B01 - Attachment 0001 - Purchase Description MJU-75B Impulse Cartridge Cup.pdf
PDF 95 KB Posted
- Attached to
- IMPULSE CARTRIDGE CUP
- Solicitation number
- W519TC-27-Q-ICUP
About this file
This is a Purchase Description for the MJU-75B Impulse Cartridge Cup, issued by Crane Army Ammunition Activity (CAAA) on 28 October 2026.
The solicitation requires manufacturing 28,215 production units of Impulse Cartridge Cups with coined points, manufactured from aluminum alloy 6061-T6 per drawing 201719312 using coining tooling per drawing 201719314. The contractor must deliver 10 units for first article testing (FAT) within 6 weeks of contract award, followed by production quantities in two deliveries: 14,000 units at 11 weeks after FAT approval and 14,215 units at 22 weeks after FAT approval, with a required delivery date (RDD) of 30 December 2026. All parts must be annealed to 760 degrees Fahrenheit (±10°F) for 2-3 hours and cooled at 50°F per hour until below 500°F. Prior to acceptance, representative samples must undergo hydrostatic burst testing using fixture 201719315, achieving burst pressures of 1,000 ± 200 PSI at 100-400 PSI/second. The contractor must submit their burster testing procedure to CAAA for FAT approval and provide at least 14 calendar days' notice before testing to allow government oversight and validation at the contractor's facility. All deliveries require material certifications per CAAA Form 702-37 and bills of lading with applicable contract and PR document numbers. Shipments must be delivered to Crane Army Ammunition Activity, 300 Highway 361, Building 148, Crane, IN 47522, during receiving hours Monday through Thursday, 0630-1530, with Friday deliveries by prescheduled appointment only. The contractor must achieve at least conditional CMMC Level 2 Self Assessment certification at contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01 - Attachment 0005 - Lot Number Instructions.pdf | ||
| B01 - Attachment 0006 - Price Sheet.xlsx | XLSX spreadsheet | |
| B01 - Attachment 0007 - Provisions and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Description MJU-75B Impulse Cartridge Cup
28 October 2026
FAT QTY – 10 EA
Production QTY – 28,215 EA
Impulse Cartridge Cup, Coined Point per DWG 201719312 manufactured from Impulse Cartridge Cup, Blank Point DWG 201719312 using Coining Tooling per DWG 201719314
- Material: Aluminum Alloy 6061-T6, ASTM B211, Cold-finished Bar
- Dimensions apply prior to Coining Operation as specified in 201719312
- 201719314 Coining Tooling has been found to provide satisfactory coining feature in the cup.
- Annealing parameters: A. Anneal machined part to 760 degrees F +/- 10 F for 2-3 hours. B.
Cool part at a rate of 50 degrees F per hour until temp is below 500 degrees F
- The center of this feature is .012 x .002 prior to coining.
- PRIOR TO ACCEPTANCE OF COINED POINT, IMPULSE CARTRIDGE CUP (201716312),
- A REPRESENTATIVE SAMPLE SHALL BE HYDROSTATICALLY BURST TESTED AND
- OBTAIN A BURST PRESSURE IN THE RANGE OF 1,000 ± 200 PSI, ACHIEVED AT A
- RATE OF 100-400 PSI/SEC.
o A. 201719315 HYDROSTATIC BURST FIXTURE HAS BEEN FOUND TO PROVIDE A o SATISFACTORY BURSTING OF COINED CUP.
o **The Contractor will be required to submit their burster testing procedure to CAAA for approval as part of the first article testing (FAT) approval.
o **The Government reserves the right to travel to the Contractor’s facility to oversee and validate the manufacturing and testing process as part of the FAT. The Contractor shall provide the Government notice at least 14 calendar days in advance of first article testing, to provide sufficient travel planning.
- All deliveries must include material certs.
- RDD 30 DEC 2026
- Delivery schedule:
o FAT QTY 10 delivered 6 weeks after contract award.
o Production QTY completed NLT 22 weeks after FAT approval.
o Multiple deliveries requested.
▪ 14,000 delivered 11 weeks after FAT approval
▪ 14,215 delivered 22 weeks after FAT approval
• CAAA will accept earlier deliveries at no additional cost to the government.
• All deliveries require material certifications/ certificate of conformance IAW CAAA Form 702-37.
• BOL / shipping information must contain applicable contract number and applicable PR document number.
Please ship all deliveries to:
Crane Army Ammunition Activity 300 Highway 361 Building 148 Crane, IN 47522
* Receiving hours are Monday through Thursday, 0630-1530.
* Friday deliveries are only accepted by prescheduled appointment, Please call for appointments.
* Closed on all Federal Holidays.
CMMC Requirements and Implementation
Due to the phased in implementation of CMMC requirements, The contractor will be required to meet at least conditional CMMC Level 2 Self Assessment at contract award.
File details come from the government source that posted it. Updated .