conducted by Defense Contract Management Agency (DCMA) as prescribed in FAR 9.106, Pre-Award Surveys.
15. Bidders must ensure that their bids are complete, including all fill-ins and blanks within the IFB. Failure to provide any information in accordance with this IFB may result in the offerors bid not being considered for award. Specifically, the following clauses which require fill in information to include, but are not limited to:
-Section B, CLIN 0001AA and 0001AB, prices
-52.247-4545, Place of Contract Shipping Points, Rail Information
-52.219-28, Post-Award Small Business Program Rerepresentation
-52.204-8, Annual Representations and Certifications
-52.219-2, Post-Award Small Business Program Rerepresentation
-252.211-7005, Substitutions for military or Federal Specifications and Standards
-252.204-7007, Alternate A, Annual Representations and Certifications
-252.217-7026, Identification of Sources of Supply
-252.211-7003, Item Unique Identification and Valuation
For any fill-ins that are not applicable, the bidder must acknowledge by indicating N/A.
16. The bid opening will take place at 12:00PM Standard Central Time on 30 August 2016. Therefore, bids shall be submitted electronically to donna.s.ponce.civ@mail.mil, brandon.m.garnica.civ@mail.mil and george.l.lingris.civ@mail.mil prior to bid opening.
It is the bidder's responsibility to confirm with the Contracting Officer and/or Contract Specialist that the bid submitted has, in fact, been received by the Contracting Officer and/or Contract Specialist. This must be done by the date/time set forth in the solicitation for receipt of bids.
17. The U.S. Government shall provide a teleconference number and passcode prior to bid opening. The U.S. Government plans to conduct a teleconference with all offerors during the bid opening. Offerors are encouraged to participate in the bid opening teleconference.
18. Bids shall be submitted electronically. Mailed, Hand-Delivered and Faxed bids will not be accepted. See page 54, Section L; bullet
4 for more information.
19. Bidders bids shall remain valid for 90 days from the closing date of the IFB.
20. The U.S. Government anticipates holding a post-award conference for the contract resulting from this solicitation. It is expected that the contractor will be responsible for hosting a post-award conference. Hosting is defined as securing meeting facilities for up to approximately 20 participants, and ensuring adequate presentation equipment is available.
21. This IFB should not be discussed with any U.S. Government employee except the Contracting Officer, Ms. Donna S. Ponce or her representatives, Mr. Brandon M Garnica and Mr. George R. Lingris. Potential bidders comments and/or questions should be directed in writing by email to Mr. Garnica, brandon.m.garnica.civ@mail.mil, Mr. Lingris, george.r.lingris.civ@mail.mil, and Ms. Ponce, Donna.s.ponce.civ@mail.mil. Please indicate the IFB number, W52P1J-16-B-0005, in the subject line of all email correspondence pertaining to this IFB. The U.S. Government intends to respond to all potential bidder comments and questions in writing via solicitation amendment(s). Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of any award resulting from this IFB.
*** END OF NARRATIVE A0001 ***
3 57
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PA161 MACS CONTAINER FAT
0001AA PA161 MACS CONTAINER FAT $ _________________________ __________________
SERVICE REQUESTED: PA161 MACS CONTAINER FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Due 150 days after award. The U.S. Government has 30 days to provide approval/disapproval. Production delivieries shall begin 60 days after FAT approval.
(End of narrative F001)
0001AB PA161 MAC CONTAINER 60660 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: PA161 MAC CONTAINER
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: T16P05KIHH PRON AMD: 02
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52P1J6088M800 Y00000 M 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 9,900 31-MAY-2017
002 9,900 30-JUN-2017
003 9,900 31-JUL-2017
004 9,900 31-AUG-2017
4 57
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
005 9,900 29-SEP-2017
006 9,900 31-OCT-2017
007 1,260 30-NOV-2017
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Shipping instructions:
The shipping destination is unknown at this time. However, the destination will be either American Ordnance in Middletown, IA or General Dynamics Ordnance and Tactical
Systems in Camden, AR.
(End of narrative F001)
5 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.210-4501 DRAWINGS/SPECIFICATIONS APR/2012
(ACC-RI)
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing 12972583, with revisions in effect as of
04/01/2016, are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled "Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
(End of statement of work)
(CS6100)
C-2 52.211-4502 TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION NOV/2012
(ACC-RI) OF RESTRICTED TECHNICAL DATA
(a) Army Contracting Command - Rock Island (ACC-RI) will no longer make Technical Data Packages (TDPs) available for order via CD-ROMS.
TDPs will be obtained electronically via the link(s) below which will direct you to the Federal Business Opportunities (FBO) website.
You must have an FBO account prior to accessing any TDP(s). To register for an account in FBO, please visit http://www.fbo.gov/index and click on Register Now under Vendors/Citizens. The toll free FBO helpdesk phone number is (866) 606-8220 and for international (334) 206-
7828. Vendors are responsible for placing correct information in FBO.
(b) You may need to use special software to view the documents that we post to the FBO. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require Lucent Viewer to view the
TDP(s) which is available as freeware at: http://www.ec-edi.com/.
(c) The TDP(s) for this solicitation will be accessible via the FBO website (as described below) from the date of issue through the time specified in the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDPs:
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the FBO website. The URL will take you to that
CLINs web-located TDP. You must have an FBO account prior accessing the TDP.
(2) To access the TDP(s), click directly on the link provided below to be directed to the TDP. You may also copy and paste the link into your browser and hit the Enter key. You will be prompted for your FBO username and password prior to gaining access to the TDP.
CLIN: N/A
TDP Link (URL): N/A
(e) FOR RESTRICTED TDPs:
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs and any other related documents are posted with various options, such as
Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDPs
Technical Data Packages that have been marked as 'Restricted' can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs that have been marked as 'Restricted' will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab and then click on the request explicit access button. Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from FBO
6 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
stating you have been granted permission for viewing or downloading the TDP items.
(2) Access to EXPORT CONTROL TDPs
(i) TDPs that have been marked as 'Export Control' can be accessed electronically via the FBO website, with valid contractor login credentials. In addition, to obtain access to these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical
Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily
Critical Technical Data Agreement on file with DLIS then you will not be able to access the TDP. To obtain certification, go to http://www.logisticsinformationservice.dla.mil/jcp/, click on documents and follow instructions provided. Processing time is estimated at five working days after receipt.
(ii) TDPs that have been marked as Export Control will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab, enter your
Marketing Partner Identification Number (MPIN) and click on the request explicit access button. The requestor must be the "data custodian" that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes the user will be required to verify the MPIN again to gain access to Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(iii) If multiple individuals in your company need access to the Export Control TDP for a solicitation, it can be obtained from your data custodian that is listed on the DD 2345.
(iv) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
CLIN: 0001AB
TDP Link (URL): https://www.fbo.gov/notices/35e5463afada4994cd3a2dd236eee70d
(3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in FBO should be directed to http://www.fbo.gov/index. The FBO helpdesk phone number is (866)
606-8820. Vendors are responsible for placing correct information in FBO. A user guide for FBO can be found at http://www.fbo.gov/index - on the right of the screen is User Guides - click on Vendor.
(End of clause)
(CS6102)
C-3 52.246-4536 STATEMENT OF WORK - 2-D BAR CODING VERIFICATION DEC/2010
(ACC-RI)
(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D
Bar Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.
(b) An approval of the supplier's 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative.
Prior to formal submission of product to the Government for acceptance, a first time sample of the supplier's initial 2-D Bar
Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US Army Joint Munitions Command, 1 Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar Code Verification system.
(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.
7 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.
(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D Bar Code labeling that is affixed to the supplier's product.
(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.
(End of statement of work)
(CS7300)
C-4 52.246-4562 PHOSPHATE COATING REQUIREMENT (LIGHT) OCT/2005
(ACC-RI)
The following requirements regarding phosphate coating are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification TT-C-490.
(a) Paragraph 3.2.1 of TT-C-490 refers to "Procedure approval." The written procedure, along with the panel submission requirements of paragraph 3.2.2, shall be sent to the designated contracting officer. The procedure shall include product names and manufacturers of all chemicals/materials to be used. All processes, equipment, and controls, along with the testing and test frequencies used for phosphating including the application of supplemental finishes.
(b) Paragraph 3.2.2 of TT-C-490 refers to "Preproduction validation panels." For parts requiring epoxy primer and urethane/epoxy topcoat finishes (CARC paint system), the preproduction panels shall include three phosphated only, three panels with phosphate and epoxy primer and three panels with phosphate, primer and topcoat. For parts requiring topcoat only
(ammunition items), the preproduction panels shall include three phosphated only and three panels with phosphate and paint.
(End of clause)
(CS7500)
C-5 52.248-4502 CONFIGURATION MANAGEMENT DOCUMENTATION AUG/2015
(ACC-RI)
(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
8 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(End of clause)
9 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.211-4508 PACKAGING REQUIREMENTS JUL/1997
(ACC-RI)
(a) Packaging shall be in accordance with MIL-C-70478 revision D, dated 06 Sep 2000.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with MIL-C-70478, Revision D, dated 06 Sep 2000.
EXCEPTION: DI-PACK-81059 does apply to this contract.
Performance Oriented Packaging: Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance
Oriented Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. The POP test report shall be generated by the Manufacturer/Laboratory following the test. The report must be kept on file by the contractor and submitted as required by the
Contract Data Requirement List. (DI-PACK-81059) For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: (a) the initial POP test report expires before the end of the contract or (b) there is a change in container manufacturer or design of the exteriors shipping container. No re-test is needed if all packaging is purchased while under an expired POP test.
EXCEPTION TO POP MARKINGS: If the container is manufactured outside the
USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer
(outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
PERFORMANCE ORIENTED PACKAGING (POP) VERIFICATION: In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.
(End of clause)
(DS6303)
D-2 52.247-4521 COMMERCIAL UNITIZATION/PALLETIZATION MAY/2015
(ACC-RI)
(a) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of
50 cubic feet or more, unless skids or other forklift handling features are included in the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease in stacking.
(b) A palletized load shall not exceed 4,000 pounds and should not exceed 52 inches in length or width, or 54 inches in height.
When the item being palletized is ammunition/explosive, at least one of the horizontal dimensions must be less than 47 inches.
When level A packaging is required, a four-way entry pallet or pallet box, shall be used. All pallet loads shall contain the load in a manner that will permit safe, multiple rehandling during storage and shipment.
10 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) The containers shall not be stacked more than six high therefore the maximum quantity of containers per pallet is thirty six (36) in a six wide by six high configuration. The Air Test Screws, 9344039, shall be shipped bulk, uninstalled from the containers. For each pallet it is acceptable to place one bag/envelope of 36 each air test screw assemblies (consisting of Screw-9344039, Washer-9331690 and
Retainer Washer-9331693) into the upper right container on the pallet. A plastic plug shall be inserted into the air test hole on the container prior to shipment.
(End of clause)
(DS7203)
11 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 or equivalent; only design/development exclusions permitted
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-4 52.209-4512 FIRST ARTICLE TEST (CONTRACTOR TESTING) NOV/2011
(ACC-RI)
(a) The first article shall be, IAW DTL12961080B w/amendment 1, Table II. First Article, which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions (QAPS) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
12 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests
(including supplier's and Vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representative's (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the contractor's test report.
Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting
Officer to the Contracting Officer with an additional information copy furnished to AMSJM-QAP.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the
Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
(End of clause)
(ES6031)
E-5 52.246-4017 PROCESS CAPABILITY, CONTROL AND IMPROVEMENT REQUIREMENTS MAY/2011
(ACC-RI)
(a) The Contractor shall establish a Process Control System that Includes, but is not limited to, procedures, systems and software.
This Process Control System shall complement the requirements of an ISO 9001-2008 or equivalent Quality Management System as well as all contract quality requirements. Statistical Process Control (SPC), when utilized, shall be implemented in accordance with ISO 11462-1 and ANSI/ASQC B1, B2, and B3 or equivalent. A Process Control Plan (PCP), which describes actions and methods to assure production processes will be in a state of control, shall be submitted to the Government for review and acceptance as stipulated on DD Form 1423 and DI-MGMT-80004. Demonstration of process capability in accordance with the accepted PCP shall be accomplished prior to or at first article (if required) or prior to start of production. Acceptance of product shall be contingent on verification of acceptable process capability in accordance with the accepted PCP, provided all other contractual requirements are met. The Government reserves the right to withhold acceptance of product when there is evidence of noncompliance to the PCP. Should a finding of noncompliance to the PCP be made, a corrective action plan shall be submitted to the Government.
(b) Characteristics for process control are as follows:
[ ] (1) Characteristics for process control are attributes or features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation.
Characteristics for process control result from an in depth Government-only review and analysis as specified in Technical Data Package
(TDP) documentation as required below:
[X] (1.1) Government selected list, see paragraph g below
[ ] (1.2) As listed key characteristics
[ ] (2) Characteristics for process control are attributes or features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation.
Characteristics for process control shall be determined using an in-depth Contractor review and analysis as specified in the PCP documentation. The Government reserves the right to identify any characteristics for process control as well as any additional characteristics identified in paragraph g.
[ ] (3) Characteristics for process control are features within a product, subassembly, part and process whose variation from nominal (i.e., target value) significantly impacts safety, performance in terms of customers requirements, or final cost of a product.
Special controls should be applied where the cost of variation justifies the cost of control. These shall be developed from an in depth
13 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Government-Contractor review and analysis of design as specified in paragraph g below.
(c) The Contractors analysis shall include processes and operations under the control of the prime Contractor and those under the control of sub-Contractor including subtier suppliers. The Contractor shall create a process flow chart for the entire process
(including manufacturing, inspection and material handling) and perform Process Failure Modes and Effects Analysis (PFMEA) for all processes identified on the process flow chart [If option b(3) is selected, a PFMEA and process flow chart will not be necessary]. The
Contractor shall identify, define and document specific controls applicable for each process and operation that affects all characteristics required for control by this clause. The Contractor shall: (a) conduct process capability studies on all process and operation parameters affecting characteristics for process control; (b) verify that all automated inspection equipment used to validate process capability has been properly calibrated and certified; and (c) conduct Measurement System Analysis (MSA) studies on all applicable corresponding measurement systems utilized to monitor process capability.
(d) The Contractor shall prepare and implement a PCP. The PCP shall be based upon and include the process flow chart, PFMEA [If option b(3) is selected, a PFMEA and process flow chart will not be necessary], process capability studies and Measurement System Analysis
(MSA)for all process and operation parameters affecting characteristics for process control. For each characteristic, the PCP shall describe the entire process (including manufacturing, inspection and material handling), control methods and action plans for all out of control conditions and process capability at the stated production rates. When utilizing statistical methods, a process capability index such as Cpk shall be calculated. A characteristic for process control shall be considered to have an acceptable (and capable) process if it has a Cpk of at least 2.00 for Critical characteristics, 1.33 for all other characteristics selected for control, or as stated as follows: N/A. The Contractor shall notify the Government when the minimum process capability values (Cpk) of 2.00 for
Critical characteristics and 1.33 for all other characteristics for process control, or the alternative established minimum Cpk values, are no longer being maintained.
(e) In accordance with MIL-STD-1916 the Contractor may request, in writing, that alternate methods of acceptance be evaluated once the processes and applicable operation parameters have been demonstrated to be both stable and capable. Any alternate methods may not be implemented until accepted by the Contracting Officer.
(f) Corrective Action Requests (CARs) and Requests For Deviations (RFDs) generated for identification of product nonconformances shall result in an evaluation of the Process Control Plan (PCP). The evaluation will consider addition of new characteristics for process control to the contractually required process control list and require implementation of actions per paragraphs (c) and (d) above with submittal to the PCO for Government acceptance. If the CARs and RFDs are related to characteristics, processes and/or operations already identified in the PCP then those actions required by paragraphs (c) and (d) will be reassessed and submitted to the PCO for
Government acceptance. The Government reserves the right to withhold acceptance of product until the revised PCP is accepted by the
Government.
(g) If box b(1)[1.1], b(2) or b(3) are checked above, the selected characteristics and applicable tools, techniques, control methods or method of analysis to obtain these are specified as follows:
Key Characteristics:
Specification Part Part CD Requirement Description Dimension Rational
Paragraph Number Name
4.4.2.8 12910349 Gasket 103 Large Width .38 +.00/-.03 Ensure proper
[.35 to .38] dimensions of
104 Middle Width .15 +.00/-.02 gasket. Essential
[.13 to .15] to container
105 Height of Rectangular .275 +.000/- seal.
Section .020
[.255 to .275
4.4.2.11 12960796 Cover 102 Distance from top of .725 +/- .020 Ensure proper or assembly shaft (closed position) [.705 to .745] height of shaft
12989958 prior to inside surface of the to gasket painting gasket retainer section 2x places surface; tight of cover (.725 +/-.020) tolerance for
(two places) multiple part assembly.
Essential to
Container seal.
4.4.2.18 12961079 Body 102 .885 Location of bayonet .885 +/- .010 Ensure proper
Weldment slot of rim with respect [.875 to .895] height of bayonet
(Body to edge of body (four slot to sealing
Assembly), places) 4x places edge tight prior to tolerance for painting multiple part assembly.
14 57
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Essential to container seal.
(End of Clause)
(ES6924)
E-6 52.246-4018 MEASUREMENT SYSTEM EVALUATION (MSE) APR/2014
(ACC-RI)
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of the clause and in the accompanying Contract Data
Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic
Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This clause establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this clause establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see
(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .