Attachment 0002 - 24-3-20 CDRL Chiller Bath.pdf
PDF 101 KB Posted
- Attached to
- W519TC-24-Q-2220 Chiller Bath Amendment 0001
- Solicitation number
- W519TC-24-Q-2220
About this file
This document includes a Contract Data Requirements List (CDRL) and information about a related federal contract opportunity. The CDRL outlines requirements for an Owner's/Operator's Manual and Maintenance Manual to be provided with the delivery of an Ultra Low Refrigerated Heating Circulator in support of additive manufacturing. It specifies the required formats, electronic and paper, and content to be included in each manual such as procedures for safe operation and maintenance, checklists, component schematics, and replacement schedules. The federal contract opportunity is solicitation number W519TC-24-Q-2220 from the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal for a chiller bath. No further details are provided on the requirements or scope of the opportunity in the attached documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IN ACCORDINANCE WITH RIPD E4000-24-3-20 for BLDG 210 4TH FLOOR LAB ULTRA LOW
REFRIGERATED HEATING CIRCULATOR (ULRHC) IN SUPPORT OF ADDITIVE MANUFACTURING
Contract Data Requirements List (CDRL)
1. Owners/Operator’s Manual:
Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
Content: This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
Delivery: Provide copies, as requested to the following:
Rock Island Arsenal
ATTN: TARA-LGC
Robert McClure Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299-6400
2. Maintenance Manual:
Format: The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
Content: This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Periodic Maintenance Schedule, and materials specifications for most often replaced components or fluids. Procedures and schedules for inspections, adjustments, cleaning, disassembly, and component replacements if required. The manual shall also include major component schematics, or diagrams (for hydraulic, and electrical systems).
Delivery: Provide copies, as requested to the following:
Rock Island Arsenal
ATTN: TARA- LGC
Robert McClure Building 220, Basement E Wing, Planners Rm Rock Island, IL 61299-6400
File details come from the government source that posted it. Updated .