SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W519TC-23-R-0011
X
2023FEB16
2023MAR2001:00pm
DOA6
2023FEB16 SEE SCHEDULE
W519TC
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
SHAWN E. KERR
(309)782-0000
CCRI
SHAWN.E.KERR6.CIV@ARMY.MIL
X 3 25
1 103
X 1
X 5 X 7
X 11 X 12 X 25
X 31
X 33
X 36
X 69
X 70
X 90
X 103
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: SHAWN E. KERR
Buyer Office Symbol/Telephone Number: CCRI/(309)782-0000
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The Army Contracting Command - Rock Island (ACC-RI) requests a proposal for the 40lb Cratering Charge, NSN: 1375-01-378-9669, DODIC:
M039, under Solicitation W519TC-23-R-0011.
1. NOTICE ______
a. The Technical Data Package (TDP) associated with this procurement is classified as Distribution "D" which means it is limited to the Department of Defense (DoD) and U.S. DoD Contractors only. Dissemination shall be in accordance with the provisions of DoD directive 5230.25. Violations of export laws are subject to civil and criminal penalties. Distribution of this TDP is only authorized to U.S. agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with regulations implementing 10 U.S.C. 130. Controlled Documents (including the TDP) may be obtained by having an active Joint
Certification Program (JCP) account.
i. American Ordnance (AO) can obtain an active JCP account by visiting the following website and submitting the necessary documents: https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
ii. When requesting access, provide AO's Commercial and Government Entity (CAGE) Code in the "Reason for Request" block.
iii. Once AO's account is active, AO may request access to documents in the System for Award Management (https://www.sam.gov ).
*** PLEASE NOTE, THE PERSON APPROVED FOR AO'S BUSINESS IN JCP MUST BE THE PERSON WHO REQUESTS ACCESS IN SAM OR AO WILL BE DENIED. ***
b. AO is required to be registered in the System for Award Management (SAM) database when submitting its offer, and shall continue to be registered until time of award, during performance, and through final payment of any contract resulting from this solicitation.
Refer to FAR 52.204-7, System for Award Management, for details regarding registration. AO may also obtain information on registration and annual confirmation requirements via the SAM accessed through https://www.sam.gov .
2. EXECUTIVE SUMMARY _________________
a. Request for Proposal (RFP) W519TC-23-R-0011 is issued in accordance 10 U.S.C. 2304(c)(3) as implemented by Federal Acquisition
Regulation (FAR) 6.302-3(b)(1)(i), Industrial mobilization; engineering, developmental, or research capability; or expert services.
Therefore, this RFP is restricted to American Ordnance, LLC as the operating contractor of the Iowa Army Ammunition Plant. As a result of this solicitation, the U.S. Government intends to award a five-year, firm-fixed-price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract on a sole source basis to AO, subject to AO determined to be a responsible contractor and the Contracting Officer's determination that AO's price(s) is/are fair and reasonable.
i. In addition to the M039 itself, Comp HBX H-6 explosive is restricted to the U.S. and Canada.
ii. The ordering periods are provided below (actual dates will be provided at time of contract award):
Ordering Period 1: Date of Award - 365 Days after Award (DAA)
Ordering Period 2: 366 DAA - 730 DAA
Ordering Period 3: 731 DAA - 1095 DAA
Ordering Period 4: 1096 DAA - 1460 DAA
Ordering Period 5: 1461 DAA - 1825 DAA
iii. ACC-RI is the only contracting activity authorized to issue delivery orders under any resultant contract.
b. The item solicited for is the M039 40lb Cratering Charge (CLIN 0002).
c. The guaranteed minimum quantity for this procurement is 1,000 each M039 40lb Cratering Charge units which will be issued at or near the time of basic contract award. After the minimum quantity has been satisfied, the Government has no obligation to order additional quantity under the IDIQ contract. The maximum quantity that may be procured under the resultant contract is 75,000 each.
2 103
W519TC-23-R-0011 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. Information included in Section B is for identification only. AO is required to complete and submit the "Price Matrix M039" identified as Attachment 0001 in Section J. AO shall complete this Price Matrix in accordance with the instructions in Section L.
e. First Article Test (FAT) is required.
i. A FAT Plan shall be submitted 120 days after contract award. The Government shall provide a response within 30 days of receipt. If further revisions are necessary, the contractor shall resubmit within 15 days and the Government will provide a response within 15 days. Reference CDRL A010.
ii. The FAT Report (CLIN 0001) is due 270 days from delivery order issuance. The Government has 30 days from receipt of FAT report(s) to provide disposition on the FAT. See Sections E and I, and CDRL A011.
iii. FAT costs are required to be proposed for each ordering period. AO should not assume FAT will be waived should continuous production not occur throughout the life of the contract, and must propose FAT costs as requested in Section L. The Government reserves the right to require or waive FAT throughout the life of the contract. Offerors should price FAT on the M039 Price Matrix to reflect the total price of a complete FAT that would be required for the start of production. Any other FATs that may be required throughout the life of the contract (component, subassembly, assembly, etc.), will be considered on an as-needed basis and should not be included in AO's FAT or unit prices on the M039 Price Matrix.
f. Prior approval of Contract Data Requirements List (CDRLs), (i.e., OPSEC Plan, QPP, PCP, AIE, ADC, etc.) on other Government contracts does NOT guarantee roll-over approval of CDRLs on any award resulting from this RFP. All CDRLs and solicitation provisions/contract clauses must be flowed down to and met by subcontractors and vendors at all tiers.
g. Clauses and provisions from the FAR and supplements thereto are incorporated into this document by reference and in full text.
Those incorporated by reference have the same force and effect as if they were given in full text.
h. Delivery: As part of its proposal response, AO shall specify a minimum monthly delivery rate it is capable of meeting, with deliveries for each order to commence no later than 360 days after delivery order award if issued with FAT, or no later than 180 days after delivery order award if issued without FAT.
Early delivery of contract requirements shall be acceptable at no additional cost to the Government, provided prior coordination and approval by the Contracting Officer in support of early delivery is secured.
i. Transportation terms: Free On Board (F.O.B.) Origin, see Section F. The applicable Destination/Ship-to Address(es) and
Transportation Account Code (TAC) to be designated under each individual delivery order.
j. Government-furnished Material (GFM):
i. Pursuant to the Government Property clause, FAR 52.245-1, in Section I of this solicitation, the Government shall furnish
F.O.B. contractor's place of performance the Government-owned property listed below for use in the performance of the contract.
(a) COMP B, NSN 1376-00-628-3306
(b) COMP D2 WAX, NSN 1376-00-628-3323
ii. The Government intends to start shipping GFM in September 2023. The initial planned GFM schedule is as follows:
Nomenclature SEP2023 OCT2023 NOV2023 DEC2023
COMP B 73,000 lbs. 72,995 lbs. 73,000 lbs.
COMP D2 WAX 5,200 lbs. 5,000 lbs. 4,990 lbs.
iii. The 73,000 lbs. of COMP B listed in the above table under column "DEC2023" shall be transferred over to this contract before the expiration of the interim storage contract at IAAAP (projected to expire December 2023) at no cost to the Government.
k. AO shall submit and negotiate a Small Business Subcontracting Plan as required by FAR 19.7 (FAR Clause 52.219-9, Small Business
Subcontracting Plan).
l. AO is cautioned to ensure its proposal is fully complete, including all fill-ins and blanks in the RFP. If fill-ins are not applicable, please indicate "N/A." Please follow Section L Instructions, Conditions, and Notices to Offerors carefully to ensure that any proposal submitted in response to this solicitation and any amendments, if applicable, includes all proposal requirements of the solicitation.
m. AO may submit any questions via email to the Procuring Contracting Officer (PCO), Mrs. Megan Kirby, megan.m.kirby.civ@army.mil, and Contract Specialist, Mr. Shawn Kerr, shawn.e.kerr6.civ@army.mil, until 1500 Central Time on March 6, 2023.
3 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
n. Proposal Submission:
i. The closing date and time for receipt of proposal is 1200 Central Time on March 20, 2023.
ii. Proposals shall be submitted electronically to the Contract Specialist, Mr. Shawn Kerr, shawn.e.kerr6.civ@army.mil, and the
PCO, Mrs. Megan Kirby, megan.m.kirby.civ@army.mil.
iii. By submitting a proposal, AO agrees by submission that its proposal and the prices contained therein will be valid for 250 days after receipt of the proposal.
iv. Proposals and any proposal revisions, if necessary, shall be submitted in strict accordance with the instructions set forth in this solicitation. The Government must be able to access information along with any submitted changes within proposals readily and easily, and will not be responsible for not being able to view necessary information that was not submitted in accordance with the instructions set forth in the solicitation and attachments.
o. Proposal evaluation shall be in accordance with the evaluation guidelines and specific evaluation procedures within this solicitation.
p. The M039 is considered a hazardous item. At a minimum, a safety and security pre-award survey may be required prior to awarding a contract.
q. The Government anticipates conducting a post-award conference for the contract resulting from this solicitation. It is expected that the contractor will be responsible for hosting the post-award conference. Hosting is defined as securing meeting facilities for up to approximately 20 participants, and ensuring presentation equipment is available.
r. In the event that a discrepancy between any statements in Narrative A and another section of the RFP exists, the other sections take precedence.
s. This RFP should not be discussed with any U.S. Government employee except the Contracting Officer, Mrs. Megan Kirby, or her representative, Mr. Shawn Kerr. Any formal communications such as request for clarifications, discussions/negotiations, and/or information concerning this RFP should be submitted in writing to Mr. Kerr at shawn.e.kerr6.civ@army.mil. Please indicate the RFP number, W519TC-23-R-0011, in the subject line.
*** END OF NARRATIVE A0001 ***
4 103
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 M039 FIRST ARTICLE TEST (FAT) _____________________________
FAT Plan (CDRL A010) shall be submitted no later than 120 calendar days after contract award.
Approval of the plan shall be obtained prior to FAT.
FAT Report (CDRL A011) shall be submitted no later than 270 calendar days from delivery order issuance and no later than 30 calendar days after completion of the FAT. Within 30 calendar days after the
Government receives the test report, the Contracting
Officer shall notify the Contractor of the conditional approval, approval, or disapproval of the first article.
FAT may be waived, as stated in FAR 52.209-3(h)(ALT
1), or modified at the discretion of the USG.
(End of narrative F001)
0002 M039 - 40LB CRATERING CHARGE ____________________________
NSN: 1375-01-378-9669
Part Number: 12961084
Ordering Period 1: Date of Award + 365 Days
After Award (DAA)
Ordering Period 2: 366 DAA - 730 DAA
Ordering Period 3: 731 DAA - 1095 DAA
Ordering Period 4: 1096 DAA - 1460 DAA
Ordering Period 5: 1461 DAA - 1825 DAA
INSPECTION AND ACCEPTANCE:_________________________
Inspection: Origin
Acceptance: Origin
DELIVERIES OR PERFORMANCE:_________________________
FOB POINT: Origin
Delivery locations will be determined at the time of each delivery order award.
(End of narrative F001)
0003 DATA ITEMS - CDRL (DD FORM 1423) ________________________________
The Contractor will prepare and deliver data
5 103
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
submissions in accordance with the requirements, quantities, and schedules set forth in the Contract
Data Requirements List (CDRL) found in Exhibit A.
A DD250 is not required.
(End of narrative B001)
6 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 DRAWINGS/SPECIFICATIONS
a. In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/ Packaging/ Packing and Inspection and Acceptance are contained elsewhere.
b. The following Drawings and Specifications in accordance with the Technical Data Package Listing (TDPL) identified as follows, with revisions in effect as stated, are applicable to this procurement, and revisions of documents thereon:
ITEM NSN TDPL DATE____ ___ ____ ____
CHARGE, DML, 40LB. CRATERING ASSY PKG 1375-01-378-9669 12961084::19200 03/19/2020
c. Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C.4. of this document.
d. The following engineering exceptions apply to the procurement:
DOCUMENT ADD DELETE________ ___ ______
HCSDS 29 -- XX
HCSDS 81 -- XX
HCSDS 91 -- XX
HCSDS 162 -- XX
HCSDS 546 -- XX
HCSDS 802 -- XX
Dwg9395847 -- XX
Dwg9395848 -- XX
Dwg9395849 -- XX
In drawing 9395836, remove "or solder in accordance with DOD-STD-1866, Type II" from Note 3 and use alternate welding practices in accordance with MIL-C-10464.
In drawing 8880543, remove Note 6b and use alternate protective finish 6a, 6c, or 6d.
ACV00617 - SIGNODE is a viable source for Samuel Strapping
TT-E-515 shall not apply to this Procurement.
C.2 POST AWARD MEETING AND PROGRAM MANAGEMENT REVIEWS (PMRs)
a. The contractor is expected to host a Post Award Meeting within 60 days after contract award (ACA) to review contract terms and conditions to ensure an understanding of the contract requirements.
b. PMRs shall be conducted within 180 days ACA and every 180 days thereafter until contract closeout to review progress of the contractor and subcontractors, and to discuss quality control and quality metrics. The meeting site, date, and time shall be mutually agreed upon between American Ordnance and the Government. The contractor shall prepare minutes in contractor format and distribute in electronic format.
C.3 INTEGRATED PRODUCT TEAM (IPT)
Bi-weekly IPT meetings shall be held throughout the duration of the contract life. The Contracting Officer reserves the right to change the frequency of the IPT meeting or cancel them all together at any time.
C.4 TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA
a. TDP(s) will be obtained electronically via the Contracting Opportunities posting for this requirement on the SAM.gov website. You must have an account prior to accessing any TDP(s). To register for an account in SAM.gov, please visit the following website:
https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select "Create an account." The toll-free helpdesk phone number is (866)606-8220 and for International (334) 206-7828. Vendors are responsible for placing correct information in SAM.gov.
7 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
b. You may need to use special software to view the documents that are posted on SAM.gov. This viewing software is freeware, and available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or
Lucent viewers to view the TDP(s) and are available as freeware at:
ImageR Viewer: http://g6msd.redstone.army.mil
Lucent Viewer: http://www.ec-edi.com/
c. The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.
d. FOR UNRESTRICTED TDPs:
(1) TDP(s) for this solicitation are unrestricted and can be accessed electronically via the solicitation posting. The TDP and all necessary TDP documents will be posted under the Attachments / Links tab. You must have a SAM.gov account prior to accessing the TDP.
(2) To access the TDP(s), click directly on the document you want to view under the Attachments / Links tab. You will be prompted for your username and password prior to gaining access to the TDP.
e. FOR RESTRICTED TDPs: The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.
(1) Access to RESTRICTED TDPs: TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.gov, go to the applicable solicitation under Contracting Opportunities within SAM.gov, select the Attachments / Links tab, and then click on the Request
Explicit Access button. Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access to the TDP.
Please allow 2-3 working days to process your request. You will receive a system generated email from mailto:donotrely@sam.gov saying "A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents." If your request is denied you will be able to see further details of why you were denied and how to proceed.
(2) Access to EXPORT CONTROL TDPs:
(a) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid
Contractor login credentials. In addition, to obtain access to these TDP(s), vendors and Contractors must have a current
DD 2345, Military Critical Technical Data Agreement, on file with the Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Military Critical Technical Data Agreement on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/
. Click on Documents and follow the instructions provided. Processing time is estimated at five (5) working days after receipt.
(b) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.gov, go to the applicable solicitation under Contracting
Opportunities within SAM.gov, select the Attachments / Links tab, and then click on the Request Explicit Access button.
The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export
Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP.
You will receive a system generated email from mailto:donotrely@sam.gov saying "A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the
Controlled Documents." If your request is denied you will be able to see further details of why you were denied and how to proceed.
(c) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.
(d) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq.
(3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is REQUIRED to
8 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by shredding, pulping, burning or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
f. Questions related to registration in SAM.gov should be directed to https://fsd.gov/fsd-gov/home.do . The helpdesk phone number is (866)606-8820. Vendors are responsible for placing correct information in SAM.gov. A user guide for SAM.Gov can be found here:
https://dodprocurementtoolbox.com/site-pages/contract-opportunities
*** END OF NARRATIVE C0001 ***
C.5 STATEMENT OF WORK: CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION
a. The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the
Government-provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(a) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695
NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(b) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
b. Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
c. Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
*** END OF NARRATIVE C0002 ***
C.6 STATEMENT OF WORK: LIGHT AND MEDIUM PHOSPHATE COATING REQUIREMENT
a. The following requirements regarding light and medium phosphate coatings are applicable to this statement of work and any resultant contract in addition to those requirements set forth in specification TT-C-490F Amendment 3.
b. Paragraph 3.2.1 of TT-C-490F Amendment 3 refers to "Procedure Approval." Prior to production, a detailed written procedure identifying cleaning, pretreatment and painting processes shall be submitted to the procuring agency for approval. Process time, temperature, chemical concentrations, process controls and acceptance criteria and any other pertinent details shall be listed for each step of the application process. The procedure shall include the manufacturer and exact proprietary designation of any material used as well as any equipment used in the application of the procedure. The complete procedure which demonstrates ability to pass the performance tests contained herein is to be signed by a company official prior to its submittal for approval. Deviation from the
9 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approved procedure is not permitted without written approval from the procuring agency (see Supplementary Requirements for Non-CARC).
c. Paragraph 3.2.2 of TT-C-490F Amendment 3 refers to "Preproduction Validation Panels." The test panels shall be the same substrate as will be used in production. For parts or panels requiring epoxy primer and urethane/epoxy topcoat finishes (CARC paint systems), the preproduction panels or parts three phosphated only; three phosphate plus primer; three phosphate, primer, and topcoat. For parts or panels requiring Alkyd topcoat finishes, the preproduction panels or parts three phosphated only; three phosphate plus topcoat.
*** END OF NARRATIVE C0003 ***
C.7 STATEMENT OF WORK: GFM ACCOUNTABILITY INSTRUCTIONS
a. General: Government-Furnished Material (GFM) for incorporation/consumption: Accountability for this material is transferred to the
Contractor under provisions of the FAR. The contractor shall maintain the official property records in accordance with FAR Part 45.
Cited Data Item Description provides transaction reporting necessary for accurate physical and fiscal accounting of material in the possession of defense contractors.
b. Consumption of Government-Furnished Materiel: Consumption of GFM shall be reported in accordance with Contract Data Requirements
List (CDRL A018) and DI-MGMT-80438B.
*** END OF NARRATIVE C0004 ***
10 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING & PALLETIZATION REQUIREMENTS
a. Packaging shall be in accordance with 12624777 revision H, dated 05 FEB 2013.
b. When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
c. Marking shall be in accordance with 12624777 revision H, dated 05 FEB 2013. 2-D barcodes are required in accordance with
12999545, rev J, dated 26 January 2018.
d. The following shall apply to drawing 12624777 revision H, dated 05 FEB 2013:
e. Performance Oriented Packaging (POP): Prior to shipment, the manufacturer shall make sure the container has been tested by a
Government-approved Performance Oriented Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title
49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the Government. The POP test report shall be generated by the Manufacturer/Laboratory following the test. The report must be kept on file by the contractor and submitted as required by the
Contract Data Requirement List (DI-PACK-81059). For multiple year contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.
f. Exception TO POP Markings: If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
g. POP Verification: In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.
h. Heat Treat Wood Quality Marking: In accordance with the requirements of the International Standards for Phytosanitary Measures
(ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material
Enforcement Regulations (see: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
i. Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
j. Palletization shall be in accordance with 19-48-4079/11, revision 03, dated 01 MAR 1996. 19?48?4079, Revision 04, dated 01 JUNE
2011, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with
ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.
*** END OF NARRATIVE D0001 ***
11 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.1 MIL-STD-1916
E.2 PROCESS CAPABILITY, CONTROL AND IMPROVEMENT REQUIREMENTS
E.3 REWORK AND REPAIR OF NONCONFORMING MATERIAL
E.4 DESTRUCTIVE TESTING
E.5 MEASUREMENT SYSTEM EVALUATION
E.6 FIRST ARTICLE TEST (CONTRACTOR TESTING)
E.7 SUPPLEMENTAL WARRANTY INFORMATION
E.8 AMMUNITION DATA CARDS AND REPORT OF CONTRACTOR BALLISTIC TESTING
E.9 AMMUNITION DATA CARDS
E.10 PROPELLANT REASSESSMENT
E.11 MIL-STD-1171A, ACCEPTANCE AND DESCRIPTION SHEETS (FOR PROPELLANTS AND
EXPLOSIVES)
E.12 MIL-STD-1171B, ENERGETIC MATERIAL DESCRIPTION SHEETS AND PROPELLANT
LOADING AUTHORIZATION SHEETS
E.13 2-D BAR CODING
*** END OF NARRATIVE E0014 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015; only design/development exclusions permitted
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 MIL-STD-1916
The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
12 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE E0001 ***
E.2 PROCESS CAPABILITY, CONTROL AND IMPROVEMENT REQUIREMENTS
a. The Contractor shall establish a Process Control System that includes, but is not limited to, procedures, systems and software.
This Process Control System shall complement the requirements of an ISO 9001-2015 or equivalent Quality Management System as well as all contract quality requirements. Statistical Process Control (SPC), when utilized, shall be implemented in accordance with ISO 11462-1 and ANSI/ASQC B1, B2, and B3 or equivalent. A Process Control Plan (PCP), which describes actions and methods to assure production processes are in a state of control, shall be submitted to the Government for review and approval as stipulated on DD Form 1423.
Demonstration of process capability in accordance with the approved PCP shall be accomplished prior to or at first article (if required) or prior to start of production. The Government reserves the right to withhold acceptance of product when there is evidence of noncompliance to the PCP. Should a finding of noncompliance to the PCP be made, a corrective action plan shall be submitted to the
Government for approval.
b. Characteristics for process control (CFPC) are as follows:
(1) CFPCs are features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation. CFPCs result from an in-depth Government-only review and analysis as specified in Technical Data Package (TDP) documentation as required below:
[X](1.1) Government selected list, see paragraph g. below
[ ](1.2) As listed key characteristics
[ ] (2) CFPCs are features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation. CFPCs shall be determined using an in-depth
Contractor review and analysis as specified in the PCP documentation. The Government reserves the right to identify any CFPCs as well as any additional characteristics identified in paragraph g.
[ ] (3) CFPCs are features within a product, subassembly, part and process whose variation from nominal (i.e., target value) significantly impacts safety, performance in terms of customer's requirements, or final cost of a product. Special controls should be applied where the cost of variation justifies the cost of control. These shall be developed from an in-depth Government-Contractor review and analysis of design as specified in paragraph g below.
c. The Contractor's analysis shall include processes and operations under the control of the prime Contractor and those under the control of sub-Contractor including subtier suppliers. The Contractor shall create a process flow chart for the entire process
(including manufacturing, inspection and material handling) and also perform a Process Failure Modes and Effects Analysis (PFMEA) for processes identified on the process flow chart affecting CFPCs. The Contractor shall identify, define and document specific controls applicable for each process and operation that affects all CFPCs. The Contractor shall: (a) conduct process capability studies on all process and operation parameters affecting CFPCs; (b) verify that all automated inspection equipment used to validate process capability has been properly calibrated and certified; and (c) conduct Measurement System Analysis (MSA) studies on all applicable corresponding measurement systems utilized to monitor process capability.
d. The Contractor shall prepare and implement a PCP. The PCP shall be based upon and include the process flow chart, PFMEA, process capability studies and MSA studies for all process and operation parameters affecting CFPCs. For each CFPC, the PCP shall describe the entire process (including manufacturing, inspection and material handling), control methods and action plans for all out of control conditions and process capability at the stated production rates. When utilizing statistical methods, a process capability index such as Cpk shall be calculated. A CFPC shall be considered to have an acceptable (and capable) process if it has a Cpk of at least 2.00 for
Critical characteristics, 1.33 for all other CFPCs, or as stated as follows: N/A. The Contractor shall notify the Government when the minimum process capability values (Cpk) of 2.00 for Critical characteristics and 1.33 for all other CFPCs, or the alternative established minimum Cpk values, are no longer being maintained.
e. In accordance with MIL-STD-1916, the Contractor may request, in writing, that alternate methods of acceptance be evaluated once the processes and applicable operation parameters have been demonstrated to be both stable and capable. Any alternate methods may not be implemented until approved by the Contracting Officer.
f. Corrective Action Requests (CARs) and Requests For Variance (RFVs) generated for identification of product nonconformances shall result in an evaluation of the PCP. The evaluation shall consider addition of new CFPCs to the contractually required process control list and require implementation of actions per paragraphs (c) and (d) above with submittal to the Contracting Officer for Government approval. If the CARs and RFVs are related to characteristics, processes and/or operations already identified in the PCP then those actions required by paragraphs (c) and (d) shall be reassessed and submitted to the Contracting Officer for Government approval. The
Government reserves the right to withhold acceptance of product until the revised PCP is approved by the Government.
g. If box b(1.1), b(2) or b(3) are checked above, the selected characteristics and applicable tools, techniques, control methods or
13 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
method of analysis to obtain these are specified as follows:
1. Paragraph 4.4.2.1 Cover, Bottom
a. Critical None defined
b. Major None
2. Paragraph 4.4.2.2 Body
a. Critical None defined
b. Major 101 Inside Diameter
c. Major 102 Evidence of full length weld
3. Paragraph 4.2.2.3 Body Assembly
a. Critical None defined
b. Major 101 Leak test
c. Major 102 Max O.D. crimp end
d. Major 103 Height
e. Major 104 Evidence of 360 degree weld
4. Paragraph 4.4.2.9 Cover, Top
a. Critical None defined
b. Major 101 Presence sealing compound
5. Paragraph 4.4.2.10 Cover, Top Assembly
a. Critical None defined
b. Major 101 Strength of handle
6. Paragraph 4.4.2.11 Charge, Demolition: 40LB, Cratering, Load Assembly
a. Critical None defined
b. Major 101 Weight of explosive
c. Major 105 X-ray
7. Paragraph 4.4.2.12 Charge, Demolition 40LB, Cratering (Prior to Installation of Cover, Top Assembly)
a. Critical None defined
b. Major 101 Radial movement of components
c. Major 102 Components missing
8. Paragraph 4.4.2.13 Charge, Demolition: 40LB, Cratering
a. Critical None defined
b. Major 101 Waterproofness
c. Major 102 Functioning with blasting cap
9. Paragraph 4.4.2.14 Container, Metal, Ammo, M182A, For Charge, Demo: 40LB, Cratering, prior to sealing
a. Critical None defined
b. Major None
10. Paragraph 4.4.2.15 Container, Metal, Ammo, M182A, For Charge, Demo: 40LB, Cratering
a. Critical None defined
b. Major 101 Presence of metallic seal
c. Major 102 Container damaged
d. Major 103 Contents of container
e. Major 104 Pressure retention test
*** END OF NARRATIVE E0002 ***
E.3 REWORK AND REPAIR OF NONCONFORMING MATERIAL
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition.
Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable
14 103
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the
Contracting Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
f. Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
*** END OF NARRATIVE E0003 ***
E.4 DESTRUCTIVE TESTING
a. All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
b. Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to the delivered to the Government as set forth in the Contract Schedule.
c. All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
d. The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance in-process testing, unless specifically authorized by the Contracting Officer.
e. The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
*** END OF NARRATIVE E0004 ***
E.5 MEASUREMENT SYSTEM EVALUATION
a. Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract
Data Requirements List (CDRL) and Data Item Description (DID). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon…