MIL-C-71178_M922A1_CTG.pdf
Military Specification PDF 635 KB Posted
- Solicitation number
- W52P1J15R0144
About this file
MIL-C-71178 M922A1 CTG
View the file
Who attaches MIL-C-71178
Other files
| File | Type | Posted |
|---|---|---|
| 9362530.pdf | ||
| 8796522.pdf | ||
| 7553347_Wirebound_Box.pdf | ||
| 9362533_Rev_C_Cushion.pdf | ||
| 9362531.pdf | ||
| 7553296N_Box_M2A1.pdf | ||
| 9325874.pdf | ||
| 1948-4116_rev_12.pdf | ||
| 9362532_Rev_C_Cushion_Support.pdf | ||
| 1948-4116_Appendix_26R.PDF | ||
| 7553296_M2A1_assembly.pdf | ||
| 12937903_M922A1_CTG.pdf | ||
| 11691393_Link_M16A2.pdf | ||
| 12937904_Linking_of_M922A1_CTGS.pdf | ||
| 12937905_M922A1_COAI.pdf | ||
| Section_C_Exceptions_-_M922A1_Dummy_Ctg.pdf | ||
| MIL-C-48069_AP.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1===1 MIL-c-71178 (AR)
10 June 1993
MILITARY SPECIFICATION
CARTRIDGE, 40mm, HIGH VELOCITY, DUMMY, M922A1
METAL PART FOR
This specification is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense.
1. SCOPE
1.1 Scope. This specification covers the requirements, examinations and tests for the metal part for one type of cartridge designated as Cartridge, 40mm Dummy, M922A1 (see 6.1) .
2. APPLICABLE DOCUMENTS
2.1 Government documents.
2.1.1 Specifications, standards, and handbooks. The
followin~ specifications, standards, and handbooks form a part of this doc≠t to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2).
SPECIFICATIONS
MILITARY
MIL-A-48078 - Arrununition,Standard Quality Assurance Provisions, General Specification for
Beneficialcomments(recommendations,additions,deletions)and any pertinentdatawhichmay be of use in improvingthisdocument,shouldbe addressedto: Commander,U.S. Army ARDEC,ATTN: SMCAR-BAC-S,Picatinny Arsenal,New Jersey07806-5000by usingthe StandardizationDocument ImprovementProposal(DDForm 1426)appearingat the end of this document or by letter.
AMSC N/A FSC 1310
DISTRIBUTION STATEMENT A. Approvedforpublicrel~,distributionisurdimiced.
Source: https://assist.dla.mil -- Downloaded: 2014-09-08T15:07Z Check the source to verify that this is the current version before use.
MIL-C-71178 (AR)
STANDARDS
MILITARY
MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-1169 - Packaging, Packing and Marking for
Shipment of Inert Ammunition Components
(Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the DODSSP - Customer Service, Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094.)
2.1.2 Other Government documents, drawinqs, and Dupli-
cations. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation.
DRAWINGS (see 6.6) us ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING
CENTER (ARDEC)
PRODUCT DRAWINGS
12937903 - DurrunyCartridge, 40mm, M922A1 12937904 - Linking of Dummy Cartridges, 40mm, M922A1
INSPECTION EQUIPMENT DRAWINGS
9202253 - Chamber Gage 9202254 - Limit 9202255 - Alignment
(Copies of other Government documents, drawings, and publica~ions required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.)
2.2 Order of precedence. In the event of a conflict
between the text of this doctient and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Material. Materials shall be in accordance with the
applicable drawings and specifications.
3.2 Cartridae. The cartridge shall comply with all
requirements specified on Drawing (Dwg.) 12937903, all associated drawings, and with all requirements in applicable specifications.
3.3 First article. When specified in the contract or
purchase order (see 6.2), a sample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4.3).
3.4 Workmanship. All parts and assemblies shall be
fabricated, loaded and assembled in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust, and other foreign matter. The cleaning method used shall not be injurious to any parts, nor shall the parts be contaminated by the cleaning agents. Exterior surface coatings shall be continuous; however, a few light scratches that do not expose base material may be permitted. All required marking and stamping shall be neat and sharply defined. Total surface imper-fections for nicks, dents, and scratches shall not exceed 2.5% of the surface area of the part. Wy individual indentation shall not exceed .010 depth.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise
specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements.
4.1.1 Resnonsibilitv for conmliance. All items shall meet
all requirements of Sections 3 and 5. The inspection set forth in this specification shall become a part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.
4.1.2 General provisions. Unless otherwise specified
herein, the provisions of MIL-A-48078 apply and form a part of this specification. Reference shall be made to MIL-STD-109 to define quality assurance terms used herein.
4.2 Classification of inspections. The inspection
requirements specified herein are classified as follows:
a. First article inspection (see 4.3).
b. Quality conformance inspection (see 4.4).
4.3 First article ins~ection.
4.3.1 Submission. The contractor shall submit a first
article sample as designated by the”Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the assemblies, components and test specimens listed below in the quantities indicated.
Name Drawinq Quantity
Dummy Cartridge 12937903 25
4.3.2 Inspections to be performed. As determined by the
Government, the first article assemblies, components and test specimens may be subjected to any or all of the examinations and tests specified in this detail specification (see Table II) and be inspected for compliance with any or all requirements of the applicable drawings.
4.3.3 Rejection. If any assembly, component or test
specimen fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate inspection upon any assembly, component or test specimen to comply with requirements.
failure of an any of the
4.4 Quality conformance inspection.
4.4.1 Inspection lot formation. Inspection lots shall
comply with the lot formation provisions of MIL-A-48078.
4.4.2 Examinations and tests.
a. Classification of characteristics. Quality conformance examinations and tests are specified in the following Classification of Characteristics paragraphs. The contractor’s quality program or detailed inspection system shall provide assurance of compliance of all characteristics with the applicable drawing and specification requirements utilizing as a minimum the conformance criteria specified. When cited herein, attributes sampling inspection shall be conducted in accordance with Table I below, using the inspection levels stated in the Classification of Characteristics paragraphs.
TABLE I. Attributes samplina inspection.
Inspection Levels
Lot Size ~ IV V——
2t08 * * 5 9 to 15 * 13 5
16 to 25 13 5 26 to 50 3; 13 5 51 to 90 32 13 13 91 to 150 32 13 13
151 to 280 32 32 20 281 to 500 32 32 20 501 to 1200 80 50 20
1201 to 3200 80 50 32 3201 to 10000 125 50 32
10001 to 35000 125 80 50 35001 to 150000 125 80 50
150001 to 500000 200 125 50 500001 and over 200 125 50
NOTE : Numbers under inspection levels indicate sample size; asterisks (*) indicate one hundred percent inspection. If sample size exceeds lot size, perform one hundred percent inspection.
Accept on zero and reject on one or more for all inspection levels.
b. Alternative aualitv conformance provisions.
Unless otherwise specified herein or provided for in the con-tract, alternative quality conformance procedures, methods or equipment, such as statistical process control, tool control, other types of sampling plans, etc., may be used by the con-tractor when they provide, as a minimum, the level of quality assurance required by the provisions herein. Prior to applying such alternative procedures, methods or equipment, the contractor shall describe them in a written proposal submitted to the Government for evaluation (see 6.8). When required, the contractor shall demonstrate that the effectiveness of each proposed alternative is equal to or better than the specified quality conformance provisions(s) herein. In case of dispute as to whether the contractor’s proposed alternative(s) provides equivalent assurance, the provisions of this specification shall apply. All approved alternative provisions shall be specifically incorporated into the contractor’s quality program or inspection system, as applicable.
a) ‘.
mm mm
7Source: https://assist.dla.mil -- Downloaded: 2014-09-08T15:07Z d + v-l 1 a)v+a) S3Q
H HH
H HH+> >
H HHHH H +
Oal
JJ>
a)
a) b) a tn
MI (T3--
Ua)oa)
. . . . . . Ig~ t-n emwb co t-l o I
0000 0 i-i o d t-lrlrlrl $-i S(N
4.4.3 Chamber aaqe. Each cartridge shall be subjected to
this test. If any cartridge fails to comply with the requirement specified on the applicable drawing, it shall be classified defective and removed from the lot.
4.4.4 Inspection eauiDment. The inspection equipment
required to perform the inspections specified herein is identified in the “Inspection Method Referencem column of the Classification of Characteristics listings starting with 4.4.2.1.
Contractor inspection equipment designs shall be submitted for Government approval as specified in the contract. Designs which provide variable measurements instead of attributes data are preferred in order to facilitate the use of statistical process control. See MIL-A-48078 and 6.3 herein.
4.5 Methods of inspection.
4.5.1 Chamber qaae. The cartridge shall be placed in the
chamber gage specified on the equipment list and must meet the requirement specified on the applicable drawing. This test is a non-destructive test. Parts tested may be returned to the lot.
4.5.2 Position of oqive dots. A link shall be placed on
the cartridge in accordance with the procedure Notes 1 and 2 (Figures 1 and 2) on Dwg. 12937904. The ogive dot shall be visually inspected for alignment with male and female ends of the link. If the dots are between the wrong 2 ogive grooves the representative quantity shall be rejected. This test is a non-destructive test. Parts tested may be returned to the lot. (A link without a coupling may be used for this test.)
5. PACKAGING
5.1 Preservation and packaainq.
5.1.1 Level B. Preservation and packaging of the linked
cartridges shall be in accordance with MIL-sTD-1169..
5.2 Packinq.
5.2.1 Level B. The cartridges shall be packed in
accordance with MIL-sTD-1169.
5.3 Markinq. Marking shall be in accordance with MIL-STD-
1169. .
5.4 Shiwinq. When components from more than one lot are
shipped as a carload, each lot shall be kept separate, and the division between lots clearly indicated to prevent mixing of the lots in transit.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Intended use. This specification covers the metal part
for Cartridge, 40mm, Dummy M922A1.
6.2 Acquisition requirements. Acquisition documents must
specify the following:
a. Title, number and date of this specification.
b. Issue of DODISS to be cited in the solicitation, and, if required, the specific issue of individual documents referenced (see 2.1.1).
c. Requirements for submission of first article sample.
d. Applicable stock number.
e. Packaging requirements, if other than specified in Section 5.
f. Serialization requirements, if applicable.
6.3 Submission of contractor inspection euuipment desiqns
for approval. Submit copies of designs as required to:
Commander, U.S. Army ARDEC, ATTN: SMCAR-QAF-1, Picatinny Arsenal, NJ 07806-5000. This address will be specified on the Contract Data Requirements List, DD Form 1423 in the contract.
6.4 Submission of results of contractor - conducted
examinations and tests. Unless otherwise specified by the Contracting Officer, the contractor shall forward requested records of examinations or tests to Commander, ARDEC, ATTN:
SMCAR-QAF-S, E’icatinnyArsenal, NJ 07806-5000.
6>5 Submission of test data. In addition to the normal distribution of records, when the cartridges are procured by AMCCOM, one (1) COPY each,of all ammunition data cards shall be forwarded to: Commander, ARDEC, ATTN: SMCAR-CCL-CF and SMCAR- QAF-S, Picatinny Arsenal, NJ 07806-5000.
6.6 Drawinqs. Drawings listed in Section 2 of this speci-
fication under the heading U.S. Army Armament, Research, Develop-ment and Engineering Center (ARDEC) may also include drawings prepared by, and identified as U.S. Army Armament, Research’ and Development Command (ARRADCOM), Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. Technical data originally prepared by these activities is now under cognizance of ARDEC.
6.7 Subiect term (kev word) listina.
M16A2 Metallic Link MK19 Mod 3 Grenade Machine Gun
6.8 Submission of alternative uualitv conformance
provisions. Unless otherwise specified in the contract, proposed alternative quality conformance provisions will be submitted by the contractor for evaluation by the technical activity respon-sible for the preparation of this specification.
Custodian:
A--AR
Preparing activity:
Army-AR
(Project 131O-A533)
STANDARDIZATION DOCUMENT IMPROVEMENT PROPOSAL
lNSTRUCTlONs
1. The preparing activity must complete blocks 1, 2, 3, and 8. In block 1, both the document number and revision letter should be given.
2. The submitter of this form must complete blocks 4, 5, 6, and 7.
3. The preparing activity must provide a reply within 30 days from receipt of the form.
NOTE: This form may not be used to request copies of documents, nor to request waivers, or clarification of requirements on current contracts. Comments submitted on this form do not constitute or imply authorization to waive any portion of the referenced document(s) or to amend contractual requirements.
I..oc”;;~~;;178 ~A~) 2. DOCUMENT OATE (WMMDD)
930610
3“‘OcuME&AH?fiIDGE, 40MM, HIGti VELOCITY, DUMMY, M922A1 METAL PART FOR L NATURE OF CHANGE (/dent/fy paragraph number and ksdude propesed rewrite, if pessibfe. Attach extra sheets if needed. )
5. REASON FOR RECOMMENDATION
. PREPARING ACTfVflY
‘ME U.S ARMY ARDEC b. TELEPHONE (Incfude Area Code)
STANDARDIZATION OFFICE
(1) Commercial (2) AUTOVON
201-724-6675 DSN-880-6675
. ADDRESS (Include Zip Code) IF YOU DO NOT RECEIVE A REPLY WITHIN 45 DAYS, CONTACT:
ATTN: SMCAR-BAC-S
Defense Ouality and Standardization Office
6203 Leesburg Pike, Suite 1403, Falls Church, VA 22041-3466
PICATINNY ARSENAL, NJ 07806-5000 Telephone (703) 7SS-2340 AUTOVON 289-2340
.- - . . . . --- . . . . . . . ,.UU Form 14z0, uc I UY 17evtous edWfms are omouve. 198/290
File details come from the government source that posted it. Updated .