This is a Performance Work Statement (PWS) for the P506 Pyro Milcon Equipment Purchase and Installation project at Crane Army Ammunition Activity in Crane, Indiana.
The contractor shall procure and install process equipment supporting the P-506 Pyro Facility Equipment project, including all management, tools, software, supplies, equipment, and labor. Procurement services encompass purchase, shipping, and receiving of equipment on-site. Installation services include unpacking, moving equipment into place, leveling/mounting, connecting to existing infrastructure (air, electric, steam), duct connections, debris disposal, test runs, operator training, and initial setup. The equipment list comprises approximately 450 pieces across multiple categories: presses and tooling (21 items including SERVOPRESS units ranging from 8 to 525 kN, hand presses, and specialized tooling); ovens and carts (10 items including fuel ovens, oxidizer ovens, epoxy curing ovens, and 50 curing carts); production equipment (21 items including mixers, pulverizers, screeners, and drum tumblers); general equipment (16 items including collaborative robots, conveyors, and cranes); ventilation equipment (8 categories with 115 total units including scrubbers, dust collectors, and hoods); scales (3 types totaling 56 units); and miscellaneous general equipment (8 items including blast windows and storage racks). The performance period runs continuously for one year from award date with an initial 30-day procurement phase, with extension requests due 90 days before contract end. Contractor personnel must work Monday through Thursday from 0700-1600 hours during normal business hours, with possible emergency services outside these hours. All equipment must be rated Class 1 Division 1 Groups C&D and Class 2 Division 1 Groups E, F&G or better for pyrotechnics manufacturing facility use. The contractor is responsible for developing and implementing a comprehensive safety plan including general and equipment-specific requirements, PPE, lift plans, corrective actions, Job Hazard Analyses, and Safety Data Sheets, with performance thresholds requiring no recordable incidents, lost-time accidents, or deaths, and schedule completion with no late finishes acceptable (early finish within 10% of scheduled date acceptable). The U.S. Government will provide no equipment, fuel, personnel, utilities, or facilities to the contractor.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
P506 Pyro Milcon – Equipment Purchase and Installation
AT
Crane Army Ammunition Activity – Crane, IN
Prepared by: S4- Equipment
DRAFT
PERFORMANCE-BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1 DESCRIPTION OF SERVICES………………………………………………..3
2 GENERAL INFORMATION…………………………………………………….5
3 SERVICES SUMMARY…………………………………………………………6
4 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES……..6
1 DESCRIPTION OF SERVICES
The contractor shall provide all management, tools, software, supplies, equipment, and labor necessary to procure and install process equipment in support of the P-506 Pyro Facility Equipment project. Procurement services shall include purchase, shipping, and receiving equipment on-site. Installation shall include unpacking, moving equipment in place, leveling/mounting, final power (air, electric, steam, etc.) connections to the existing infrastructure, duct connections, packing and created construction debris disposal, test run, operator training, and initial setup. Exact equipment specifications are still under development and will be provided later in a separate document.
PERIOD OF PERFORMANCE
Performance period for this contract will be no more than 30 days from the date of award and will run continuously for 1 year due to long lead time items. Extensions will need to be submitted for approval no later than 90 days before the scheduled end of the contract.
SPECIFIC REQUIREMENTS
Contractor to procure equipment, install, and test run. Contractor is responsible for all tools, personnel, materials, and equipment to perform this work.
Equipment the contractor will need to procure includes:
Category Equipment / Tooling QTY’Sy
Presses & Tooling SERVOPRESS 525 kN 12
Presses & Tooling SERVOPRESS 80 kN 7
Presses & Tooling SERVOPRESS 8 kN 2
Presses & Tooling PRESS LINE CONVEYOR 2
Presses & Tooling PRESSLINE LOADING PRESS 2
Presses & Tooling PRESSLINE UNLOADING PRESS 2
Presses & Tooling HAND PRESS 1
Presses & Tooling DELAY IGNITER PRESS TOOLING 1
Presses & Tooling FLARE COMPOSITION PRESS TOOLING 1
Presses & Tooling FLARE COMPOSITION CRIMPING 1
Presses & Tooling OUTPUT CHARGE CRIMPING TOOLING (DWG 15-12-280) 2
Presses & Tooling CANISTER STAKING ASSEMBLY 2
Presses & Tooling GO-NOGO GAUGE 1
Presses & Tooling REAMER 1
Presses & Tooling TRAVEL TOOLING (X15) 2
Ovens & Carts FUEL OVEN (Friction Air Ovens) 4
Ovens & Carts OXIDIZER OVEN (Friction Air Ovens) 4
Category Equipment / Tooling QTY’Sy
Ovens & Carts TNC OVEN (Friction Air Ovens) 2
Ovens & Carts EPOXY CURING OVEN 1
Ovens & Carts TRUCK OVEN CARTS 4
Ovens & Carts CURING CARTS 50
Ovens & Carts CURING CART 2
Production Equipment BLADELESS MIXER – 2 LBS 4
Production Equipment SIMPSON MUELLER 8
Production Equipment PULVERIZER 2
Production Equipment SCREENER 6
Production Equipment CHIPPER 2
Production Equipment FIBERTUBE EPOXY APPLICATOR 2
Production Equipment POWDER DISPENSER 2
Production Equipment VIBRATORY FEEDER 8
Production Equipment VIBRATORY FEEDER TABLE 6
Production Equipment DRUM TUMBLER 2
Production Equipment ENCLOSURE FOR DRUM TUMBLER 2
Production Equipment TRAY/DRUM DUMPER 6
Production Equipment DUSTLESS TRAY DUMPER 2
Production Equipment DRUM DISPENSER, 55 GALLON 2
Production Equipment DRUM TRUCK, 55 GALLON 4
Production Equipment DELAY HOLDER PROCESS DWG 13013725 2
Production Equipment TIMER ASSEMBLY PROCESS DWG 1212973 1
Production Equipment PRODUCT DWG 7294843 2
General Equipment CART CONVEYOR 1
General Equipment VACUUM CONVEYOR 8
General Equipment CANISTER CART 8
General Equipment COLLABORATIVE ROBOT 14
General Equipment ARMAG NON-CONDITIONED 10
General Equipment ARMAG CONDITIONED 2
General Equipment OUTDOOR HEATER/CHILLER FOR MIX VESSEL 4
General Equipment JIB CRANE / WITH HOIST 6
Ventilation WET SCRUBBER 24
Ventilation DRY DUST COLLECTOR 6
Ventilation BLOWER 18
Ventilation VENT HOOD 22
Ventilation VAPOR HOOD 17
Ventilation VAPOR EXTRACTION ARM 17
Ventilation LOW PICKUP VENTILATION 5
Ventilation BACKDRAFT WORKSTATION 15
Category Equipment / Tooling QTY’Sy
Ventilation WET VACUUM 13
Scales BENCHTOP SCALE – 60 LBS (30 KG) 33
Scales BENCHTOP SCALE – 6 LBS (3 KG) 8
Scales FLOOR SCALE – 500 LBS 15
General Equipment BLAST WINDOW 16
General Equipment MISC. TABLES 26
General Equipment WORK BENCH 2
General Equipment TABLE 1
General Equipment STORAGE RACK 2
1.2.3 Contractor to perform work during normal business hours.
1.2.4 Equipment will be used to support a pyrotechnics manufacturing facility. Where applicable equipment must be rated Class 1 Div 1 Gorup C&D and Class 2 Div1 Groups E,F&G or better.
2 GENERAL INFORMATION:
2.1 HOURS OF OPERATION: Contractor Personnel shall be readily available Mon- Thurs at the site from 0700-1600. Concessions are made for religious holidays, at the discretion of the US, when it does not interfere with operations.
2.1.1 Emergency Services: On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above.
2.2 Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items through unit designee. Violations are grounds for termination.
2.3 At no time, without authorization, will a Contractor Personnel purchase any items from the local economy for any US Personnel.
2.4 Standards of Conduct: Contractor Personnel must adhere to standards of conduct as established by the Installation Commander.
2.5 Security Requirements: Contractor shall adhere to current installation security policies.
2.6 The contractor shall provide an interpreter if English is not the primary language of the workers. The interpreter shall be on site at all times.
2.7 RECORDS: The contractor shall be responsible for creating, maintaining, and disposing of government required documents including technical manuals, bill of ladings, receipts, parts lists, drawings, and test documents. If requested by the Government, the contractor shall provide the original record or a reproducible copy of any such record within 5 working days of receipt of the request. All records shall be provided to the government at conclusion of the project.
2.8 The contractor shall develop and put in place a safety plan prior to performing work on-site. Safety plan shall include general safety requirements, equipment/situation specific safety requirements, required PPE, lift plans, corrective action procedures, JHAs and SDSs required to do the job safely. Contractor shall also develop and deliver a JSA at the start of each shift. Contractor to provide all needed personnel for safety compliance including but not limited to fire watches, hole watches, load attendants, and spotters.
2.9 SPECIAL QUALIFICATIONS: Personnel shall be proficient in the trade they are working in. Proficiency can be demonstrated by completed organizational PQS, licenses, training certificates, completed apprentice programs, degrees, and professional certifications. Documented experience can also meet this requirement depending on the field.
3 SERVICES SUMMARY:
Performance Objective PWS Para Performance Threshold
Schedule 1.1 Finish late is not acceptable, Finish early within 10% of scheduled finish.
Safety 2.8 No recordables, lost time accidents, or deaths
4 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES: The US Government will not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic life saving and life support measures will be provided during the emergency.
| 1.2.3 Contractor to perform work during normal business hours. |
| 2 GENERAL INFORMATION: |
| 2.1 HOURS OF OPERATION: Contractor Personnel shall be readily available Mon-Thurs at the site from 0700-1600. Concessions are made for religious holidays, at the discretion of the US, when it does not interfere with operations. |
| 2.1.1 Emergency Services: On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above. |
| 2.2 Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items through unit designee. Violations are grounds for termination. |
| 2.3 At no time, without authorization, will a Contractor Personnel purchase any items from the local economy for any US Personnel. |
| 2.4 Standards of Conduct: Contractor Personnel must adhere to standards of conduct as established by the Installation Commander. |
| 2.5 Security Requirements: Contractor shall adhere to current installation security policies. |
| 2.6 The contractor shall provide an interpreter if English is not the primary language of the workers. The interpreter shall be on site at all times. |
| 2.7 RECORDS: The contractor shall be responsible for creating, maintaining, and disposing of government required documents including technical manuals, bill of ladings, receipts, parts lists, drawings, and test documents. If requested by the Governme... |
| 2.8 The contractor shall develop and put in place a safety plan prior to performing work on-site. Safety plan shall include general safety requirements, equipment/situation specific safety requirements, required PPE, lift plans, corrective action pro... |
| 2.9 SPECIAL QUALIFICATIONS: Personnel shall be proficient in the trade they are working in. Proficiency can be demonstrated by completed organizational PQS, licenses, training certificates, completed apprentice programs, degrees, and professional cer... |
| 3 SERVICES SUMMARY: |
| 4 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES: The US Government will not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic li... |