W51AA124R0028.pdf
PDF 1 MB Posted
- Attached to
- FIRE EXTINGUISHER SERVICE Federal contract opportunity
- Solicitation number
- W51AA124R0028
- Issued by
- Department of the Army
About this file
This document is a solicitation (Solicitation Number W51AA124R0028) for a firm-fixed-price service contract to provide depot-wide fire extinguisher inspection, testing, maintenance, repair, and replacement at the Tobyhanna Army Depot in Pennsylvania. The contract has a base year and four one-year option periods. The solicitation includes estimated quantities of fire extinguishers requiring annual and 6-year maintenance, hydrostatic testing, and replacement. Offerors must submit proposals by July 15, 2024 and the award will be made on a best value basis considering technical, past performance, and price factors. A site visit is scheduled for June 20, 2024. The service contract is set aside for small businesses. The Performance Work Statement provides detailed requirements for the services to be performed in accordance with NFPA 10 standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Q and A.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W51AA124R0028 14-Jun-2024
b. TELEPHONE NUMBER
570-615-9288
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 15 Jul 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W51AA19. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JASON BURKE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1V410600YQ
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-APG TOBYHANNA DIVISION (W51AA1)
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,500,000
NAICS:
541990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W51AA124R0028
Section SF 1449 - CONTINUATION SHEET
ADDENDUM
1. This Solicitation, W51AA1-24-R-0028, is in accordance with FAR Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures, and therefore will utilize simplified procedures for soliciting competition, evaluation, award documentation and notification that comply with FAR 13. This requirement is a 100% Total Small Business Set-Aside.
2. The Army Contracting Command (ACC), APG, Tobyhanna Division, Tobyhanna, PA 18466, intends to solicit and award a firm fixed-price (FFP) service contract for these services located at Tobyhanna Army Depot, Tobyhanna PA 18466, in accordance with (IAW) the below Performance Work Statement (PWS).
3. Site Visit: IAW FAR Clause 52.237-1, a single site visit will be conducted. The site visit will be held on Thursday, June 20, 2024, @ 1:00 p.m. The meeting location will be Building 20 (Guard Shack/Security). Attendees are encouraged to arrive 15 minutes early in order to check in. If visitors do not possess a TYAD issued Contractor badge, they will be required to present a valid, Government issued photo I.D. in order to gain access to the base (vehicle registration and insurance may also be required). Attendees are encouraged complete ELTY 648-C, Dec 21 and forward completed ELTY 648-C’s to the POC listed below. Information provided at each site visit, as well as answers to any general questions, shall not affect the terms and conditions of the solicitation and/or specifications.
Terms remain unchanged unless the solicitation is amended in writing. The Contracting Officer Representative (COR) for this project is: Michael Boylan, Phone: 570-615-6265; Email: michael.j.boylan.civ@army.mil. Contact COR/POC to attend the site visit.
4. To receive an award, the company must have an active registration in the System for Award Management (SAM) https://www.SAM.gov with no active exclusions and have no debt subject to offset. Prospective offerors must be found to be responsible in accordance with FAR 9.1.
5. Parties interested in responding to this Request for Proposal (RFP) shall complete a standard form (SF) 1449 http://www.forms.gov, blocks 5, 12, 17a, 17b, 19 thru 24, 30a, and 30b; and 30c. The offer must be signed by a company official authorized to contractually bind the company.
6. BASIS FOR AWARD & EVALUATION CRITERIA: Award evaluation and basis for award will be performed in accordance with FAR 52.212-2, Evaluation-Commercial Items, located in the clause section of the solicitation.
Award will be Best Value to the Government using a Trade-off process for Technical, Past Performance and Price.
Offerors are cautioned that any award may not necessarily be made to the lowest offered price. Proposals shall be submitted and award made by the Government on an all or none basis. Therefore, proposals are solicited on that basis only.
7. TYPE OF CONTRACT: Any resultant award will be a Firm-Fixed Price (FFP) contract and Contract Line Items (CLINs).
8. QUESTIONS: Offerors are advised to submit any questions regarding this Solicitation in writing as soon as practical, but no later than five (5) calendar days prior to Solicitation response date (shown in block 8 of the SF1449), to the contract specialist via email at jason.m.burke.civ@army.mil. Answers will be consolidated and posted to www.sam.gov only in the form of Questions and Answers or, if required, an Amendment to the Solicitation. Questions received after this time may not be answered.
9. PROPOSAL SUBMISSION: Proposal, along with all Proposal Requirements noted below, must be emailed to jason.m.burke.civ@army.mil by the closing date/time in order to be accepted.
Submission Document:
A. Contractor Proposal to include Technical, Three (3) Past Performance References, and Pricing.
(IN ACCORDANCE WITH FAR 52.212-2)
B. Offerors shall complete the pricing in the SF1449, to include the individual prices listed in each CLIN, in order to get the total CLIN prices, as well as a total overall contract price. The completed SF1449 must also be signed. (#5 above)
C. All Signed Amendments if applicable
10. Offerors shall prepare and submit their proposals and supporting documentation referencing Solicitation “W51AA1-24-R-0028” via email to: jason.m.burke.civ@army.mil, in accordance with the submission requirements listed in Clause 52.212-1 Instructions to Offerors and Clause 52.212-2 Evaluation of Commercial Items. As stated therein, failure to follow the instructions may render the proposal non-responsive. The Government is not responsible for any proposal that was not received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of offers, to include any type of firewall delays. Offerors are advised to transmit their complete proposal in enough time to ensure it is received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of proposals. Proposals or parts of proposals received after the time and date specified for receipt of proposals will be considered Late.
11. Offerors shall not submit any assumptions, terms, conditions, caveats, or exceptions with proposals. All concerns shall be addressed and resolved by submitting questions by the date specified in this RFP. No assumptions, terms, conditions, caveats, or exceptions submitted with proposals in response to RFPs will be accepted or incorporated into the awarded contract.
12. Any amendments issued to this solicitation will be synopsized in the same manner as this solicitation. All offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by signing and including one copy of the amendment with their proposal.
13. The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation.
14. The minimum acceptable acceptance period for offers is ninety (90) days from the date specified in Block 8, on Page 1 of the SF1449.
15. Wage Rates can be found on the Service Contract Act side of WWW.SAM.GOV. The services to be performed fall under the authority of the service contract act unless otherwise exempt by the Contracting Officer. Department of Labor (DOL) Service Contract Act Wage Determination No: 2015-5797, Revision No.: 25, Dated: May 13, 2024 is provided at Attachment 1 to this solicitation.
16. DISCUSSIONS
The Government intends to award without discussions. Offerors should provide their best, complete proposal upon initial submission. The Government reserves the right to hold discussions with one or more offerors if deemed necessary by the Contracting Officer.
17. RFQ ATTACHMENTS:
The following documents are attached:
Attachment I - Service Contract Wage Rate Determination
508 COMPLIANCE:
Offeror must also meet the applicable accessibility standards at 36 CFR part 1194 per FAR 39.2, Section 508 of theRehabilitation Act of 1973 (29 U.S.C. 794d) and the Architectural and Transportation Barriers Compliance BoardElectronic and Information Technology (EIT) Accessibility Standards (36 CFR part 1194). Information may be found at the following websites:
Section 508. http://www.section508.gov Section 508 – Electronic and Information Technology. 21 December 2000, http://www.usdoj.gov/crt/508/508law.pdf Desktop and Portable Computer (1194.26). 1 August 2001, http://www.accessboard.
gov/sec508/guide/1194.26.html.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
For
Base Wide Fire Extinguisher Inspection, Testing, Maintenance, Repair and Replacement.
1.0. Introduction.
This is a non-personnel service contract to provide depot-wide fire extinguisher Inspection, Testing, Maintenance (ITM) Repair and Replacement. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description. The contractor shall provide all trained personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other related items and non-personal services necessary to perform Depot-Wide Fire Extinguisher ITM, Repair and Replacement and as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Services. Consist of, but are not limited to the Inspection, Maintenance, Hydrostatic Testing, Recharging, Repair, Replacement and Record Keeping of approximately 1,720 portable fire extinguishers in accordance with (IAW) NFPA 10, Standard for Portable Fire Extinguishers Inspection, Maintenance, Recharging and Replacement (most current edition).
1.2.1 An Attached excel spreadsheet provides listing of quantity, type, class, and locations. Every attempt is made to maintain an accurate extinguisher listing, extinguisher listed in this attachment may not be 100% accurate.
Additional extinguishers may be removed or added during the length of this contract. Class K extinguishers will not be part of this contract.
1.3 Place of Performance. All portable fire extinguishers within the scope of work are located at the Tobyhanna Army Depot (TYAD), located in the Pocono Northeast region of Pennsylvania.
1.4 Hours of Operation – All work shall be performed between the hours of 7:00AM EST and 4:00PM EST Monday through Friday, excluding federal holidays, hard closures or periods otherwise stipulated by the Government.
1.5 Site Visit. To gain a better understanding of this service contract it is suggested that potential bidders attend a scheduled site visit.
2.0 Performance. All portable fire extinguisher tasks performed under this contract shall comply with NFPA 10, Standard for Portable Fire Extinguishers Inspection, Maintenance, Recharging and Replacement (most current edition). The following sub-sections provide additional requirement details for this effort.
2.1 Objective: To perform annual maintenance, 6-year maintenance, hydrostatic testing, repair, recharge, and/or replacement of all extinguishers located at TYAD where required by the most current edition of NFPA 10 Standard for Portable Fire Extinguishers.
2.2 Estimate of Yearly Services:
Base Year
Qty 1508 - ABC 10lb require 6-year maintenance – re-charge or replace.
Qty 7 - Class D 30lb require 6-year maintenance.
Qty 1 -150lb ABC wheeled extinguisher requires 6-year maintenance.
Qty 159 - ABC 10lb require annual maintenance.
Qty 40 - CO2 10lb require annual maintenance.
OY1
Qty 1667- ABC 10lb require annual maintenance.
Qty 7 - Class D 30lb require annual maintenance.
OY2
Qty 138 - ABC 10lb require 6-year maintenance – re-charge or replace.
Qty 21 – ABC 10lb require replacement.
Qty 1529 – ABC 10lb require annual maintenance.
Qty 7 – Class D 30lb require annual maintenance.
Qty 40 – CO2 require hydrostatic testing.
OY3
Qty 1667 - ABC 10lb require annual maintenance.
OY4
Qty 1667 - ABC 10lb require annual maintenance.
2.3 Certifications: Contractor(s) preforming work shall be certified IAW NFPA 10 (most current edition). A certificate from a reputable certifying agency must be provided for each individual contractor prior to performing work.
2.4 Tasks:
2.4.1. Annual Maintenance. Annual maintenance task shall be performed IAW NFPA 10 and the manufacturer’s guidelines. Additionally:
Tamper seals will be removed and replaced with a new tamper seal that includes the year the annual maintenance was performed. Tamper seal may use a designated annual color in lieu of the current year providing the color does not repeat for a minimum of three years. The contractor must receive approval from the COR prior to use. All tamper seals must be UL listed for use on a fire extinguisher.
All fire extinguishers as part of annual maintenance will be dusted, cleaned and/or wiped down.
A conductivity test will be performed annually on all carbon dioxide (CO2) fire extinguisher hose assemblies. Hose assemblies that pass testing will have a label affixed to the hose in a place that will not affect operation.
After maintenance tasks are performed an annual maintenance tag shall be attached to the extinguisher.
2.4.2. 6-year Maintenance. shall be performed IAW NFPA 10 and the manufacturer’s guidelines.
Unless otherwise exempt by NFPA 10, any service that involves internal examination or removal or the valve assembly shall have a properly fitting verification of service collar around the extinguisher’s neck.
2.4.3. Hydrostatic Testing. shall be performed IAW NFPA 10 and the manufacturer’s guidelines.
Unless otherwise exempt by NFPA 10, any service that involves internal examination or removal or the valve assembly shall have a properly fitting verification of service collar around the extinguisher’s neck.
2.4.4. Corrective Maintenance. Fire extinguishers and/or components that fail any maintenance or hydrostatic testing or fire extinguishers that require recharged or replacement will be included in this contract on a cap not to exceed $3500 annually.
2.4.4.1. Installation. The contractor is responsible for the transportation, installation, mounting, removing and/or hanging of fire extinguishers.
2.4.4.2. Replacement. Fire extinguishers removed from its designated location for service, repair and/or replacement shall be replaced with an equivalent type and size extinguisher.
2.4.4.3. Notification. Upon notification from the COR or designated POC a discharged or damaged fire extinguisher shall be serviced or replaced within 24hrs.
2.4.4.4 Disposal. It is the contractor’s responsibility to properly dispose of any fire extinguisher, extinguisher parts, components and/or extinguishing agent.
2.4 Record Keeping and Documentation. Upon completion of all work, the contractor must provide legible documentation indicating inspection and maintenance tasks have been performed in a pass or fail criteria, to include any corrective action taken for extinguishers required to be removed from service.
2.4.1. Annual Maintenance. Tags, labels, reports and documentation must be IAW with NFPA 10. Additionally:
Documentation shall be provided to the COR indicating annual maintenance has been performed. A report shall be created for each building listing every extinguisher that received annual maintenance. At a minimum the report shall include the building number, extinguisher location within the building, the extinguisher manufacturer, model, year, serial number, class, size, the next required 6 year or hydrostatic test year, remarks, results “pass or fail”, date of maintenance and the individual performing tasks.
CO2 hose assembly conductivity test labels at a minimum shall have the company’s name, initials of the individual that performed the test, month and year.
2.4.2. 6-year Maintenance. Tags, labels, reports, and documentation must be IAW with NFPA 10. Additionally:
Documentation shall be provided to the COR indicating 6-year maintenance has been performed. A report shall be created for each building listing every extinguisher that received 6-year maintenance. At a minimum the report shall include the building number, location within the building, the extinguisher manufacturer, model, year, serial number, class, size, the next required 6 year or hydrostatic test year, remarks, results “pass or fail”, date of maintenance and the individual performing tasks.
2.4.3. Hydrostatic Testing. Tags, labels, reports and documentation must be IAW with NFPA 10. Additionally:
Documentation shall be provided to the COR indicating hydrostatic testing has been performed. A report shall be created for each building listing every extinguisher that received hydrostatic testing. At a minimum the report shall include the building number, location within the building, the extinguisher manufacturer, model, year, serial number, class, size, the next required 6 year or hydrostatic test year, remarks, results “pass or fail”, date of hydrostatic testing and the individual performing tasks.
2.4.4. TYAD will maintain an inventory list on an excel spreadsheet. provided to the contractor that will be updated when extinguishers are relocated or changed. Spreadsheet will be distributed as attachment as part of the solicitation process.
2.4.5. The contractor shall submit proposed template and/or samples of all documentation, reports, labels and/or tags prior to use. The proposed template and/or samples must be accepted and approved in writing by the COR before work can begin.
2.4.6. For contractors who utilize web-based or electronic reporting platforms, providing view only access to the COR may be acceptable in lieu of electronic copies through e-mail. This provision is contingent that the COR can verify the reports and documentation is complete and accurate and can be downloaded and printed by the COR.
Prior approval shall be required from the COR.
2.5 Testing: Contractor shall perform internal inspections and/or hydrostatic testing on an as required basis during the five (5) year period of contract award. Contractor shall provide and install temporary fire extinguishers in place of those units being serviced.
3.0 Period of Performance.
3.1 POP The period of performance for this award is twelve (12) months. The Government reserves the right to exercise Option Year One, Option Year Two, Option Year Three and Option Year Four. (FAR 52.217-8; Option to Extend Services). The Government retains the discretion and right to unilaterally exercise the options contained in this contract.
Base Year - Option Year I - Option Year II – Option Year III – Option Year IV
4.0 Quality Assurance.
4.1 Performance Requirements Summary/Quality Assurance Surveillance Plan (QASP):
Performance Requirements Summary/Quality Assurance Surveillance Plan
Performance Requirement
Performance Measure
Performance Standard Acceptable Performance Level APL
Method of Surveillance
Incentive /Disincentive
Inspection and Testing performed
IAW NFPA 10 Sec.
7.2
Quality Completeness
Inspection and testing completed IAW with NFPA 10 requirements for fire extinguishers.
100% Compliance
Technical Review
Positive or Negative
Performance Evaluation;
Required re-performance
Submission of annual inspection reports In Accordance with IAW (PWS Para.
2.1)
Timeliness Quality
Semi-annual reports are submitted NLT 10 days the month following completion. Reports must be complete, accurate and in the accepted format (PWS Para 21)
100% Compliance
Technical Review
Positive or Negative
Performance Evaluation;
Required re-performance
Inspections of fire extinguishers are completed in a satisfactory manor IAW standard industry practices, equipment manufacturer’s recommendations and applicable standards (National
Fire Protection Association, (PWS
Para.2.1
Quality Completeness
Contractor 1 As the inspection of each extinguisher is completed, a description of condition, description of corrective measures, and any other special notes maintenance work performed) are annotated on an inspection form (for each unit). (PWS Para 2.4.
100% Compliance
Technical Review
Positive or Negative
Performance Evaluation;
Required re-performance
4.2. Methods of Surveillance. Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
4.2.1. 100% inspection. This includes reviewing inspection reports and on-site visits.
4.2.2. Customer feedback.
4.2.3 Ratings. Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Acceptable / Unacceptable
4.2.4 Documenting Performance. The following are the documented ratings that will be used to ensure contract compliance:
4.2.4.1 Acceptable Performance. The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
4.2.4.2 Unacceptable Performance. When unacceptable performance occurs, the COR shall inform the contractor.
This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
4.2.4.3 Corrective action. When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.
5.0 Contractor Responsibilities and Qualifications.
5.1 Management. The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees (Reference FAR 37.101). The contractor shall provide all management, quality control, labor, supervision, parts, materials, tools, equipment, supplies, transportation and other services necessary for the depot wide fire extinguisher Inspection, Testing, Maintenance (ITM) Repair and Replacement. The contractor shall, without additional expense to the government, be responsible for obtaining any and all necessary licenses and permits and shall comply with any applicable safety and health requirements by Federal, State and Local laws, codes or ordinances in connection with performance of this contract.
5.2 Schedule. The schedule as agreed upon in the contractor’s proposal shall serve as the standard for completing the effort outlined in this PWS.
6.0 Special Requirements.
6.1.1 AT OPSEC requirements
DEPOT ACCESS:
A background check and approval from TYAD Security Operations Branch is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, Request Access to Tobyhanna Army Depot, to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site.
This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures” below.
Please submit the completed ELTY Forms 648-C form(s) to the COR or POC.
ANTITERRORISM (AT) / OPERATIONS SECURITY (OPSEC) REQUIREMENTS
All security training certificates shall be provided to the Contracting Officer’s Representative (COR)/Point of Contact (POC) and the Contract Specialist/Purchasing Agent.
6.1.2 Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training prior to contract report date. This training is required for any additional or new contractor employees, who start after that period. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://jkodirect.jten.mil for CAC holders. Non-CAC holders may go to http://jko.jten.mil/courses/atl1/launch.html for their training. Upon request, the contractor will be provided one copy of the AT level I training slides for use with employees who may not have computer access. TYAD will not be responsible for printing copies of slides for training purposes. TYAD reserves the right to provide instructor led training and will so advise the contractor within one week of the start of performance or at the time of annual training, if that will be the training approach to be utilized. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record, or contractor equivalent. As applicable, contractor employees must complete annual AT awareness training as it pertains the length of the contract.
6.1.3 iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program. This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The iWATCH training is available at the following website:
https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”. Additional guidance and support can be provided by the TYAD Antiterrorism Officer (ATO) at the contractor’s request. The contractor shall notify the COR/POC within 10 calendar days of the completed training for any new employees or subcontractor personnel to assure the ELTY form 583 or contractor equivalent is properly documented. TYAD reserves the right to provide instructor led training and will so advise the contractor within one week of the start of performance or at the time of annual training, if that will be the training approach to be utilized. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.
6.1.4 Operations Security (OPSEC) Training. Per AR 530-1, Operations Security, contractor employees must complete Level I OPSEC training prior to the contract report date and for any additional or new contractor employees, who start after that period. All contractor employees must also complete annual OPSEC awareness training. The training is available at the following website:
https://securityawareness.usalearning.gov/opsec/index.htm The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. The contractor will be provided a copy of the OPSEC training slides for use with employees who may not have computer access. TYAD will not be responsible for printing copies of slides for training purposes. TYAD reserves the right to provide instructor led training and will so advise the contractor within one week of the start of performance or at the time of annual training, if that will be the training approach to be utilized. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.
6.1.5 Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Security Branch. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
6.1.6 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
7.0 Environmental Requirements
Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651 Proponent ELTY-ISR-E
****Spill Response Procedures 1-2-3****
1. Stop work
2. Call 911
3. Evacuate Area
*********Damaged Asbestos?********* Call Environmental Branch (EB) at 615-7098
*******Environmental Questions?******
Call EB 615-7098
1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).
2. Asbestos
The contractor must ensure that all materials used in the performance of this contract are asbestos-free.
Unless specified in the contract, the contractor must not disturb any existing Asbestos-Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”
Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement. The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.
3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.
4. Burning The contractor must not burn refuse and debris anywhere on TYAD.
5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13693, Planning for Federal Sustainability in the Next Decade; March 19, 2015. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification).
Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223- 9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.
6. Cultural Resources
The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.
7. Demolition Notification
If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700-FM-BAQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 82 13.00 10. The contractor may obtain a copy of the form from the EB.
8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.
9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.
10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or
(570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office.
Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.
11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.
12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB. This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.
13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.
14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.
15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.
16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.
17. ISO 14001
TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.
18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.
19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.
20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.
21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.
22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant, and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.
23. Net Zero Water The contractor will minimize the use of potable water during the construction project. Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements. Automatic hands-free flushometers will not be used. Water-free urinals will not be used. Flushometers will be the piston variety that fail in the closed position. New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.
24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.
25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.
25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).
26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage.
Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.
27. Polychlorinated Biphenyls (PCBs) The contractor must not bring items containing PCBs onto TYAD. Light ballasts that are clearly marked "Contains no PCBs," or that are marked with a manufacture date after 1978 must be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, must be disposed of by the contractor at an approved and licensed facility for PCBs. The contractor must submit a shipping manifest and certificate of disposal of the PCB-containing items to the EB through the COR.
28. Recycling The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR.