W51AA1-24-Q-0006.pdf

PDF 1 MB Posted

Attached to
Purchase Parts , Remove and Install Air Compressor Parts
Solicitation number
W51AA1-24-Q-0006
Issued by

About this file

This is a solicitation from the Department of the Army for the purchase of parts, removal, and installation of air compressor parts. The contractor will be required to purchase and install three replacement parts for an air compressor in Building 9A at Tobyhanna Army Depot, including a motor starter kit, fused sensing board, and output power module. The period of performance is 30 days after order receipt based on a four-week lead time for parts. The contractor must meet all security requirements for access to the depot and be able to obtain an unescorted clearance to perform the work. The award will be a firm-fixed-price contract to the responsible offeror providing the most advantageous offer to the government considering price and past performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W51AA124Q0006 07-Nov-2023

b. TELEPHONE NUMBER

570-615-9554

8. OFFER DUE DATE/LOCAL TIME

04:30 PM 17 Nov 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W51AA19. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MICHAEL J. CLARK

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25G1V327600SB

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-APG TOBYHANNA DIVISION

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SEE BELOW FOR SEPARATE SHIPPING INSTRUCT

XXX

XXX PA 00000

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$9,000,000

NAICS:

811490

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF75

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W51AA124Q0006

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Purchase, Remove and Replace

FFP

CONTRACT IS TO REMOVE AND REPLACE THREE (3) PARTS OF THE

AIR COMPRESSOR THAT HAVE FAILED. REPLACEMENT PARTS

INCLUDE MOTOR STARTER KIT, FUSED SENSING BOARD AND OUTPUT

POWER MODULE

COR: MIKE BOYLAN 570-615-6265

FOB: Destination

NSN: AASSVC327600SB

MILSTRIP: W25G1V327600SB

PURCHASE REQUEST NUMBER: W25G1V327600SB

PSC CD: J030

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 22-DEC-2023 TO

22-JAN-2025

N/A SEE BELOW FOR SEPARATE SHIPPING

INSTRUCT

XXX

XXX PA 00000

FOB: Destination

W25G1V

WAGE DETERMINATION

Wage rates can be found on the Service Contract Act side of https://www.sam.gov Wage Determination No.: 2015-5797 Revision No.: 23 Date Of Last Revision: 06/30/2023

ADDENDUM

ADDENDUM

This acquisition is for a Firm Fixed Price requirement, pursued IAW Federal Acquisition Regulation (FAR) Parts 12 (Acquisition of Commercial Items), and Parts 13 (Simplified Acquisition Procedures.) This is a service contract to remove and install of PART NUMBER 47703538001 Kit, Motor Stator, 160k--- PART NUMBER 22076087 Fuse, 660V, Fast 2.0A and--- Part number 22193932 Output Power Module, Drive HPM 220T.

This contract will be to repair Ingersoll Rand proprietary Brand Name Model: IRN200H-S2, Serial Number:

NFF0687. Under the authority of 10 U.S.C. 2304(c)(1) as implemented by FAR 13.106‐1(b)(1): Action is a Brand Name restriction, and No Other Supplies Will Satisfy Agency Requirements.

The period of performance date specified in this solicitation is only an estimate and will be determined at the time of award.

The services necessary to complete this project shall include providing all licenses, permits, labor, materials, equipment, supervision, and management to complete the project.

BASIS OF AWARD: See 52.212-2 Evaluation – Commercial Items.

FAR 52.217-8 Option to Extend is incorporated into this solicitation. Evaluation is not needed for this extension, as it would allow for additional time only

Contractor submitted questions: Contractors you are advised to submit any questions regarding this solicitation 2 days prior to the close date, in writing to the purchasing agent via email; michael.j.clark238.civ@army.mil. Answers to questions will be acknowledged as soon as available. Questions will not be accepted within two (2) business days of the solicitation closing date.

The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation. After market or grey market items will not be accepted.

QUOTATION SUBMISSION: Parties interested in responding to this RFQ SHALL:

(a) Submit their offer on a completed standard form (SF) 1449 http://www.forms.gov, BLOCK Numbers 17a, 19thru 24, 30a, 30b, and 30c. The offer, (SF1449), must be signed by a company official authorized to contractually bind the company.

(b) Include all, (if any), signed amendments. Any amendments issued to this solicitation will be synopsized in the same manner as this solicitation. All Offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by completing and signing page one (1) and including one (1) copy of each Solicitation amendment with their quotation.

(c) Submit (two) Past Performance references (within last five years) of similar installs. Include contact name, phone number, date of contract, contract number, description of services and location the where the was work performed.

Each offer must be submitted electronically before closing date and time to the purchasing agent, Michael Clark at michael.j.clark238.civ@army.mil The email size must not exceed 9MB.

(d) MSDS Safety data sheet shall be submitted with proposal for approval by environmental prior to the award of the contact.

To receive an award, the company must have an active registration in the System for Award Management (SAM) https://www.sam.gov. Prospective offerors must be found to be responsible in accordance with FAR 9.1 and have no delinquent federal debt.

Only electronic proposals will be accepted. No hardcopy proposals will be accepted. Each proposal must be submitted electronically via email to the Purchasing Agent, michael.j.clark238.civ@army.mil. The size per email must not exceed 9MB. If necessary, offerors may submit multiple emails. If multiple emails are sent, emails must be marked 1 of 2, 2 of 2, etc. To be considered for award, the offeror's complete proposal, including all attachments, must be received in the email Inbox of the Purchasing Agent identified in this solicitation before the closing date and time.

If a complete proposal, including all attachments, does not appear in the email Inbox of the Purchasing Agent identified in this solicitation before the closing date and time, then it is not received, and the offeror's entire proposal is late and will not be considered for award. If the offeror does not receive written confirmation of receipt from the Purchasing Agent before the closing date and time, it is the responsibility of the offeror prior to closing of the solicitation to contact the Purchasing Agent identified above to confirm their complete proposal has been received.

The Government will not consider proposals that were delayed, or otherwise not timely delivered to the Purchasing Agent’s email Inbox because of an issue with the offeror's or the Government's service providers, to include email maintenance, firewall or delivery to any other email box (e.g. junk). Therefore, offerors should anticipate delays in transmission and are advised to plan ahead and to begin transmitting their proposal in enough time to ensure successful delivery prior to the close of the solicitation.

Attachments:

The following list of attachments, though not physically attached to this SF1449 document, are hereby incorporated as part of this solicitation, and resultant award, as applicable:

Attachment I Redacted sole source Attachment II APPENDIX B CONTRACTOR SAFETY STANDARDS FOR TYAD Attachment III APPENDIX E - STANDARD NEPA SPECIFICATIONS FOR PROJECTS MAY 2020

PWS_9A AIR COMPRESSOR REPAIR

PERFORMANCE WORK STATEMENT (PWS)

Building 9A Air Compressor Repair Contract Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Air Compressor Repairs. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform repairs to the air compressor within building 9A as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.

1.2. Background: This is the primary compressor for tool air that supports 75% of the mission and all of buildings 1E, 1A, 4(all bays), 9, & 30.

1.3. Objectives: Repair and restore the air compressor in building 9A to original working conditions. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision.

1.4. Scope: Repair the Ingersoll Rand Compressor located in building 9A. Work includes the purchase and installation of parts from the Original Equipment Manufacturer (OEM) and operational testing upon completion. See Part 5 for Specific tasks/ part numbers.

1.5.Period of Performance: Vendor must commence work 30 days after receipt of order based on the 4 week lead time on parts

1.5. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700 and

1500 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.1. Recognized Holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day June 19th Thanksgiving Day Independence Day Christmas Day

1.7. Place of Performance: The work to be performed under this contract will be performed at Building 9A at

Tobyhanna Army Depot.

1.8. Type of Contract: The government will award a Firm Fixed Price (FFP) Contract.

1.9. Security Requirements: Contractor personnel performing work under this contract must be able to pass a standard background check and must maintain the level of security required for the life of the contract to access the depot. Contractor must be able to obtain an unescorted clearance to the site. Government escorts will not be provided for this contract. The security requirements are in accordance with the attached DD254.

1.10.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.10.1.1 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.10.1.2 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.10.1.3 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.10.1.4 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.12 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.13 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730 and 1500, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.

1.14 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.16 PHASE IN /PHASE OUT PERIOD: Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. Contractor shall meet with the Contracting Officers Representative (COR) prior to the start of work to ensure mutual understanding of the requirements.

Upon completion of requirements under this contract, contractor shall meet with the COR to ensure the air compressor is in fully operational status.

PART 2

DEFINITIONS & ACRONYMS

2 DEFINITIONS AND ACRONYMS:

2.1 DEFINITIONS:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.

2.2 ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary

PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3 GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Facilities: The Government will provide access to building 9A compressor room once approved by security for entry onto Tobyhanna Army Depot.

3.2 Utilities: The Government will provide access to utilities such as water, electric, storm sewers, etc. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

PART 5

SPECIFIC TASKS

5 Specific Tasks:

5.1 Basic Services. The contractor shall provide services for the repair of the building 9A compressor to fully operational status.

5.2 Existing Conditions

5.2.13 It is the responsibility of the Contractor to confirm existing conditions at the compressor prior to the commencement of work.

5.2.14 Compressor Information

Brand: Ingersoll Rand Model: IRN200H-S2 Serial Number: NFF0687

5.3 New Work

5.3.13 New work under this contract will include the replacement of the Motor Stator, Fuse and Output Power Module #1 on the existing compressor listed above. An assessment of the equipment failure has been done for the purposes of repairing this compressor. The following equipment parts are in need of replacement:

Basis of Design: Ingersoll Rand

Part Number Description 47703538001 Kit, Motor Stator, 160k 22076087 Fuse, 660V, Fast 2.0A 22193932 Output Power Module, Drive HPM 220T

5.3.14 The contractor shall protect all Government property and clean all associated debris on and near the jobsite. Cleanup shall be to the satisfaction of COR.

5.3.15 The contractor shall send all debris to a certified state landfill. Manifests of weights shall be supplied to COR if requested.

5.3.16 All work areas shall be clean and in equal or better condition once repairs are completed.

5.3.17 The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.

5.4 Deliverables

5.4.13 Upon completion of the Service and prior to final payment, the Contractor shall run final test in the presents of the COR to ensure compressor is fully operational.

5.4.14 All literature and/or operating manuals shall be given to the COR upon completion.

5.4.15 All serial numbers, models and description shall be given to the COR. Contractor shall be responsible for verifying all parts are compatible with the existing equipment.

PART 6

APPLICABLE PUBLICATIONS

6 APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

6.1 All installations shall comply The International Building Codes (IBC) and Unified Facilities Criteria

Specification (UFCS). Codes And Standards Include, but not limited to, the latest: National Electric Code (NEC), National Fire Protection Association (NFPA), Underwriter’s Laboratory (UL), American Society Of Mechanical Engineers (ASME), American National Standards Institute (ANSI), Occupational Safety

And Health Administration (OSHA), American Society For Testing And Materials (ASTM), American Society Of Heating, Refrigerating, And Air Conditioning Engineers (ASHRAE), International Mechanical Code (IMC), And International Plumbing Code(IPC).

6.2 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

6.3 Requirements checklist as specified below.

U.S. Army - Engineering Branch - TYAD

CONTRACT PACKAGE REQUIREMENTS CHECKLIST

Building 9A Air Compressor Repairs

APPENDIX B CONTRACTOR SAFETY STANDARDS FOR TYAD YES

APPENDIX E - STANDARD NEPA SPECIFICATIONS FOR PROJECTS MAY 2020 YES

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 7.1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 7.2 – Deliverables Schedule

TECHNICAL EXHIBIT 7.1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

The contractor shall provide and install the indicated equipment parts listed in part 5, New work.

The contractor shall provide Fully operational compressor upon completion.

Zero Deviation from standard.

100% Inspection

PRS # 2

The contractor shall test compressor upon completion to ensure fully operational status.

The contractor shall test compressor in the presents of the COR/POC

Zero Deviation from standard.

100% Inspection

TECHNICAL EXHIBIT 7.2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Final Test findings and literature provided with the newly installed parts.

Upon completion of all work.

One copy to the

COR.

Electronic and/or paper.

COR/POC for this contract.

SECURITY REQUIREMENTS

Contractor personnel working on the Tobyhanna Army Depot must be fully identified. Contractors register with TYAD Security in Building 606. All employees, staff, and subcontractor personnel, etc., which will require access must present the following to access TYAD:

A. Full name B. Drivers License C. Nationality (if non-U.S. Citizen, alien registration number)

If Contractor vehicles are required for use on TYAD, the following ID is required:

A. Make B. Model C. State Registration D. Insurance E. License Plate #

Contract personnel are expected to perform work during normal TYAD duty hours (0730-1600). If work must be performed otherwise, permission must be obtained three working days prior from the Security Office through the TYAD Representative.

Contractor personnel must confine themselves to the work sites specified in their contract. Visiting other areas is prohibited.

Alcoholic beverages, weapons, cameras, sound recorders, proscribed drugs and explosives are prohibited on Government property.

Use of Government property without prior written approval of the On Site Representative is prohibited.

TYAD will arrange for special Contractor parking if required. Contractor personnel must not park in numbered spaces, areas reserved for car pools, grassy areas or other prohibited areas. Posted speed limits and traffic restrictions must be observed at all times.

Accidents or problems of a security/safety nature must be reported to the Security (570.615.7550) and TYAD Representative (570.615.7306/8139) immediately.

Contractor personnel working on station for less than 30 days may be required to log in and out at the Visitor's Center each day and will not be issued an Extended Entry Contractor's Badge. The On Site Representative will provide information on how to obtain an Extended Entry Contractor's Badge if one is required.

Pursuant to federal regulations, all personnel and vehicles on Government property are subject to search by authorized personnel at any time.

All Contractors personnel are required to display the TYAD issued identification badge on their person at all times while present on the installation. Access to Government property will not be allowed without this identification badge. The badge is to be displayed on the person outer clothing, above the waist and in full view. Identification badges and vehicle passes issued to Contractor personnel remain the property of the U.S. Government and must be surrendered upon completion of the Contractor at the termination of individual employment, and when requested by the Government.

A list of all personnel working under this contract should be turned in immediately after award in order to allow sufficient time to process security information.

TYAD Security Requirements:

All TYAD contracts and other acquisition-related documents must ensure privacy and security controls follow the information, and that contractors and service providers protect Privacy Act information in the same way the organization adhering to the Federal Acquisition Regulations (FAR) Privacy Act provisions (Subparts 24.1 and 24.2) and include the specified contract clauses (Parts 52.224-1 and 52.224-2), as appropriate, to ensure that personal information is protected as mandated.

In addition to the changes authorized by the clause of this contract; should Force Protection Condition (FPCON) at the installation change, the Government may require changes in contractor security matters and/or processes.

FPCON impact on work levels.

_X_ During FPCONs Charlie and Delta, These repair services are discontinued. Services will resume when the FPCON level is reduced to level Bravo or lower.

_____This contract and its employees are considered mission essential. Therefore, all contractor employees are required to report for duty and remain on duty during declared emergencies and/or elevated FPCON levels unless otherwise directed by the contacting officer via the appropriate COR.

Contingency Operations Plan

The Contractor shall prepare and submit a Contingency Operations Plan to the Government. The Contingency Operations Plan shall document Contractor plans and procedures to maintain support during an emergency. The Contingency Operations Plan shall include the following:

A description of the Contractor’s emergency management procedures and policy A description of how the Contractor will account for their employees during an emergency Planned temporary work locations or alternate facilities How the Contractor will communicate with Government during emergencies A list of primary and alternate Contractor POCs, each with primary and alternate telephone numbers Procedures for protecting Government Furnished Equipment (GFE)/Government furnished property (if any) Procedures for safeguarding sensitive and/or classified Government information (if applicable)

Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

The contractor’s employees shall become familiar with and obey the regulations of the installation;

including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.

Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training prior to contract report date. This training is required for any additional or new contractor employees, who start after that period. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html for their training.

Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record, or contractor equivalent. As applicable, contractor employees must complete annual AT awareness training as it pertains the length of the contract.

iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program. This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/POC. The iWATCH training is available at the following website: https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”. The contractor shall notify the COR/POC within 10 calendar days of review of the information on the website for any new employees or subcontractor personnel to assure the ELTY form 583 or contractor equivalent is properly documented.

Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.

Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Law Enforcement. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

A background check and approval from Tobyhanna Army Depot (TYAD) Law Enforcement is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.

The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, “Request Access to Tobyhanna Army Depot” to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures”.

Submit the completed ELTY Forms 648-C form(s) to the COR or POC. Ensure contracts include the provisions that check for the possibility of and prevent undocumented workers for inclusion in contracted work related to Army missions.

The company will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

Common Access Card (CAC) and Information Systems/Network Access by Contractor Workers. [If applicable.] Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.

Collection of Badges: The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee’s employment.

(3) Upon contract completion or termination.

The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements. The Contractor shall insert the substance of this clause, including this paragraph, in all subcontracts when the subcontractor’s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in of this section, unless otherwise approved in writing by the Contracting Officer.

The company will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility. Contractor personnel will obtain a vehicle pass for access to the military installation and Common Access Cards (CAC) for computer access, if applicable.

Security and privacy requirements for all Department of Defense-Tobyhanna (TYAD) information technology (IT) procurements.

Applicability: The requirements established in this document apply to all employees, contractors, and users authorized to participate in the TYAD IT procurement process. Further, the requirements established herein apply as the entire contract or order (hereafter referred to as a “contract”), or any portion thereof, includes either or both of the following:

a. Access (Physical or Logical) to Government Information: Physical and Logical Access refers to when contractor personnel (and/or any subcontractor) are expected to have (1) routine physical access to an TYAD-controlled facility; (2) logical access to an TYAD-controlled information system; (3) access to government information, whether in an TYAD-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3) as per OMB M-05-24, Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors.

b. Operate a Federal System Containing Information: A Contractor (and/or any subcontractor) employee will operate a federal system and information technology containing data that supports the TYAD mission. In addition to the Federal Acquisition Regulation (FAR) Subpart 2.1 definition of “information technology” (IT), the term as used in this section includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.

Requirements: Safeguarding Information and Information Systems In accordance with the Federal Information Processing Standards Publication (FIPS) 199, Standards for Security Categorization of Federal Information and Information Systems, the Contractor (and/or any subcontractor) shall:

a. Protect Government information and information systems in order to ensure:

Confidentiality, which means preserving authorized restrictions on access and disclosure, based on the security terms found in this contract, including means for protecting personal privacy and proprietary information.

Integrity, which means guarding against improper information modification or destruction, and ensuring information non-repudiation and authenticity.

Availability, which means ensuring timely and reliable access to and use of information.

b. Provide security for any Contractor systems, and information contained therein, connected to a TYAD network or operated by the Contractor on behalf of TYAD regardless of location. In addition, if new or unanticipated threats or hazards are discovered by either the agency or contractor, or if existing safeguards have ceased to function, the discoverer shall immediately, within sixty (60) minutes or less, bring the situation to the attention of the other party.

c. Adopt and implement policies, procedures, controls, and standards that are in effect at the time of contract solicitation and required by the TYAD Information Security Program to ensure the confidentiality, integrity, and availability of government information and government information systems for which the Contractor is responsible under this contract or to which the Contractor may otherwise have access under this contract. Obtain the TYAD Information Security Program security requirements based on the National Institute of Standards and Technology (NIST) “Framework for Improving Critical Infrastructure Cybersecurity.” The framework contains the five (5) core functions to “Identify,” “Protect,” “Detect,” “Respond (to),” and “Recover (from)” any cybersecurity event.

d. Comply with the Privacy Act requirements and with the Federal Information Security

Modernization Act (FISMA) and with the OMB memo M-17-12, Preparing for and Responding to a Breach of Personally Identifiable Information, Contractor Employee Personnel Security Screenings documents, and FAR clauses as applicable and incorporated into this solicitation/contract. Personally Identifiable Information is defined as below.

Per Office of Management and Budget (OMB) Circular A-130, Personally Identifiable Information (PII) is “information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual.” Examples of PII include, but are Security and Privacy Requirements for Information Technology Procurements not limited to the following: social security number, date and place of birth, mother’s maiden name, biometric records, etc.

Per TYAD, sensitive PII is PII that if released improperly could result in harm, embarrassment, inconvenience, or unfairness to the individual whose name or identity is linked to the information. Context must be accounted for in order to determine whether PII is sensitive.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .