W52P1J-22-R-0009.pdf
PDF 296 KB Posted
- Attached to
- FY22-26 40mm Systems Family of Ammunition
- Solicitation number
- W52P1J-22-R-0009
About this file
This solicitation requests proposals for the production of the 40mm Systems Family of Ammunition for fiscal years 2022 through 2026. The United States Army Contracting Command - Rock Island is seeking to award a firm fixed price contract to AMTEC Corporation on a sole source basis to manufacture critical 40mm cartridges in support of the U.S. Army, Navy, Marine Corps, Air Force and foreign military sales customers. The required cartridges include practice, target, high explosive, and illumination rounds for the MK19 and M203/M320 grenade launchers. Estimated quantities for the base year include over 442,000 Mixed Belt cartridges and over 506,000 M781 practice cartridges. Proposals are due by the date and time specified on the solicitation. The contractor will be provided a government-owned technical data package and must have an approved DD Form 2345 on file to access export controlled data.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 0009 - W52P1J-22-R-0009 OFFEROR QUESTIONS AND USG RESPONSES (16 FEB 2022).xlsx | XLSX spreadsheet | |
| ATTACHMENT 0007 - TRANSPORTATION DATA (16 FEB 2022).xlsx | XLSX spreadsheet | |
| W52P1J-22-R-0009_0003.pdf | ||
| W52P1J-22-R-0009_0002_signed.pdf | ||
| ATTACHMENT 0009 - W52P1J-22-R-0009 OFFEROR QUESTIONS AND USG RESPONSES.xlsx | XLSX spreadsheet | |
| W52P1J-22-R-0009_0002.pdf | ||
| ATTACHMENT 0002 - EPA WORKSHEET (04 FEB 2022).xlsx | XLSX spreadsheet | |
| ATTACHMENT 0001 - 40MM SYSTEMS PRICE MATRIX 14 JAN 2022.xlsx | XLSX spreadsheet | |
| W52P1J-22-R-0009_0001.pdf | ||
| ATTACHMENT 0008 - COCO SECURITY SOW.pdf | ||
| ATTACHMENT 0002 - EPA WORKSHEET.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0005 - OPSEC PLAN - SAMPLE.pdf | ||
| ATTACHMENT 0007 - TRANSPORTATION DATA.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0001 - 40MM SYSTEMS PRICE MATRIX.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0003 - GUIDANCE ON DOCUMENTATION OF CDRLs.pdf | ||
| EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST (CDRLS).pdf | ||
| ATTACHMENT 0006 - ADC REQUIREMENTS.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-22-R-0009 X
2022JAN2612:00pm
DOA6
SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
ALLISON N. HOWELL
(309)782-1297
CCRI-AC
ALLISON.N.HOWELL2.CIV@MAIL.MIL
X 1 25
1 120
X 1
X 4 X 5
X 15 X 23 X 40
X 48
X 50
X 54
X 88
X 89
X 111
X 120
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ALLISON N. HOWELL
Buyer Office Symbol/Telephone Number: CCRI-AC/(309)782-1297
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. NOTICE:
(a) The Technical Data Packages (TDPs) associated with this procurement is classified as Distribution D which means it is limited to the
Department of Defense (DoD) and U.S. DoD Contractors only. Dissemination shall be in accordance with the provisions of DoD directive
5230.25. Violations of export laws are subject to civil and criminal penalties. Distribution of this TDP is only authorized to U.S.
agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with regulations implementing 10 U.S.C. 130. The complete TDPs are available electronically for download. To obtain the Technical Information for this solicitation, AMTEC must request explicit access through SAM.gov "Contracting Opportunities" through the "attachments/links" tab under
Request for Proposal (RFP) W52P1J-22-R-0009. See Section C narrative, TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND
DESTRUCTION OF RESTRICTED TECHNICAL DATA, for further guidance.
(b) Contract C Requirements/Engineering Exceptions are available electronically for download once AMTEC obtains explicit access to
SAM.gov, as noted above. These documents are located within the respective cartridge's TDP.
(c) All contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). If a contractor is not registered in SAM, said contractor cannot be awarded a DoD Contract. Refer to Federal Acquisition Regulation (FAR) clause 52.204-
7, System for Award Management, for details regarding registration.
2. EXECUTIVE SUMMARY:
(a) This solicitation is issued on a sole source basis to AMTEC Corporation under the authority of 10 U.S.C. 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements. This solicitation is for the production of the following 40mm Systems Family of Ammunition configurations, which will result in a single Firm Fixed-Price (FFP) contract for a base award of Mixed Belt and M781, and five evaluated option periods to include the following: M430A1-Metal Pallet, M430A1-Wood Pallet, M433, M583A1, M781, M918, Mixed Belt, M385A1, M992, M585, M661, M662, and M433E1
(see FAR 52.217-6, Option for Increased Quantity, in Section I). The option periods reflect the timeframes in which the USG may procure additional cartridges. The USG reserves the right not to exercise options for any reason. Option Periods are as follows:
Option Period One: FY22 (Date of Award - 30 Sep 2022)
Option Period Two: FY23 (01 Oct 2022 - 30 Sep 2023)
Option Period Three: FY24 (01 Oct 2023 - 20 Sep 2024)
Option Period Four: FY25 (01 Oct 2024 - 30 Sep 2025)
Option Period Five: FY26 (01 Oct 2025 - 30 Sep 2026)
(b) In accordance with the terms of the resultant contract, the U.S. Government (USG) may provide Government Furnished Property (see FAR
Clause 52.245-1 in Section I).
(c) AMTEC shall insert all unit prices and First Article Test (FAT) prices for all Contract Line Item Numbers (CLINs) base and option quantities identified in Attachment 0001 Price Matrix. Do NOT use price lines in Section B Schedule. Delivery schedules will be determined at point of award.
(d) Transportation shall be F.O.B. Origin.
(e) The following restrictions apply to this requirement:
- Load, Assemble, and Pack (LAP) of up to 250,000 HV cartridges per month or up to 3,000,000 per year will be restricted to Iowa Army
Ammunition Plant (IAAAP) in order to maintain the production facilities for this critical process in the event of a national emergency.
This is contingent upon availability of adequate funding and acceptable technical/schedule performance by American Ordnance (AO), the operating contractor of IAAAP. However, the PM reserves the right to remove or reduce the restriction if necessary in order to balance
Industrial Base requirements to mitigate readiness risk or prevent single point of failure.
- LAP of LV cartridges will be restricted to the U.S., its outlying areas, or Canada.
- Fuzes and Propellant will be restricted to the U.S., its outlying areas, or Canada.
2 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) The items contained in this RFP are determined to be hazardous; therefore a pre-award safety survey will be required, as prescribed in DFARS PGI 223.370-4(1)(iv). Additional preaward survey criteria may also be required.
(g) Prior approval of Contract Data Requirements List (CDRLs), i.e. AIE, SPC, ADC, on other USG contracts does NOT guarantee roll-over approval of CDRLs on award(s) resulting from this solicitation.
(h) Flowdown of Requirements: All CDRL requirements of solicitation W52P1J-22-R-0009 and the resultant contract must be flowed down to and met by subcontractors and vendors at all tiers. These include, but are not limited to: Quality System Plans, Critical
Characteristics Control Plans (CCCPs), Critical Plans of Action (CPOAs), Phosphate Coating Pre-Production Procedures, Engineering Change
Proposals (ECPs), Requests for Variation (RFVs), Contractor Identified Critical Characteristic Listing (CICCLs), Notifications, Investigations, Segregated Material Use and Restart Requests, Performance Oriented Packaging (POP) Testing, Operations Security (OPSEC)
Plans.
(i) AMTEC is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. The USG will not make assumptions concerning AMTEC's intent, capabilities, facilities or experience. The submission of CLEAR, ACCURATE, and COMPLETE information is the sole responsibility of AMTEC. Please ensure all fill-ins are completed, if applicable. If fill-ins are not applicable, AMTEC shall indicate N/A.
(j) The solicitation includes Economic Price Adjustment (EPA) provisions for steel, aluminum, zinc, tungsten and copper. See Section I, for further details.
(k) The USG requests AMTEC's proposal remains valid for 270 days. AMTEC shall annotate the 270-day validity period in Block 12 of this
RFP.
(l) In the event that a discrepancy between any statements in Narrative A and another section of the RFP exists, the other sections take precedence.
(m) Contact Information: Proposals shall be submitted electronically to the Contract Specialist, Ms. Allison Howell, allison.n.howell2.civ@army.mil, and the PCO, Ms. Anna Whitcomb, anna.e.whitcomb2.civ@army.mil.
*** END OF NARRATIVE A0001 ***
3 120
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
9999AA DATA ITEMS - CDRL _________________
Contractor will prepare and deliver data in accordance with the requirements, quantities, and schedules set forth in the Contract Data
Requirements List (CDRL) found at Exhibit A.
A DD250 is not required.
(End of narrative B001)
4 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
DRAWINGS/SPECIFICATIONS:
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications applicable to this procurement are listed below.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
(d) Refer to the Attached Contract C Requirements for engineering exceptions.
CLIN 1001 - M430A1
NSN: 1310-01-564-2160 (M549A1 fuze, Metal Pallet)
Drawings and Specifications in accordance with Technical Data Package Listing 13021689:19200, with revisions in effect as of 04 MAR
2021, are applicable to this procurement.
CLIN 1002 - M430A1
NSN: 1310-01-567-5540 (M549A1 fuze, Wood Pallet)
Drawings and Specifications in accordance with Technical Data Package Listing 13023627:19200, with revisions in effect as of 04 MAR
2021, are applicable to this procurement.
CLIN 1003 - M433
NSN: 1310-00-992-0451
Drawings and Specifications in accordance with Technical Data Package Listing 13008211:19200, with revisions in effect as of 04 MAR
2021, are applicable to this procurement.
CLIN 1004 - M583A1
NSN: 1310-00-159-3198
Drawings and Specifications in accordance with Technical Data Package Listing 13008210:19200, with revisions in effect as of 26 FEB
2021, are applicable to this procurement.
CLIN 1005 - M781
NSN: 1310-01-589-4275
Drawings and Specifications in accordance with Technical Data Package Listing 13022728:19200, with revisions in effect as of 01 MAR
2021, are applicable to this procurement.
CLIN 1006 - M918
NSN: 1310-01-572-0693
Drawings and Specifications in accordance with Technical Data Package Listing 13025252:19200, with revisions in effect as of 04 MAR
2021, are applicable to this procurement.
CLIN 1007 - MIXED BELT
NSN: 1310-01-541-8181
Drawings and Specifications in accordance with Technical Data Package Listing 13014955:19200, with revisions in effect as of 03 MAR
2021, are applicable to this procurement.
CLIN 1008 - M385A1
NSN: 1310-01-572-0689
Drawings and Specifications in accordance with Technical Data Package Listing 13025254:19200, with revisions in effect as of 04 MAR
2021, are applicable to this procurement.
CLIN 1009 - M992
NSN: 1310-01-422-1048
Drawings and Specifications in accordance with Technical Data Package Listing 13019667:19200, with revisions in effect as of 25 FEB
2021, are applicable to this procurement.
CLIN 1009 - M992 ALTERNATE
NSN: 1310-01-640-6429
Drawings and Specifications in accordance with Technical Data Package Listing 13058720:19200, with revisions in effect as of 25 FEB
2021, are applicable to this procurement.
CLIN 1010 - M585
5 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NSN: 1310-00-922-9784
Drawings and Specifications in accordance with Technical Data Package Listing 13017063:19200, with revisions in effect as of 26 FEB
2021, are applicable to this procurement.
CLIN 1011 - M661
NSN: 1310-00-541-6148
Drawings and Specifications in accordance with Technical Data Package Listing 13017064:19200, with revisions in effect as of 23 FEB
2021, are applicable to this procurement.
CLIN 1012 - M662
NSN: 1310-00-541-6149
Drawings and Specifications in accordance with Technical Data Package Listing 13019666:19200, with revisions in effect as of 23 FEB
2021, are applicable to this procurement.
CLIN 1013 - M433E1
NSN: 1310-01-655-7740
Drawings and Specifications in accordance with Technical Data Package Listing 13064663:19200, with revisions in effect as of 14 APR
2021, are applicable to this procurement.
*** END OF NARRATIVE C0001 ***
TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA
(a) TDPs will be obtained electronically via the Contracting Opportunities posting for this requirement on the SAM.Gov website. You must have an account prior to accessing any TDP(s). To register for an account in SAM.Gov, please visit https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select create account. The toll free helpdesk phone number is (866)606-8220 and for International (334) 206-7828. Vendors are responsible for placing correct information in SAM.Gov.
(b) You may need to use special software to view the documents that are posted on SAM.Gov. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or Lucent viewers to view the TDP(s) and are available as freeware at:
ImageR Viewer: http://g6msd.redstone.army.mil
Lucent Viewer: http://www.ec-edi.com/
(c) The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.
(d) FOR RESTRICTED TDP(s):
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDPs and any other related documents are posed with various options, such as Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDP(s):
TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.Gov, go to the applicable solicitation under Contracting Opportunities within SAM.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. Completion of a Use and Non-Disclosure
Agreement form may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from mailto:donotrely@sam.gov saying A Notice Manager from ACC-RI has updated your access to
Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.
(2) Access to EXPORT CONTROL TDP(s):
(i) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid
Contractor login credentials. In addition, to obtain access to these TDP(s), vendors and Contractors must have a current DD 2345, Military Critical Technical Data Agreement on file with the Defense Logistics Information Service (DLIS). If you do not have an approved
DD 2345, Military Critical Technical Data Agreement on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/ click on Documents and follow the
6 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
instructions provided. Processing time is estimated at five (5) working days after receipt.
(ii) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.Gov, go to the applicable solicitation under Contracting Opportunities within
SAM.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP. You will receive a system generated email from mailto:donotrely@sam.gov saying A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.
(iii) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.
(iv) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751,
et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq.
CLIN: Various
TDPL Date: Various
(3) Further dissemination of Restricted TDP(s) must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the restricted technical data has been provided, the Contractor is REQUIRED to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning or melting any physical copies of the TDP and/or deletion of removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(e) Questions related to registration in SAM.Gov should be directed to https://fsd.gov/fsd-gov/home.do . The helpdesk phone number is (866)606-8820. Vendors are responsible for placing correct information in SAM.Gov. A user guide for SAM.Gov can be found here:
https://dodprocurementtoolbox.com/site-pages/contract-opportunities
*** END OF NARRATIVE C0002 ***
STATEMENT OF WORK - 2-D BAR CODING VERIFICATION
(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D Bar Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.
(b) An approval of the suppliers 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative. Prior to formal submission of product to the Government for acceptance, a first time sample of the suppliers initial 2-D Bar Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US Army Joint
Munitions Command, 1 Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar Code
Verification system.
(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.
(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.
(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D
Bar Code labeling that is affixed to the suppliers product.
(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.
*** END OF NARRATIVE C0004 ***
STATEMENT OF WORK: HEAVY PHOSPHATE COATING REQUIREMENT
(a) The following requirements regarding heavy phosphate coatings are applicable to this statement of work and any resultant contract in
7 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
addition to those requirements set forth in specification MIL-DTL-16232G.
(b) Paragraph 3.1 of MIL-DTL-16232G refers to "Preproduction Inspection/Review." The procedure shall be submitted IAW the Contract Data
Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail. The proposed procedure shall include a detailed method of control, with ranges for time, concentration, temperature and pH values, and all other pertinent details that will ensure compliance with the requirements of MIL-DTL-16232G.
(c) Paragraph 3.2.4-b of MIL-DTL-16232G refers to The flow of rinse water shall be adjusted, regulated or controlled (by conductivity, total dissolved solids or concentration titration) in conjunction with the rate of production in order to prevent contamination at any time beyond a time limit that is such as to assure no detrimental effect on the coatings produced.
(d) Paragraph 3.2.5-c of MIL-DTL-16232G refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
(e) Paragraph 4.7.3 of MIL-DTL-16232G refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
(f) Paragraph 4.7.5 of MIL-DTL-16232G refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
(g) The "product name" along with the manufacturer of the supplemental oil, dry film lubricant, or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at
Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
a. To obtain MIL Specs, MIL Standards, QPL and QPD products see: https://assist.daps.dla.mil/quicksearch/ .
b. To obtain MIL Specs, MIL Standards, QPD products see: https://assist.daps.dla.mil/online/start/ .
(h) A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
(i) Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.3.2.3 of MIL-PRF-
46010.
(j) Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
(k) Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per
ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
(l) Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for
336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM B610, no more than
5 blisters per 4" x 6" area with none larger than 3/64 inch (1 millimeter) in diameter. Under-film attack at the scribe shall not exceed
1/8 inch (3 millimeter). Salt spray testing of the phosphate coated item, free of supplementary treatment, shall be subjected to a salt spray (fog) test. It shall show no evidence of corrosion for the period of time shown in Table II of MIL-DTL-16232G.
(m) Topcoat color shall be visual/equipment checked against the specified chip no. of FED-STD-595 per paint batch. The procedure shall include the specified color chip number.
(n) Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
*** END OF NARRATIVE C0005 ***
STATEMENT OF WORK: LIGHT AND MEDIUM PHOSPHATE COATING REQUIREMENT
(a) The following requirements regarding light and medium phosphate coatings are applicable to this statement of work and any resultant
8 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contract in addition to those requirements set forth in specification TT-C-490F Amendment 3.
(b) Paragraph 3.2.1 of TT-C-490F Amendment 3 refers to "Procedure Approval." Prior to production, a detailed written procedure identifying cleaning, pretreatment and painting processes shall be submitted to the procuring agency for approval. Process time, temperature, chemical concentrations, process controls and acceptance criteria and any other pertinent details shall be listed for each step of the application process. The procedure shall include the manufacturer and exact proprietary designation of any material used as well as any equipment used in the application of the procedure. The complete procedure which demonstrates ability to pass the performance tests contained herein is to be signed by a company official prior to its submittal for approval. Deviation from the approved procedure is not permitted without written approval from the procuring agency (see Supplementary Requirements for Non-CARC).
(c) Paragraph 3.2.2 of TT-C-490F Amendment 3 refers to Preproduction Validation Panels. The test panels shall be the same substrate as will be used in production. For parts or panels requiring epoxy primer and urethane/epoxy topcoat finishes (CARC paint systems), the preproduction panels or parts three phosphated only; three phosphate plus primer; three phosphate, primer, and topcoat. For parts or panels requiring Alkyd topcoat finishes, the preproduction panels or parts three phosphated only; three phosphate plus topcoat.
*** END OF NARRATIVE C0006 ***
STATEMENT OF WORK (SOW) FOR 40MM SYSTEMS FAMILY OF AMMUNITION
1. SCOPE: The contractor is required to manufacture and deliver 40mm cartridges (see Section B) in accordance with the TDPs provided by the Government as referenced in Section C. The quantities to be manufactured and delivered are those cited in the schedule (Section B) of the contract.
2. APPLICABLE DOCUMENTS: Technical Data Package Lists (TDPLs) shall be in accordance with those listed in Section C of the contract to include any modifications. Unless otherwise specifically noted in the contract, the production shall be in accordance with the applicable specification.
3. REQUIREMENTS:
(a) The contractor shall perform all tasks necessary to ensure the manufacture and delivery of 40mm cartridges in accordance with the TDPs referenced in Section C of this document. These tasks include, but are not limited to, the following activities:
- Planning and scheduling production;
- Procurement or production of components;
- Conducting engineering assessments of test data;
- Conducting engineering assessments of the hardware and production processes necessary to ensure production on schedule;
- Selection of appropriate combinations of component dimensions and of the production processes to ensure that
TDP/Specification requirements are met;
- Testing of components and assemblies for verification of performance levels;
- Monitoring of subcontractors to assure they are meeting TDP/Specification requirements;
- Management of a product assurance quality system as defined in Sections C and E; and
- Resolution of any manufacturing or quality issues encountered during the performance of this contract.
Performance of these minimum tasks shall not be construed as relieving the contractor of the responsibilities under the terms and conditions of the contract to furnish the Government with items fully in conformance with the requirements of the product drawings, Quality Assurance Provisions (QAPs), and specifications.
(b) The contractor should not assume, nor does the Government guarantee, that all possible combinations permitted by the tolerance limits of the specifications and drawings will consistently satisfy the requirements. Individual items within the TDP may not all be made to the limits of the tolerance bands as it may prevent proper assembly or performance. Therefore, the contractor is obligated to choose those combinations of tolerances and fits within the limits of the TDP and drawings that best suit its process needs and still satisfy all requirements.
(c) The Government reserves the right to obtain the necessary data required to adequately make a decision regarding the acceptability of cartridges/components and/or whether contractual requirements are being met. This may include proprietary data; such data will be protected by the Government and only be provided on a "need-to-know" basis. The PCO may request in writing, at no additional cost to the Government, the following types of data:
- Certified material test reports;
- Incoming inspection reports;
- First Article reports;
- Rework procedures;
- Production Process control documents/Work instructions;
- Process control data/plans;
9 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
- Quality system plans;
- Critical defects plans; and
- Raw data from component ballistic tests.
The PCO reserves the right to require submission of other types of data as required. Requests for documentation in no way waive any rights of the Government under the Inspection Clause, 52.246-2 or obligations of the Contractor under the Warranty Clause, 52.246-17.
(d) The contractor shall perform configuration management in accordance with the provisions and clauses pertaining to Engineering
Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Notices of Revision (NORs), and Requests for Variance (RFVs).
Submission of all these documents shall address ozone-depleting chemicals (ODCs), as required by Public Law 102-484, Section 326.
(e) The contractor shall maintain a Quality System in compliance with ISO 9001-2008, or equivalent. Supplements to the Quality
System requirements are contained elsewhere in this contract. MIL-STD-1916 describes DoD's preferred test methods for product acceptance. (In this SOW and contract, references to the Quality Assurance Representative (QAR) are intended to mean the prime contractor's QAR.) The Contractor's QAR may delegate any responsibilities to a subcontractor's QAR as deemed appropriate.
(f) The contractor shall include in its Quality System Plan (QSP) provisions for audits of suppliers to verify compliance to process controls and contract quality requirement. Results of such audits shall be made available to the Government, upon request. As a part of the QSP, the contractor shall identify the key characteristics and key processes that affect safety and performance. The contractor shall also identify how it is intended to control these processes and characteristics and what corrective action(s) will be taken when these processes and characteristics fall below established threshold levels identified in the QSP. The contractor shall provide a copy of the key characteristics to the PCO annually. Any deletions to the key characteristics list shall be provided as they occur, along with supporting data and rationale for the change.
(g) First Article Test (FAT) requirements apply to ALL 40mm family items as called out in the respective TDPLs. Contractor should not assume it is "qualified" or "approved" or that pre-production or subsequent FAT requirements will be waived. However, the contractor may submit requests for FAT waiver to the PCO for consideration. The request shall include the prior contract number, respective specification, and verification that the applicable component has not been out of production in excess of ninety (90) days.
(h) Acceptance Inspection Equipment (AIE), inclusive of Automated Acceptance Inspection Equipment (AAIE) is required for all items as called out in the respective TDPLs. Contractor should not assume it is "qualified" or "approved" by the Government, or that approvals from other contracts will be rolled over. However, the contractor may submit a request to roll over AIE (inclusive of AAIE) approval to the PCO for consideration. The request shall include the prior contract number, the previously approved AIE (AAIE) documentation, and
Contracting Officer's letter of approval with applicable enclosed Evaluation of Acceptance Inspection Equipment Designs (EAIED).
(i) With regard to narrative clause CRITICAL CHARACTERISTICS (SIX SIGMA), in Section E, AMTEC is provided the following clarification relative to the terms "generating" and "critical non-conformance escape":
- Paragraph (b) 'generating':
The manufacturing process has 'generated' a critical defect whenever a critical defect is discovered, regardless of where in the manufacturing process it is discovered.
- Paragraph (c) 'critical non-conformance escape':
A 'critical non-conformance escape' has occurred any time a critical non-conformance is discovered at any point in the manufacturing process after the designated inspection point for that defect, regardless of whether or not the defective unit has physically left the manufacturing facility.
4. PROGRAM MANAGEMENT REVIEWS (PMRs): PMRs shall be held as often as quarterly with the location and time to be established by the PCO.
Responsible and cognizant contractor personnel shall attend these reviews to provide cognizant Government personnel with a status update, accomplishments during the previous period, and a review of any technical and administrative issues associated with the program.
The contractor is encouraged to have partners/vendors/subcontractors (as applicable) participate in the PMRs, and the Government may request their participation to address specific issues. Accomodations must be made for virtual participants.
5. CONSIDERATION FOR REVISED DELIVERY SCHEDULES: The contractor is responsible for meeting the delivery schedules defined in the contract. Pursuant to FAR 52.249-8 "Default (Fixed-Price Supply and Service)" as contained within this contract, unexcused failure to deliver supplies within the time specified in this contract or any extension constitutes default. In the event of contractor default, or anticipatory default, with respect to delivery schedules, the Government may, at the PCO's discretion, revise the delivery schedule and, as a result, seek consideration from the contractor for the change.
6. PRODUCTION PROGRESS REPORTS: Production Progress Reports are required, and shall be submitted in contractor MS Excel format (the format to be approved by the PCO). These reports shall be submitted monthly, and shall include (but not be limited to) the following information: PRON, CLIN, ship to location, ACRN, TAC, MILSTRIP, delivery date, quantity required, unit price, extended total, DD250 number, quantity shipped and balance due. These data elements, at a minimum, shall each be included in a separate cell within the row for a given record in the Excel file.
10 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The contractor shall also report any delay in the scheduled delivery or completion as soon as known or anticipated.
Production Progress Reports shall be distributed electronically to the following, at a minimum:
1. Procuring Contracting Officer and Contract Specialist
2. Defense Contract Management Agency (DCMA)
3. JMC Production Manager.
7. GOVERNMENT FURNISHED PROPERTY:
(a) Pursuant to the Government Property clause in Section I of this contract, the Government shall furnish F.O.B. contractor's place of performance, the Government-owned property listed below for use in the performance of this contract.
Government Furnished Material (GFM):
Calibration Rounds, NSN 1310-01-624-2826
CH-6 Explosive, NSN 1376-00-787-7614
(b) The GFM shall be delivered no later than thirty (30) days prior to the contractor's required delivery schedule.
(c) If the GFM is not received in accordance with the schedule set forth above, the Contractor shall immediately notify the
Contracting Officer in writing. If the GFM is to be sent to a location other than the directed Load, Assemble and Pack (LAP) facility, notification should be provided within ten (10) days of award of the requiring respective cartridges.
(d) As stated in 7(a), above, the Government is furnishing CH-6 explosive to the contractor for use in performance of this contract.
Notwithstanding any other clause or provision hereof, the CH-6 is being furnished as-is to the contractor, delivered FOB destination to the directed LAP facility. The Government makes no warranties or guaranties of suitability of the material for a particular purpose. The
Government further makes no representation that the material meets the specifications and requirements of the contract. Therefore it is incumbent upon the contractor to inspect the material and assure compliance with contract requirements prior to use. If any discrepancies are noted, the contractor shall notify the PCO. Should there be any quantity of CH-6 unused or remaining upon completion of the contract, the contractor shall be responsible for demilitarization (demil) and disposal of any such remaining quantity at no additional cost to the Government. The demil of any such remaining quantity shall be accomplished in accordance with any procedures or requirements set forth or incorporated into the contract. The contractor will report at closeout of the contract the total amount used, and shall provide a certification that the remaining amount has been demilitarized. The contractor agrees to hold harmless and indemnify the Government, except in a case of willful misconduct or gross negligence, from any claim for damages or injury, including wrongful death claims, to any person or property arising out of the furnishing of the CH-6.
8. DISPOSAL OF REMAINING GFM AMMUNITION AND EXPLOSIVES FOLLOWING CONTRACT COMPLETION OR TERMINATION: The following requirements apply to Government-Furnished Material (GFM) Ammunition and Explosives (A&E). All A&E are potentially hazardous and tend toward less stability with the passage of time. In particular, A&E containing nitrocellulose based components (such as propellants) or nitrate ester-based components (such as nitroglycerine) loses stability with time.
(a) Within 30 days of completion or termination of the contract, the contractor shall request disposition instructions from the contracting officer for any residual GFM A&E, regardless of condition. The condition of all such GFM A&E, identified by contract number, and NSN or part number, will be indicated in the request. The contracting officer shall provide disposition instructions to the contractor within 90 days of the request.
(b) If the contractor has the capability to dispose of these materials at its facility and is instructed to dispose of the materials through disposition instructions, the contractor shall provide notification to the contracting officer of the destruction of the materials. The notification shall include the contract number, NSN or part number, lot number, nomenclature, and quantity or weight of materials destroyed, and the date of destruction.
(c) The contractor shall manage (to include the treatment, storage and disposal of) all GFM A&E in accordance with all applicable state and federal regulations.
9. LOAD, ASSEMBLE, AND PACK (LAP) OF HIGH VELOCITY (HV) CARTRIDGES.
(a) As set forth in Section H of this solicitation, LAP shall be performed at Iowa Army Ammunition Plant (IAAAP) for HV cartridges, for the quantity up to and including 250,000 per month/3 million per year, provided the funding and requirements exist. This requirement is a monthly requirement, intended to facilitate level production. Contract delivery schedules will reflect level production rates for
HV cartridges to the maximum extent possible. Should a month's requirements fall short of 250,000, the shortfall is expected to be made up in subsequent months, so that the funding year total produced is 3 million rounds, provided the funds and requirements exist.
Requests to accelerate HV deliveries in such a manner that does not provide for level monthly production will not be considered.
11 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Any HV cartridge LAP needed above the 250,000 per month/3 million per year ("excess HV quantities") may be obtained from IAAAP or from other sources within the National Technology and Industrial Base (NTIB). Where a contractor elects to use another NTIB source
("alternate LAP facility") for LAP of any excess HV quantities, the cost for all FAT(s) at the alternate LAP facility shall be borne by the contractor. For proposal and contract commitment purposes, the 40mm cartridges included in the quantity of 250,000 per month/3 million per year commitment are the following HV items: M430A1, M385A1, M918, and Mixed Belt (Ratio of 22:10 M918 to M385A1).
(b) During contract performance, if the contractor intends to terminate, in full or in part, any portion of the directed workload to IAAAP, then it must notify the Government 30 days in advance of any potential termination. The notification should identify the cause of the termination as well as the quantifiable impacts and when these impacts will begin. The contractor must also provide the rationale and actions taken to date to mitigate the situation. If the termination is the result of a delinquent quantity, the contractor must identify the delinquent quantity by cartridge type and month and provide a copy of the agreed-to delivery schedule with the LAP contractor.
10. ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT: All contractor employees, to include subcontractor employees, requiring access to
Army installations, facilities and controlled access areas shall complete Anti-Terrorism (AT) Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the contracting officer, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko/jten/mil .
11. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES: Where Contractor/Subcontractor employees have an area of performance within an Army controlled installation, facility, or area, Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal
Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.
In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
12. OPSEC TRAINING. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
*** END OF NARRATIVE C0008 ***
SCOPE OF WORK (SOW) FOR LOAD, ASSEMBLE AND PACK (LAP) OF 40MM GRENADES
For LAP activities that are to be performed pursuant to this RFP and resulting contract, the LAP contractor's SOW shall include, but not be limited to, the following:
1. Perform program management and initial quality planning.
2. Quote and negotiate contracts/orders for RFPs received based on TDPL and/or Scopes of Work (SOWs).
3. Perform contract administration function.
4. Perform production safety support function.
5. Perform production environmental compliance function.
6. Comply with BATF Licensing and controls.
7. Establish configuration baseline for each order and perform change control during execution.
8. Plan requirements.
9. Receive and inspect incoming materials.
10. Store and manage inventory for incoming materials.
11. Transport and deliver materials to production lines.
12. Comply with all System Contractor Contract Data Requirement List (CDRL) that are applicable to the LAP process, including but not limited to:
a. Quality Conformance Inspection and Test Procedure (Acceptance Inspection Equipment and Automated Acceptance Inspection
Equipment)
b. Special Inspection Equipment - Descriptive Documentation Acceptance
c. Critical Safety Item - Characteristic and Critical Defect Report
13. Design/procure/build tooling and production equipment.
14. Write operating procedures for ammunition work.
15. Make process modifications to support TDPLs awarded.
16. Perform production scheduling function.
17. Perform lot planning function.
18. Perform quality engineering support function including Request for Variance (RFV).
19. Perform process/production engineering support function including: Engineering Change Proposal (ECP) and Notice of Revision (NOR).
20. Perform machine shop support function.
21. Perform process/production startup readiness activities.
12 120
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
22. Perform production quality control function including Quality System Plan including supporting Test/Inspection Report - Acceptance and Description.
23. Perform production maintenance support function.
24. Produce first article if quoted (including testing).
25. Load, Assemble, and Pack (LAP) contract quantities to all prime contract requirements applicable to the LAP process, to include quality and TDPL requirements. Negotiate delivery schedules that support the prime contract delivery schedule.
26. Perform radiological (X-ray) support function.
27. Perform metrology function.
28. Perform chemistry lab support function.
29. Perform lot ballistic acceptance testing and associated Ballistic Lot Acceptance Test Report.
30. Prepare Ammunition Data Cards (ADC), input into Army electronic data base, and submit to local QAR for approval (Systems Contractor prepares and submits DD-250).
31. Prepare and maintain lot history records/files, providing to prime contractor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .