Attachment 0001 Concrete Mtg Pads MAP (25-06-11).pdf

PDF 725 KB Posted

Attached to
Concrete Pad Federal contract opportunity
Solicitation number
W519TC25QA062
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a detailed technical drawing set for concrete mounting pads at the Rock Island Arsenal Joint Manufacturing and Technology Center (RIA JMTC), specifically covering multiple building locations (B220 Annex, B222 Pit Fill & Cap, and Gun Drill Location). The drawings provide comprehensive engineering specifications for constructing concrete mounting pads, including precise dimensional details, concrete requirements (5000 PSI minimum), rebar mesh placement (#5 rebar 6" from top and bottom surfaces), expansion joint materials (BASF Sonolastic SL-1 or equivalent), and specific installation instructions.

Key technical requirements include maintaining existing concrete elevation with no more than 1/4" deviation, using CA6 aggregate, implementing 3/4" expansion joints, and following specific construction protocols such as dust control, equipment use, and site preparation. The project involves creating machine mounting pads with varying configurations, including a recessed 28' x 12' x 3" pit with grid-step grated flooring, and filling an existing 65-inch deep area well with sand and capping with approximately 12" of 4000 PSI concrete. The drawings are part of a solicitation (W519TC25QA062) by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal, with a distribution statement allowing public release and unlimited distribution.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Pad, newest first.
File Type Posted
B08 Solicitation - W519TC25QA062.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL LOCATIONS

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

DMG CONCRETE MOUNTING PADS

SHEET 1 OF 8B. McCLURE B. NILES

NONE

8HEAT TREAT PIT FILL & CAP

7GUN DRILL PAD DETAIL

6ELEVATION/CONSTRUCTION PLAN

5SLAB HORIZ/VERT PLAN

4LOCATION/LAYOUT PLAN

3CONTRACTOR SECURITY NOTES

2GENERAL NOTES

1GENERAL LOCATIONS

INDEX

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X

M I S S

I P P

I R

I V E R

LOCATIONS ON ROCK ISLAND ARSENAL

X

X

X

X

X

X

X X

X X

X

X X

X

X X X X X X X X X X X

X X

X

X

X

X X X

X

X

X

X

X X

X

X

X

X

X

X X

X

X X

X

X

21 29

30-G

70-G

2-G 3-G

4-G

6-G

50 52

62 64

102 104

157120144

301-G

314 312

220210

332333

204203

R O

C K

IS

L

A N

D

U .S . G

O V

E R

N M

E N

T

B R I D

G E

PARKING

RODMAN

D A V E N P

O R T

G

IL

L E

S P

IE

KINGSBURY

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TERRACE

PARKING PARKING PARKING

HEDGE

LANE

SOUTH AVENUE

NORTHAVENUE

PARKING

PARKING

PARKING

PARKING

E

A S

T

RODMAN

DRIVE

BECK

SYLVAN

AV

EN

U E

KING

DRIVE

SHED

B L U

N T

R O

A D

PROSPECT

DRIV

E

D R

IV

E

C E

M E T E R

Y

D R

IV

E

DYKE

ROAD

R O

D M

AN

BLUNT

PARKING

PARKING

PARKING

PARKING

PARKING

79 83

S Y

V N

R

IV

E

AVE

BAUMBECK AVENUE

216212

LO

C

K

AND

DAM

NO

. 1

BETTENDORF

DAVENPORT

MOLINE

ROCK ISLAND

C A N A L

M

O

L

I N

E

S L O U G H

E. RIVER DR. GRANT ST.

2ND ST.

4TH ST.

3RD ST.

STATE ST.

PC

X

XX

X

X

X

X

X

X X

X

X X

X

X X

X X

X

X

X

X

X

X X

X

BLDG 222 PIT FILL & CAP

ELEC. EQUIP

DN

DOCK

AREA WELL

D N

AREA WELL

G

F

E

D

C

B

A

654321 13121110987 14

P2 P3

O2 O3

1 2 3 4 5 6 7 8 9 10 11 b a c

RAMP

ROLL - UP

OPEN WELL

BLDG 220 ANNEX MACHINE MOUNTING PADS

bradley.niles Rectangle bradley.niles Polygon bradley.niles Line bradley.niles Line bradley.niles Line bradley.niles Line

GENERAL NOTES

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

DMG CONCRETE MOUNTING PADS

SHEET 2 OF 8B. McCLURE B. NILES

NONE

MANUAL PROCESSES.

ACCESS WITH COMMERCIAL CONCRETE PUMPING OR POWER DOLLY OR

10. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK SITE

OR TRUCK AGITATORS HALL BE ACCORDING TO THE FOLLOWING:

THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS

DISCHARGING.

WITHOUT THE ADDITION OF WATER OR WATER AND CEMENT PRIOR TO

WORKABLE CONDITION, SATISFACTORY FOR PLACEMETN IN THE WORK

SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND

9. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATIORS

SATURDAYS. FRAMING, TYING REBAR AND POURING WITH BE DAY SHIFT.

ON 2ND SHIFT STARTING FROM 2:30 TO 11:00 AT NIGHT OR

8. DEMOLITION/JACK HAMMERING/REMOVAL WILL BE PERFORMED

SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.

RIGID FOAM INSULATION FOR VIBRATION ISOLATION. JOINT SEALANT

CLEAN UP IS COMPLETE, LINE MOUNTING PADS AND CAPS WITH 3/4"

7. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL. AFTER

SHALL BE A MINIMUM OF 5000-PSI.

6. NEW CONCRETE FOR MACHINE MOUNTING PADS AND CAPS

CONVERTER ON ALL DIESEL ENGINES.

USED ARE GAS ENGINES. CONTRACTOR SHALL HAVE CATALYTIC

5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE IF EQUIPMENT

REGULATIONS.

CONCRETE AND REBAR FROM RIA IN ACCORDANCE WITH LOCAL

BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD BLOCKS,

4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH AS

OR THE UNDERLYING SOIL CAUSED BY THE CONSTRUCTION.

3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO FLOOR

PRESENT MUST BE CUT OFF EVEN WITH SAW CUTS.

2. WHEN SAW CUTTING AROUND THE WORK AREA, REBAR

DUST DURING ENTIRE DEMOLITION AND CONSTRUCTION.

1. THE CONTRACTOR WILL USE WATER TO ELIMINATE DUST

OF DISCHARGE deg-F (deg-C)

CONCRETE TEMPERATURE AT POINT

HAUL TIME

HOURS MINUTE

50-64 (10-17.5)

65-90 (18-32) - WITHOUT RETARDER

1 30

1 3065-90 (18-32) - WITH RETARDER

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

MANUAL PROCESSES.

ACCESS WITH COMMERCIAL CONCRETE PUMPING OR POWER DOLLY OR

10. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK SITE

OR TRUCK AGITATORS HALL BE ACCORDING TO THE FOLLOWING:

THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS

DISCHARGING.

WITHOUT THE ADDITION OF WATER OR WATER AND CEMENT PRIOR TO

WORKABLE CONDITION, SATISFACTORY FOR PLACEMETN IN THE WORK

SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND

9. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATIORS

SATURDAYS. FRAMING, TYING REBAR AND POURING WITH BE DAY SHIFT.

ON 2ND SHIFT STARTING FROM 2:30 TO 11:00 AT NIGHT OR

8. DEMOLITION/JACK HAMMERING/REMOVAL WILL BE PERFORMED

SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.

RIGID FOAM INSULATION FOR VIBRATION ISOLATION. JOINT SEALANT

CLEAN UP IS COMPLETE, LINE MOUNTING PADS AND CAPS WITH 3/4"

7. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL. AFTER

SHALL BE A MINIMUM OF 5000-PSI.

6. NEW CONCRETE FOR MACHINE MOUNTING PADS AND CAPS

CONVERTER ON ALL DIESEL ENGINES.

USED ARE GAS ENGINES. CONTRACTOR SHALL HAVE CATALYTIC

5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE IF EQUIPMENT

REGULATIONS.

CONCRETE AND REBAR FROM RIA IN ACCORDANCE WITH LOCAL

BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD BLOCKS,

4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH AS

OR THE UNDERLYING SOIL CAUSED BY THE CONSTRUCTION.

3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO FLOOR

PRESENT MUST BE CUT OFF EVEN WITH SAW CUTS.

2. WHEN SAW CUTTING AROUND THE WORK AREA, REBAR

DUST DURING ENTIRE DEMOLITION AND CONSTRUCTION.

1. THE CONTRACTOR WILL USE WATER TO ELIMINATE DUST

22. IN PAD NUMBER 5, THERE WILL BE A RECESSED MACHINE BASE.

SYSTEM.

CONTAINED WITH CONTAINMENT BALES TO AVOID RUNOFF INTO STORMWATER

APPROVED WITH THE COR PRIOR TO PLACING. AREA MUST BE

21. ANY DIRT, ROCKS OR DEBRIS TO BE PLACED OUTSIDE MUST BE

RIA REPRESENTATIVES IMMEDIATELY.

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

20. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND

OTHER EMBEDDED ITEMS AND INTO FORMS.

SO THAT CONCRTE IS WORKED AROUND REINFORCING AND

VIBRATING EQUIPMENT WITH HAND RODDING AND TAMPING

19. CONSOLIDATE PLACED CONCRETE USING MECHANICAL

PERFORMED BY COMPETENT, EXPERIENCED, QUALIFIED WORKMEN.

(AISC) STANDARDS AND SPECIFICATIONS. ALL WORK SHALL BE

COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL CONSTRUCTION

18. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL SHALL

OF THE EXISTING CONCRETE.

DOWELS WILL BE DRILLED A MINIMUM OF 6" INTO THE VERTICAL FACE

BOTTOM SURFACE AND HAVE A MINIMUM OF 2 RODS IN EACH DIRECTION.

SPACING. REBAR SHOULD BE A MINIMUM OF 4" AWAY FROM TOP OR

17. DOUBLE TIED LAYERS OF #5 REBAR MESH (5/8"). 12" X-W

COMPLETION OF THE PROJECT.

16. CONTRACTOR SHALL CLEAN UP THE WORKSITE AFTER

SITE UNDER CONSTRUCTION.

15. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB

PEDESTRIAN INTERACTIONS.

WITHIN THE BUILDING TO ENSURE SAFE TRAFFIC AND

EQUIPMENT/TRUCKS GOING IN/OUT OF THE BUILDING AND

14. CONTRACTOR WILL PROVIDE SPOTTER/GROUND MAN FOR

GRADE TO ALLOW FOR PROPER GROUNDING OF MACHINE.

INTO MOUNTING PADS AND LEFT EXPOSED 6-INCHES ABOVE

13. CONTRACTOR WILL PROVIDED ONE GROUND ROD DRIVEN

UTILIZE PROPER PPE.

SAFETY RULES OF THE TRAD AND ENSURE ALL PERSONNEL

12. CONTRACTOR WILL FOLLOW AND APPLY ALL STANDARD

REPRESENTATIVE FOR GATE PASS AND FUNCTIONALITY.

11. CONTRACTOR WILL COORDINATE WITH CONTRACTING OFFICER

THE PIT.

TO BE REMOVEABLE TO ALLOW MAINTENACE/CLEANING OF

MAY SPILL FREE FLOW THROUGHOUT THE PIT. GRATES NEED

ON 1 INCH LIFTS OFF THE FLOOR TO ALLOW LIQUIDS THAT

PLACED AND HAVE GRID-STEP GRATED FLOORING INSTALLED

BY 3 INCHES DEEP. THE RECESSED PIT WILL HAVE MACHINE

THE RECESSED PIT WILL BE 28 FEET LONG X 12 FEET WIDE

The RAMP program is discussed in the RIA-JMTC AT training.

Department.

Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).

Contractor personnel working on Rock Island Arsenal are subject to participation in change.

The COR will keep the contractors informed on the current FPCON or any possible FPCON

The FPCON descriptions will be provided in the RIA-JMTC AT training.

threat. Services will resume when FPCON level is reduced to level Bravo or lower.

During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.

The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.

Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.

within 24 hours of no longer being needed. Items will returned to the COR or

RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.

IF00015 IF00015 at the end of the contract or the last day of an individual

Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause

Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.

will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR

(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate

Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.

all employees on the local iWATCH program. The iWATCH

The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.

Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.

needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being

RIA-JMTC electronic keys and access passes are accountable individual contractor�s employment.

IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.

Form thru the RIA Directorate of Emergency Services.

guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.

individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.

to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.

Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.

Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

DMG CONCRETE MOUNTING PADS

SHEET 3 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

RAMP

B220 ANNEX LAYOUT

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

DMG CONCRETE MOUNTING PADS

SHEET 4 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

wall.

marked in red on the west drawing with the grate lines on the cooresponding

Tunnel is shown in dashed area of the tunnel. The avoid high impact over the lifted out of location to will need to be cut and exisitng concrete. The slab during removal of the area, caution will be used existing concrete. In this surface grade of the west roughly 8 ft below the a tunnel that runs east and there is an access grate to and 6 on the west wall, Located between column 5 slope.

grades at less than a 1%

/sloped to meet the two greade will be blended of slab 4 by the stairs the near the south east corner meets existing concrete, In areas where the new slab column 2-3 B.

corner of the area from located on the north-east current existing slab be based level with the

Elevation of the slabs will

NOTES:

18ft

6ft

20ft

22ft

20ft 7in

28ft

28ft

28ft 5in

20ft

28ft

21ft

29ft

57ft

4ft 5in

2ft

12ft

GUN DRILL LOCATION

COLUMN LINE A9

CURRENT VIEW CUT LINE VIEW

1" EXPANSION JOINT

4"-8" EXISTING CONCRETE 4"-8" EXISTING CONCRETE

NEW MOUNTING PAD

DEMO AS NEEDED TO INSTALL

DISTURBED.

THICK. BUILDING COLUMNS AND FOOTINGS WILL BE AVOIDED AND NOT

EXISTING CONCRETE FLOORS THAT ARE BETWEEN 4" AND 8"

NOTE: LATHE MOUNTING PADS WILL REQUIRE REMOVAL OF

B220 ANNEX ELEVATION/CONSTRUCTION PLAN

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 5 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

B220 ANNEX ELEVATION/CONSTRUCTION PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 6 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

4"-8" EXISTING CONCRETE

#5 REBAR MESH 6" FROM TOP AND BOTTOM SURFACES.

CA6

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

ELEVATION.

THE FINAL 12" CAN BE SLOPED TO MEET THE EXISTING

OVER 10'. IF THIS CANNOT MEET EXISTING CONCRETE

MUST MAINTAIN NO GREATER THAN 1/4" DEVIATION

ALWAYS BE THE SAME ELEVATION. MOUNTING PADS

AREA SURROUNDING MOUNTING PADS WILL NOT

NOTE:

5000 PSI CONCRETE

12 IN

24 IN

#5 REBAR MESH 6" FROM TOP AND BOTTOM SURFACES.

CA6

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

5000 PSI CONCRETE

12 IN

24 IN

3 INCH DEPRESSION 12 FT X 28 FT

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

GUN DRILL RECESSED PAD

SHEET 7 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

ELEVATION/CONSTRUCTION PLAN

220 GUN DRILL MOUNTING LOCATION

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

B222 PIT FILL & CAP

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

06-JUN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

DMG CONCRETE MOUNTING PADS

SHEET 8 OF 8B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

AREA WELL

G

F

E

D

19ft 6in

6ft 6in 12ft 5in

17ft 9in

7ft 9in

30-in DEEP

65-in DEEP

12" EXISTING CONCRETE

SAND

CREATE A SAFE EDGE TO AVOID TRIPPING HAZARD

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT 4000 PSI MINIMUM CONCRETE

FILL PIT WITH SAND AND CAP WITH APPROXIMATELY 12" OF CONCRETE