This document is a Justification Review for an Exception to Fair Opportunity for a contract modification under the Logistics Civil Augmentation Program (LOGCAP).

The Army Sustainment Command (ASC) requests approval to extend an out-of-scope modification to Task Order W519TC-26-F-A640 under LOGCAP V Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract W52P1J-19-D-0044 with KBR Services, LLC. The modification extends the Period of Performance to ensure uninterrupted Dining Facility (DFAC) and food service operations at Doña Ana Base Camp (DABC), Fort Bliss, Texas, in support of urgent operational requirements. The U.S. Army Contracting Command – Rock Island (ACC-RI) will execute this action, with adequate funds available on the contract from additional FY26 Operations and Maintenance, Army funding. The acquisition authority cited is Revolutionary FAR Overhaul (RFO) FAR 16.507-6(b)(1), which permits exceptions to fair opportunity when agency needs are so urgent that providing fair opportunity would result in unacceptable delays. The justification establishes that KBR is the regionally aligned LOGCAP V contractor for USNORTHCOM and the only LOGCAP V contractor currently providing support in that area of responsibility. A full competitive task order process among all four LOGCAP V contract holders would require a minimum of 180 days, while the requirement demanded response within 13 days. The document details market research evaluating alternatives, including organic military capabilities, other U.S. bases, existing garrison contracts, and service suspension, all determined infeasible. The Contracting Officer certified the justification as accurate and approved the modification on November 17, 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor: KBR Services, LLC Supply/Service: Extension of LOGCAP V BLS Support, FBTX Surge Dona Ana DFAC

CUI

JUSTIFICATION REVIEW DOCUMENT

FOR EXCEPTION TO FAIR OPPORTUNITY

Supply/Service: Extension of Logistics Civil Augmentation Program (LOGCAP) Support for Mobilization Force Generation Installation Operations: Fort Bliss, Texas (FBTX)

Authority: Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 16.507-6(b)(1), Exceptions to Fair Opportunity

Prepared by: Krysten Coffman PN:520-696-4256 Contract Specialist Email: krysten.t.coffman.civ@army.mil

Contracting Officer: Alissa S. Rohm PN: 520-693-0486 Procuring Contracting Officer Email: alissa.s.rohm.civ@army.mil

Technical:

Requirements:

Reviews: I have reviewed this justification and find it adequate to support an exception to fair opportunity.

Program Manager:

CUI

Department of the Army Justification for Exception to Fair Opportunity

1a. Requiring Activity: Army Sustainment Command (ASC), Installation Management Command (IMCOM)

1b. Contracting Activity: U.S. Army Contracting Command Rock Island (ACC-RI), Rock Island Arsenal, Rock Island, IL 61299-8000.

2. Description of Action: Army Sustainment Command (ASC) requests approval for an out-of-scope modification to Task Order W519TC-26-F-A640 under Logistics Civil Augmentation Program (LOGCAP) contract W52P1J-19-D-0044 with KBR Services, LLC (KBR).This action extends the Period of Performance (PoP) from to ensure the uninterrupted provision of vital Dining Facility (DFAC) and food service operations at Doña Ana Base Camp (DABC), Fort Bliss, Texas, (FBTX) in support of urgent operational requirements. ACC-RI will execute this action against LOGCAP V Indefinite-Delivery/Indefinite-Quantity (IDIQ) multiple task order award contract W52P1J-19-D-0044 and it will be placed on the Ft. Bliss Surge Task Order W519TC-26-F-A640 to KBR for administrative convenience. Adequate funds are available on the contract. ASC provided additional FY26 Operations and Maintenance, Army funding upon the award of Task Order W519TC-26-F-A640. As such, a Notice to Proceed (NTP) was provided to KBR to continue/extend the DFAC and food service operations at Dona Ana Range Camp from

An Acquisition Plan is not required in accordance with (IAW) Defense Federal Acquisition Regulation Supplement 207.103(e) because this acquisition is included in the Principal Assistant Responsible for Contracting approved LOGCAP V program level Acquisition Plan, dated 18 December 2017. The LOGCAP V Acquisition Plan approved the use of Multiple Award IDIQs with regionally aligned Setting the Theater (STT) task orders to satisfy the guaranteed minimum. Initial service performance task orders were awarded to the regionally aligned contractor. New requirements within a theater are competed unless a JEFO approval is obtained. IAW the LOGCAP V Acquisition Strategy, Business Arrangement, requirements approved under a JEFO are sourced to the regionally aligned contractor.

On 12 April 2019, the four LOGCAP V base IDIQ contracts and multiple task orders were awarded. This included a task order award to KBR for the United States Northern Command (USNORTHCOM) STT activities, which includes crisis action planning and emerging requirements. KBR was the only contractor to receive a LOGCAP V task order in the USNORTHCOM region. Under the STT task order, the regional LOGCAP contractor conducts pre-activation planning, including efforts prior to LOGCAP being authorized to perform services, to shorten response time and establish the conditions for

CUI

successful execution of future operations. Pre-activation planning includes developing an in-depth knowledge of the area of operations, a robust vendor base with possible subcontractors, and an in-depth understanding of the geo-political environment in order to function in a multitude of possible scenarios. As stated above, KBR is the regionally aligned contractor for USNORTHCOM and is the only LOGCAP V contractor currently providing LOGCAP support in the USNORTHCOM area of responsibility (AOR). As such, the services described above supporting the FBTX will be awarded to KBR on a sole fair opportunity amongst all LOGCAP V IDIQ contract holders would have resulted in unacceptable delays to this critical requirement, which is further explained in paragraph 5 below.

3. Description of Supplies/Services: Army Regulation 700-137 established LOGCAP as a DA regulatory program to plan for and provide contracted capabilities to assist commanders in accomplishing their missions when the sustainment force structure is not available or not an option for contingency and non-contingency requirements LOGCAP V services include, but are not limited to, the following:

Camp Construction Various Health and Medical Services Facilities Management Hazardous Material/Hazardous Waste Management Vector & Pest Management Services Laundry Service Operations Food Service Operations Morale, Welfare, and Recreation Power Generation Water Production Billeting Waste and Sewage Management Material Handling Equipment Operations Maintenance Transportation Motor Pool Operations Shuttle Bus Service Class III Retail Operations Fire Fighting Services and Fire Protection Oxygen Generation Operation and Maintenance Project Planning Government Provided Automation Systems Government Support Services Mortuary Affairs Corps Logistics Services Support Material Yard Gravel Trans Load

CUI

Corps Logistics Services Support Distribution Center Central Issue Facility Self Service Supply Center Class II Bulk Fuel Operations Class V Operations Class VIII Medical Supply Support Activity Class IX (Air) Supply Support Activity Field Maintenance Theater Transportation Mission Airfield Operations and Management Services Theater Transportation Recovery Operations Theater Movement Control Container and Cargo Management Convoy Support Center Defense Logistics Agency Contingency Support Retrograde Procurement and Supply management Repair Roads, Railways, or Parking Lots Agricultural Cleaning in Support of Retrograde Operations Redeployment Staging Base Operations

This requirement is to modify the Base PoP established on Task Order W519TC-26-F- A640 to continue DFAC services at DABC to support the remaining personnel population and final demobilization activities.

The proposed modification extends the Task Order base PoP and will not include an option provision. This extension directly aligns with FBTX remaining personnel support requirements and contractor demobilization timelines. Specifically, active DFAC operations at DABC will be extended

4. Authority Cited:

RFO FAR 16.507-6(b)(1). The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

5. Reason for Authority Cited:

RFO FAR 16.507-

CUI

multiple task or delivery order contracts are awarded, all awardees shall be provided a fair opportunity to be considered for each task or delivery order that is to be issued. 10 U.S.C. 3406(c)(1), and RFO FAR 16.507-6(b)(1) provide an exception to the fair opportunity process when the agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

b. , IMCOM issued a memorandum titled LOGCAP Extension , establishing an urgent requirement to maintain DFAC and food service operations at DABC, FBTX This operational extension is critical to sustaining military and civilian personnel who must remain stationed at DABC past the originally scheduled The urgent and compelling necessity to limit fair opportunity on this order stems from unexpected, compounding troop influxes and continuous operational build-ups across the installation. This surge has fully saturated and exhausted all organic military life-support, culinary, and garrison feeding capabilities. Competing this requirement under full fair opportunity would create an unacceptable break in essential food services, directly threatening the health, welfare, morale, and mission readiness of remaining warfighters.

CUI

c. The urgent and compelling nature of this action, driven by an acute requirement to sustain life support operations for at DABC, FBTX, necessitates an immediate LOGCAP V is the only viable contract vehicle capable of ensuring seamless, uninterrupted DFAC operations and force health sustainment. The incumbent contractor is currently mobilized and actively executing full-spectrum food service operations on-site. Awarding this four-day bridge to any source other than the incumbent would cause an unacceptable break in essential food service, critically compromising troop welfare, morale, and force protection.

Furthermore, relying on existing local contract vehicles is impossible.

Finally, suspending or delaying support to execute a standard, full-and-open contract competition is entirely unacceptable as historical data for similar urgent actions shows it would take at least 18 months.

Therefore, LOGCAP V is the sole instrument capable of rapidly delivering the required surge capacity and distributed infrastructure to safeguard soldier welfare and guarantee mission readiness.

d. The LOGCAP V competition required all offerors to demonstrate a global capability.

This means that all four LOGCAP V contract holders are capable of performing the required services. However, due to the immediate support required for the mobilization and demobilization operations at FBTX, there is insufficient time to conduct a task order competition under LOGCAP V using fair opportunity procedures. The request to extend the PoP was not defined or formally requested until , leaving less than 13 days until the target date for full operational capability LOGCAP performance. Based on similar LOGCAP procurements, it would take at least 180 days for ACC-RI to compete the requirement amongst the four LOGCAP V contract holders. This encompasses a minimum of 30 days to provide adequate time to request and receive proposals from the four LOGCAP V contract holders, followed by evaluations, meaningful exchanges (if required), task order award, debriefings, and potential protests.

As such, KBR, as the regionally aligned contractor for USNORTHCOM and the only LOGCAP V contractor currently providing LOGCAP support in the USNORTHCOM AOR, can provide this urgent requirement without an unacceptable delay.

e.

CUI

6. Actions to Increase Competition: ACC-RI will conduct task order competitions for new, emerging requirements under LOGCAP V using fair opportunity procedures when conditions permit. At this time, the U.S. Government believes this is a one-time requirement, and as such does not anticipate an enduring situation that would justify a future competition among LOGCAP V multiple award IDIQ contract holders.

Consideration will be given to the Randolph Sheppard Act (RSA) if the requirements within this JEFO become sustaining, to include additional market research. ACC-RI recognizes the RSA provides priority to blind vendors when competing full food service dining facility requirements.

7. Market Research: The following actions were evaluated in November 2026 for feasibility as an alternative to this justification:

a) Use of Organic Military Capabilities: The military does not possess sufficient organic logistics assets or culinary personnel at FBTX to absorb an unexpected surge for DFAC and food service operations for an additional

b) Utilization of Other U.S. Bases/Camps: The utilization of other U.S. bases/camps were taken into consideration, and some units were sent to Camp Atterbury and Fort Hood. However, the units affected need to remain near a CRC location to deploy when needed. Camp Atterbury and FBTX are the only two CRC locations, making other U.S.

bases/camps unacceptable for use.

CUI

c) Utilization of Existing Installation Garrison Contracts: Existing BOS and local service contracts at FBTX lack the required scope, contract ceiling, surge capacity, and geographically distributed food service infrastructure needed to support over on short notice.

d) Suspension or Deferral of Services: Suspending or delaying support until a full competition can occur is unacceptable, as it would immediately deprive soldiers of essential life support, violating basic health, sanitation, and nutritional standards while creating a critical bottleneck in the deployment pipeline.

e) Compete Requirement amongst other LOGCAP V Contractors: While other LOGCAP V contractors are technically capable, KBR is uniquely qualified as the only as they are currently providing DFAC and food service operations at DABC, FTBX due to the mobilization/demobilization surge. Awarding to another contractor would require a task order competition, creating unacceptable delays through administrative lead times and mobilization lag. Utilizing KBR, the active USNORTHCOM provider, leverages an established regional footprint to guarantee immediate, seamless support.

8. Other Facts:

Procurement History

Contract Vehicle/Contra ct Type

Contract Number

Award Date

Competitively Awarded (Y/N), Authority if restricted/JEFO Control No.

Awardee/ Contract or

Current Award Expires

Dollar Value

IDIQ/CPFF W52P1J-19-D-

0044/W519TC-

25-F-0183

4/14/25 N / JEFO 25-025 KBR 6/30/25

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 21-F-0422

8/24/21 N / JEFO 21-114 KBR 9/24/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 20-F-0485 / P00014

7/9/20 N / JEFO 21-065 KBR 7/9/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 21-F-0327

5/20/21 N / JEFO 21-094 KBR 8/25/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 20-F-0485 / P00003

10/16/20 N / JEFO 21-004 KBR 7/9/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 20-F-0485

11/23/20 N / JEFO 21-004 KBR 7/9/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J-

8/7/20 N / JEFO 20-100 KBR 7/9/21

CUI

20-F-0485 / P0001

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 20-F-0539

8/13/20 N / JEFO 20-099 KBR 8/16/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 20-F-0485

7/10/20 N / JEFO 20-090 KBR 7/9/21

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 19-F-0395

4/12/19 Y KBR 3/2/30

IDIQ/CPFF W52P1J-19-D-

0044 / W52P1J- 19-F-0396

4/12/19 Y KBR 9/11/25

IDIQ/CPFF W52P1J-19-D-

4/12/19 Y KBR 3/2/30

CUI

9. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

10. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

11. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable. A technical evaluation and cost analysis will be conducted on the proposal. Certified cost and price data will not be required.

Alissa S. Rohm Contracting Officer

12. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Alissa S. Rohm Contracting Officer

CUI

Approval

Based on the foregoing justification, I hereby approve the out-of-scope modification to to ensure the uninterrupted provision of vital DFAC and food service operations at DABC, FBTX using an exception to fair opportunity pursuant to the authority of FAR 16.507-6(b)(1), the agency need for the supplies or services are so urgent that provided a fair opportunity would result in unacceptable delays.

The approval is subject to availability of funds, and provided that the services or supplies herein described have otherwise been authorized for acquisition.

Signature:

ALISSA S. ROHM

Contracting Officer