B08 QAPs.pdf
PDF 469 KB Posted
- Attached to
- Helical Springs Federal contract opportunity
- Solicitation number
- W519TC25Q2005
About this file
This document is a Quality Assurance Provision (QAP) detailing the quality assurance requirements for helical compression springs used in the 105mm Howitzer, Light, Towed, M119A1/A2/A3. The QAP covers critical, major, and minor characteristics of the springs, including requirements for hardness testing, magnetic particle inspection, dimensional inspections, and an operational test. Certification requirements are specified for the spring material, manufacturing, heat treatment, and other processes. The QAP references drawing 12593036/12593037 and MIL-STD-1916 for test methods and inspection procedures.
The related federal contract opportunity is a solicitation (W519TC25Q2005) from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for the procurement of these helical springs. The solicitation is restricted to the two approved sources identified on the drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 25Q2005-0001.pdf | ||
| 25Q2005-0001 conformed.pdf | ||
| B08 Helical Spring Drawings.pdf | ||
| 25Q2005 LSJ_Redacted.pdf | ||
| B08 25Q2005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE PROVISIONS (QAP)
(DARCOM-R-702-10)
1. COMMAND AGENCY:
U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER
PICATINNY ARSENAL, NJ 07806-5000
2. THESE QAP�S FORM PART OF DRAWING/SPECIFICATION 12593036 AS SPECIFIED IN THE CONTRACT.
INSPECTION SHALL BE CONDUCTED AS SPECIFIED HEREIN AND IN ACCORDANCE WITH REFERENCED DOCUMENTS.
3.
PART I. LIST OF APPLICABLE DOCUMENTS
DRAWINGS
12593036 Spring, Helical Compression
STANDARDS
MIL-STD-1916 DoD Preferred Methods for Acceptance of Product
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
4. RELEASE
NUMBER L07A2002 L13A2003
5. DATE 070130 130212
4.RELEASE
NUMBER
5. DATE
REVISION
STATUS
OF
SHEETS
6. REVISION B B B B B
7. SHEET 1 2 3 4 5
8. REVISION
7. SHEET
8. QAP FOR:
Spring, Helical Compression: Howitzer, Light, Towed, 105mm, M119A1/A2/A3
CAGE CODE
19200
9. SUBMITTED BY:
RDAR-QEW-B
10. QAP NO.:
12593036
11. DATE:
981007
12. APPROVED: 13. RELEASE NO. :
G6A9191
14. PAGE NO.:
15. NO. OF PAGES:
QUALITY ASSURANCE PROVISION (QAP)
3.
PART II. CONFORMANCE PROVISIONS
1. General provisions.
1.1 Classification of characteristics. There are three classes of characteristics covered in this QAP. These are:
Critical Characteristics, Major Characteristics, and Minor Characteristics, as defined in MIL-STD-1916.
1.2 Workmanship. All parts shall be fabricated and finished in a thorough, workmanlike manner and all manufacturing, processing and assembly shall be correctly performed. The parts shall be clean and free of burrs, sharp edges, unblended radii, surface defects, cracks, chips, dirt, grease, oil (except where specifically required), rust, foreign matter or any evidence of poor workmanship that could render the system unsuitable for its intended purpose.
1.3 Certification provisions.
1.3.1 Certificate of conformance (COC). A certificate of conformance is required for Military Standard and commercial items, supported by inspection and test data, material analysis, or certification from the raw material producer or processor, and shall be made available to the Government for specifications covering raw material, processed material, and processes. The contractor shall make the COC available to the Government prior to or with the request to perform acceptance inspection approval by the Government. This is in addition to, and not in lieu of, any rights of the Government under this contract or law. A COC may be used as an element incident to, but shall not be used as the sole basis for, Government acceptance of contract item(s) unless so indicated in the technical documentation or contract. As a minimum, the COC shall contain the following:
a. Name of company and date.
b. Contract number or purchase order number, national stock number and drawing number.
c. Complete nomenclature of supplies together with lot number or other identification. The quantity in each lot or shipment shall be given.
d. A statement, as follows, certifying that material meets all requirements of the contract:
�The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate conforms to all contract requirements (including but not limited to the drawings and specifications); the analyses appearing herein are true and accurate analyses; and this certificate is made for the purpose of inducing payment and with knowledge that the information and certification may be used as a basis for such payment.�
e. Signature and title of certifying official.
1.3.2 Certified test reports (CTR). When specified in the contract or in documents referenced herein, the contractor shall make available to the Government a CTR for each lot of parts, assemblies, subsystems and systems by lot number prior to acceptance. This test report is in addition to, and not in lieu of, any rights of the Government under this contract or law. A CTR may be used as an element incident to, but shall not be used as the sole basis for, Government acceptance of contract item(s) unless so indicated in the technical documentation or contract. As a minimum, the report shall contain the following:
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593036
11. PAGE NO.
3.
PART II. CONFORMANCE PROVISIONS (CONT�D)
a. Name of company and date.
b. Contract number or purchase order number, national stock number and drawing number.
c. Complete nomenclature of supplies together with lot number or other identification. The quantity in each lot or shipment shall be given
d. All inspections and tests required by contract (i.e., material, processes, performance, functional, etc.) shall be recorded in test reports. These reports shall identify each lot submitted for acceptance by lot number, the specification or drawing, revision and date, grade or type as applicable, number of specimens tested, specified characteristics and requirements, and actual results obtained.
e. Reports of the raw material producer�s chemical, mechanical, and physical analysis.
f. A statement, as follows, certifying that material meets all requirements of the contract:
�The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate conforms to all contract requirements (including but not limited to the drawings and specifications); the analyses appearing herein are true and accurate analyses; and this certificate is made for the purpose of inducing payment and with knowledge that the information and certification may be used as a basis for such payment.�
g. Signature and title of certifying official.
2. First article inspection.
2.1 Submission. Unless otherwise specified, a first article sample consisting of three (3) springs shall be submitted for inspection and approval in accordance with the terms of this contract. The sample items will be subjected to any or all of the conformance inspections listed in Part III of this QAP and may be inspected for compliance with any or all of the requirements of the applicable drawing(s) and specification(s). The certification requirements of Part IV apply.
2.2 Rejection. If any sample item fails to comply with any of the applicable requirements, the First Article sample shall be rejected. The Government reserves the right to terminate inspection upon any failure to comply with any of the requirements.
3. Verification. Verification inspection shall consist of inspection of all conformance characteristics contained in Part III, Inspection Requirements, and Part IV, Certification Provisions, of this QAP. Failure to comply with the conformance criteria specified shall be cause for rejection of the lot or quantity represented.
3.1 Lot formation. Inspection lots shall comply with the lotting requirements of MIL-STD-1916, paragraph 4.2.
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593036
3.
PART II. CONFORMANCE PROVISIONS (CONT�D)
3.2 Attributes sampling inspection. The provisions/procedures of MIL- STD-1916 are applicable to this QAP. Unless otherwise specified, attributes sampling for the conformance characteristics listed in Part III herein shall be in accordance with MIL-STD-1916, Table II, using the verification level cited in the conformance criteria columns of Part III. The procedure in MIL-STD-1916 for normal inspection shall be used at the start of production for current or previous suppliers of the item. For all new suppliers of the item, tightened inspection shall be used at the start of production and be continued until the criteria for normal inspection are met.
3.3 Alternative verification provisions. Unless otherwise specified, alternative verification provisions, such as statistical process control (preferred), variables or continuous sampling plans, may be used by the contractor in lieu of the inspection provisions contained herein when such alternative(s) provide an equivalent or better level of quality, and provided they have been described in a written proposal which has been approved by the Government.
3.4 Inspection equipment. Unless otherwise specified herein or the contract, all inspection equipment required to perform the examinations and tests in this QAP shall be designed, documented and maintained by the contractor, including any fixtures necessary to accommodate the test procedures. Inspection equipment shall incorporate the appropriate measurement capability, precision and accuracy to assure rejection of all nonconforming product.
PART III. INSPECTION REQUIREMENTS
1. Classification of conformance characteristics.
CLASS CHARACTERISTIC ZONE CONFORMANCE INSPECTION
CRITERIA METHOD
CRITICAL: None
MAJOR:
101 Hardness test Note 7 II SMTE 102 Magnetic particle inspection Note 5C 100% SMTE 103 Bar diameter B3 II SMTE 104 Ends closed and ground square to the axis of the spring Note 5B II SMTE
MINOR:
201 Surface roughness, 63 (2 places) C6, C4 I SMTE 202 Total coils B3 I Visual 203 Loose surface scale Note 5D I Visual 204 Spring, left hand wound D5 I Visual 205 Inner diameter B3 I SMTE 206 Protective finish missing or defective Note 12 I Visual 207 Item identification missing, illegible or incorrect Note 10 I Visual 208 Workmanship All I Para. 1.2
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593036
3.
PART III. INSPECTION REQUIREMENTS (CONT�D)
2. Special sampling instruction. The contractor shall randomly select 2% of the spring lot. The test samples shall be subjected to the following test specified in 501. Minimum sample size is one item.
CLASS CHARACTERISTIC ZONE INSPECTION METHOD
301 Operational test B3 501
2.1 Failure. In a case of a failure of any item to meet the specified test requirements, acceptance of the product shall be suspended until the necessary corrections have been made by the contractor and approved by the Government.
PART IV. CERTIFICATION PROVISIONS
1. The certification provisions of paragraph 1.3 shall apply. Certifications are required for the following:
NUMBER CHARACTERISTIC CERTIFICATION METHOD TEST DATA TO COMPLY WITH
401 Material Certificate of Conformance Dwg. 12593036, Note 2 402 Spring manufacturing Certificate of Conformance Dwg. 12593036, Note 5 403 Decarburization Certificate of Conformance Dwg. 12593036, Note 5A 404 Heat treatment and presetting Certificate of Conformance Dwg. 12593036, Note 6 405 Shot peening Certificate of Conformance Dwg. 12593036, Note 9 406 Oil application Certificate of Conformance Dwg. 12593036, Note 11 407 Spring rate range Certificate of Conformance Dwg. 12593036, Zone B3 408 Protective finish Certificate of Conformance Dwg. 12593036, Note 12 409 Operational test Certified Test Report Dwg. 12593036, Zone B3
PART V. TEST METHODS AND PROCEDURES
501 Operational Test. The free length, load at assembled height and load at operating height shall be measured.
After this measurement compress the spring five times to the operating height. Upon the fifth compression hold for a period of one week (168 hours). Upon compression of the hold period, the free height, load at assembled height and at operating height shall be measured. Failure to meet the drawing requirements, prior to or after this test, shall be cause of rejection of the lot.
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593036
QUALITY ASSURANCE PROVISIONS (QAP)
1. COMMAND AGENCY:
U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER
PICATINNY ARSENAL, NJ 07806-5000
2. THESE QAP�S FORM PART OF DRAWING/SPECIFICATION 12593037 AS SPECIFIED IN THE CONTRACT.
INSPECTION SHALL BE CONDUCTED AS SPECIFIED HEREIN AND IN ACCORDANCE WITH REFERENCED DOCUMENTS.
3.
PART I. LIST OF APPLICABLE DOCUMENTS
DRAWINGS
12593037 Spring, Helical Compression
STANDARDS
MIL-STD-1916 DoD Preferred Methods for Acceptance of Product
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
4. RELEASE
NUMBER L07A2002 L13A2003
5. DATE 070130 130212
4.RELEASE
NUMBER
5. DATE
REVISION
STATUS
OF
SHEETS
6. REVISION B B B B B
7. SHEET 1 2 3 4 5
8. REVISION
7. SHEET
8. QAP FOR:
Spring, Helical Compression: Howitzer, Light, Towed, 105mm, M119A1/A2/A3
CAGE CODE
19200
9. SUBMITTED BY:
RDAR-QEW-B
10. QAP NO.:
12593037
11. DATE:
981007
12. APPROVED: 13. RELEASE NO. :
G6A9191
14. PAGE NO.:
15. NO. OF PAGES:
3.
PART II. CONFORMANCE PROVISIONS
1. General provisions.
1.1 Classification of characteristics. There are three classes of characteristics covered in this QAP. These are:
Critical Characteristics, Major Characteristics, and Minor Characteristics, as defined in MIL-STD-1916.
1.2 Workmanship. All parts shall be fabricated and finished in a thorough, workmanlike manner and all manufacturing, processing and assembly shall be correctly performed. The parts shall be clean and free of burrs, sharp edges, unblended radii, surface defects, cracks, chips, dirt, grease, oil (except where specifically required), rust, foreign matter or any evidence of poor workmanship that could render the system unsuitable for its intended purpose.
1.3 Certification provisions.
1.3.1 Certificate of conformance (COC). A certificate of conformance is required for Military Standard and commercial items, supported by inspection and test data, material analysis, or certification from the raw material producer or processor, and shall be made available to the Government for specifications covering raw material, processed material, and processes. The contractor shall make the COC available to the Government prior to or with the request to perform acceptance inspection approval by the Government. This is in addition to, and not in lieu of, any rights of the Government under this contract or law. A COC may be used as an element incident to, but shall not be used as the sole basis for, Government acceptance of contract item(s) unless so indicated in the technical documentation or contract. As a minimum, the COC shall contain the following:
a. Name of company and date.
b. Contract number or purchase order number, national stock number and drawing number.
c. Complete nomenclature of supplies together with lot number or other identification. The quantity in each lot or shipment shall be given.
d. A statement, as follows, certifying that material meets all requirements of the contract:
�The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate conforms to all contract requirements (including but not limited to the drawings and specifications); the analyses appearing herein are true and accurate analyses; and this certificate is made for the purpose of inducing payment and with knowledge that the information and certification may be used as a basis for such payment.�
e. Signature and title of certifying official.
1.3.2 Certified test reports (CTR). When specified in the contract or in documents referenced herein, the contractor shall make available to the Government a CTR for each lot of parts, assemblies, subsystems and systems by lot number prior to acceptance. This test report is in addition to, and not in lieu of, any rights of the Government under this contract or law. A CTR may be used as an element incident to, but shall not be used as the sole basis for, Government acceptance of contract item(s) unless so indicated in the technical documentation or contract. As a minimum, the report shall contain the following:
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593037
3.
PART II. CONFORMANCE PROVISIONS (CONT�D)
a. Name of company and date.
b. Contract number or purchase order number, national stock number and drawing number.
c. Complete nomenclature of supplies together with lot number or other identification. The quantity in each lot or shipment shall be given
d. All inspections and tests required by contract (i.e., material, processes, performance, functional, etc.) shall be recorded in test reports. These reports shall identify each lot submitted for acceptance by lot number, the specification or drawing, revision and date, grade or type as applicable, number of specimens tested, specified characteristics and requirements, and actual results obtained.
e. Reports of the raw material producer�s chemical, mechanical, and physical analysis.
f. A statement, as follows, certifying that material meets all requirements of the contract:
�The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate conforms to all contract requirements (including but not limited to the drawings and specifications); the analyses appearing herein are true and accurate analyses; and this certificate is made for the purpose of inducing payment and with knowledge that the information and certification may be used as a basis for such payment.�
g. Signature and title of certifying official.
2. First article inspection.
2.1 Submission. Unless otherwise specified, a first article sample consisting of three (3) springs shall be submitted for inspection and approval in accordance with the terms of this contract. The sample items will be subjected to any or all of the conformance inspections listed in Part III of this QAP and may be inspected for compliance with any or all of the requirements of the applicable drawing(s) and specification(s). The certification requirements of Part IV apply.
2.2 Rejection. If any sample item fails to comply with any of the applicable requirements, the First Article sample shall be rejected. The Government reserves the right to terminate inspection upon any failure to comply with any of the requirements.
3. Verification. Verification inspection shall consist of inspection of all conformance characteristics contained in Part III, Inspection Requirements, and Part IV, Certification Provisions, of this QAP. Failure to comply with the conformance criteria specified shall be cause for rejection of the lot or quantity represented.
3.1 Lot formation. Inspection lots shall comply with the lotting requirements of MIL-STD-1916, paragraph 4.2.
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593037
3.
PART II. CONFORMANCE PROVISIONS (CONT�D)
3.2 Attributes sampling inspection. The provisions/procedures of MIL- STD-1916 are applicable to this QAP. Unless otherwise specified, attributes sampling for the conformance characteristics listed in Part III herein shall be in accordance with MIL-STD-1916, Table II, using the verification level cited in the conformance criteria columns of Part III. The procedure in MIL-STD-1916 for normal inspection shall be used at the start of production for current or previous suppliers of the item. For all new suppliers of the item, tightened inspection shall be used at the start of production and be continued until the criteria for normal inspection are met.
3.3 Alternative verification provisions. Unless otherwise specified, alternative verification provisions, such as statistical process control (preferred), variables or continuous sampling plans, may be used by the contractor in lieu of the inspection provisions contained herein when such alternative(s) provide an equivalent or better level of quality, and provided they have been described in a written proposal which has been approved by the Government.
3.4 Inspection equipment. Unless otherwise specified herein or the contract, all inspection equipment required to perform the examinations and tests in this QAP shall be designed, documented and maintained by the contractor, including any fixtures necessary to accommodate the test procedures. Inspection equipment shall incorporate the appropriate measurement capability, precision and accuracy to assure rejection of all nonconforming product.
PART III. INSPECTION REQUIREMENTS
1. Classification of conformance characteristics.
CLASS CHARACTERISTIC ZONE CONFORMANCE INSPECTION
CRITERIA METHOD
CRITICAL: None
MAJOR:
101 Hardness test Note 7 II SMTE 102 Magnetic particle inspection Note 5C 100% SMTE 103 Bar diameter B3 II SMTE 104 Ends closed and ground square to the axis of the spring Note 5B II SMTE
MINOR:
201 Surface roughness, 63 (2 places) C6, C4 I SMTE 202 Total coils B3 I Visual 203 Loose surface scale Note 5D I Visual 204 Spring, right hand wound D5 I Visual 205 Inner diameter B3 I SMTE 206 Protective finish missing or defective Note 12 I Visual 207 Item identification missing, illegible or incorrect Note 10 I Visual 208 Workmanship All I Para. 1.2
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593037
3.
PART III. INSPECTION REQUIREMENTS (CONT�D)
2. Special sampling instruction. The contractor shall randomly select 2% of the spring lot. The test samples shall be subjected to the following test specified in 501. Minimum sample size is one item.
CLASS CHARACTERISTIC ZONE INSPECTION METHOD
301 Operational test B3 501
2.1 Failure. In a case of a failure of any item to meet the specified test requirements, acceptance of the product shall be suspended until the necessary corrections have been made by the contractor and approved by the Government.
PART IV. CERTIFICATION PROVISIONS
1. The certification provisions of paragraph 1.3 shall apply. Certifications are required for the following:
NUMBER CHARACTERISTIC CERTIFICATION METHOD TEST DATA TO COMPLY WITH
401 Material Certificate of Conformance Dwg. 12593037, Note 2 402 Spring manufacturing Certificate of Conformance Dwg. 12593037, Note 5 403 Decarburization Certificate of Conformance Dwg. 12593037, Note 5A 404 Heat treatment and presetting Certificate of Conformance Dwg. 12593037, Note 6 405 Shot peening Certificate of Conformance Dwg. 12593037, Note 9 406 Oil application Certificate of Conformance Dwg. 12593037, Note 11 407 Spring rate range Certificate of Conformance Dwg. 12593037, Zone B3 408 Protective finish Certificate of Conformance Dwg. 12593037, Note 12 409 Operational test Certified Test Report Dwg. 12593037, Zone B3
PART V. TEST METHODS AND PROCEDURES
501 Operational Test. The free length, load at assembled height and load at operating height shall be measured.
After this measurement compress the spring five times to the operating height. Upon the fifth compression hold for a period of one week (168 hours). Upon compression of the hold period, the free height, load at assembled height and at operating height shall be measured. Failure to meet the drawing requirements, prior to or after this test, shall be cause of rejection of the lot.
CAGE CODE
19200 16.
REVISION
SYMBOL
AND DATE
B130212 10. QAP NO.
12593037
| QAP 12593036 |
| QAP 12593037 |
File details come from the government source that posted it. Updated .