B08 23Q2318 0003 Solicitation.pdf

PDF 852 KB Posted

Attached to
Floating Dock Boards Federal contract opportunity
Solicitation number
W519TC23Q2318
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This amendment to solicitation W519TC23Q2318 extends the response due date from August 15th to August 24th for proposal submissions. The Army Materiel Command Joint Munitions Command seeks to procure two floating dock boards with an overall dimensions of 25 feet in length by 12 feet in width composed of two 6-foot sections that can bolt together. Each dock board must support a minimum of 16,000 pounds and withstand loads from a 6,000-pound electric forklift and two 10,000-pound carts. Offerors must include a detailed engineering drawing and description with their proposals accounting for the required features.

View the file

Other files for this federal contract opportunity

Other files attached to Floating Dock Boards, newest first.
File Type Posted
B08 23Q2318 0002 Solicitation.pdf PDF
A02 Portable Dock Example Drawing.pdf PDF
B08 23Q2318 0001 Solicitation.pdf PDF
B08 23Q2318 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W44W9M317800NB

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the due date and add additional detail.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC23Q2318

X 9B. DATED (SEE ITEM 11)

10-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2023

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W519TC23Q2318

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Aug-2023 03:00 PM to 24-Aug-2023 03:00 PM.

The following have been modified:

ADDIIN'L PURCHASE DESCRIPTION

Qualifying Statement for Floating Dock

Each Floating Dock Design Conditions:

Overall Dimensions: 25ft Length x 12ft Width on Leveling Legs (Dock Height Adjustment Range:

41in to 46in) Quantity two, 6 foot wide sections, 25 foot long that can be securely fastened together to form a level working platform. The final platform work dimensions should equal 12 foot wide by 25 foot long.

Length: 25ft Width: 12ft Total (2 sections of 6ft width are required to achieve the 25ft L x 12ft W overall dimension requirement. These sections must bolt together to secure them as one workable unit.)

Dock Height: 43in Nominal (Adjustment Range: 41in to 46in) Capacity: 16,000 lbs. Minimum The max loading conditions will be seen under two typical load situations. The first is when a

6,000-pound capacity XP electric forklift carries a load across the platform. The second is when two carts carrying a maximum 10,000-pound load moves across the platform. The carts each have four steel casters that are 10" in diameter and 2.5" wide.

Platform Material: Steel Finish: Painted Red Top Surface: Serrated Steel Grating No abnormal corrosive or abrasive materials will encounter the grating. It will just be subjected to typical industrial load and weather conditions.

DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP OMP Engineering Branch or AO will validate and verify/approve the contractors listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of the platform, to include a complete engineering drawing. The offerors description submittal shall account for each one of the required product features located in this qualifying statement.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .