B08_Attachment 0001_Product Description.pdf
PDF 1 MB Posted
- Attached to
- W519TC-26-Q-MJU7 - CUSHIONS FOR MJU76/MJU77 PROJECTS IN SUPPORT OF CRANE ARMY AMMUNITION ACTIVITY
- Solicitation number
- W519TC-26-Q-MJU7
About this file
This is a Product Description document for MJU76/MJU77 Cushion IDIQs from the Crane Army Ammunition Activity.
The solicitation covers four distinct line items for cushion components: Cushion Bottom FAT (First Article Test), Cushion Bottom Production, Cushion Support FAT, Cushion Support Production, Cushion Top FAT, and Cushion Top Production. All requested items must be commercial items per IAW (In Accordance With) drawings referenced in the product description and must meet all required specifications. Each component references specific engineering drawings: Cushion Bottom and Support items use DWG 3763AS201 REV G and DWG 3763AS202 REV G respectively, while Cushion Top items use DWG SA3976AS192 REV D. All drawings incorporate DWG 7516394 Raw Materials.
A Technical Data Package (TDP) is available but subject to EXPORT CONTROLLED, Distribution D classification, requiring Joint Certification Program (JCP) certification and United States/Canada JCP compliance for access. Contractors and all associated subcontractors must meet JCP requirements to access Distribution D documents. FAT quantities are 10 EA per item with FAT waivable for additional orders; RDD (Required Delivery Date) is 30 June 2026 for FAT items. Production MOQ (Minimum Order Quantity) is 4,879 units for Cushion Bottom Support and 9,766 units for Cushion Top Support, with production RDD of 25 August 2026. All FAT and production quantities require Government acceptance per attached quality assurance documents before production orders commence. All deliveries require material certifications/certificates of conformance, with BOL/shipping information containing applicable contract and PR document numbers. Deliveries are made to Crane Army Ammunition Activity in Crane, Indiana, with receiving hours Monday-Thursday 0630-1530 and Friday by prescheduled appointment only. The contractor must obtain and maintain CMMC Level 2 Certification by 10 November 2026 or face inability to exercise option periods or delivery orders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment 0001_Cushions Product Description IDIQ Revised.docx | DOCX document | |
| B08_Attachment 0005_RFQ Questionnaire.xlsx | XLSX spreadsheet | |
| B08_Attachment 0003_FAR 52.212-3 Alt 1.docx | DOCX document | |
| B08_Attachment 0002_IDIQ Pricing Spreadsheet_w_FAT.xls | XLS spreadsheet | |
| B08_Attachment 0007_Provisions and Clauses.pdf | ||
| B08_Attachment 0004_FAR 52.204-24.docx | DOCX document | |
| B08_Attachment 0009_Technical Data Package Information.pdf | ||
| B08_Attachment 0008_77B Cushion QASP.pdf | ||
| B08_Attachment 0006_7516394F cushion material drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .