W519TC-23-B-0001.pdf
PDF 137 KB Posted
- Attached to
- Artillery (PA-55 and PA-71/A) Fiber Containers
- Solicitation number
- W519TC-23-B-0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB) Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item 10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W519TC-23-B-0001 X 2022OCT17
1 signed
2022NOV1609:00am
DOA6
2022OCT17 SEE SCHEDULE
W519TC
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
GEORGE R. LINGRIS
(309)782-3855
CCRI-AC
GEORGE.R.LINGRIS.CIV@ARMY.MIL
1 64
X 1
X 4 X 7
X 8 X 10 X 21
X 26
X 28
X 47
X 48
X 62
X 64
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: GEORGE R. LINGRIS
Buyer Office Symbol/Telephone Number: CCRI-AC/(309)782-3855
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The Army Contracting Command - Rock Island (ACC-RI) is soliciting bids to procure the following Fiber Containers for 105mm Artillery rounds.
CLIN/ Container Part Number National Stock Number
0003/ 105MM PA-55 Fiber Container Production 9271050 8140-00-410-8331
0006/ 105MM PA-71/A Fiber Container Production 9825005-10 8140-01-456-8878
2. Invitation for Bid (IFB) W519TC-23-B-0001 in Accordance With (IAW) Federal Acquisition Regulation (FAR) Part 14, is restricted to the United States (U.S). IFB W519TC-23-B-0001 will be a total set aside for small business concerns in accordance with FAR 19.502-2.
3. The United States Government (USG) intends to award a Firm-Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Contract with six (6), four (4) month ordering periods.
4. During the life of the ordering periods for the contract, the USG is entitled to order a maximum dollar amount of $ 12,081,223.00, inclusive of all CLINs.
5. All First Article Acceptance Tests (FAATs), including Initial First Article Test (FAT) and Subsequent First Artical Test (SFAT), and unit prices for all ordering period ranges shall be entered in the Price Evaluation Sheet, Attachment 0001. Offerors shall submit firm fixed price unit prices for each quantity range for each CLIN. Offerors shall submit FAT prices for all ordering periods each CLIN. FAT costs are required to be included for each CLIN ordering period. However, if continuous production can be achieved, FAT may be waived.
Offerors should not assume FAT will be waived and must provide FAT costs as required to be considered for award. This is a competitive procurement action, although offerors are required to submit firm fixed prices that must be determined fair and reasonable to be considered for award.
6. The PA-55 and PA-71/A Fiber Containers will be built to a certified Technical Data Package (TDP). The TDP is coded as Distribution
Statement D (authorized distribution of technical documents to Department of Defense and U.S. DoD contractors only). Controlled
Documents may be obtained by having an active Joint Certification Program (JCP) account. Offerors can obtain an active account by visiting https://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents. When requesting access, provide the offerors Commercial and Government Entity (CAGE) Code in the, Reason for Request block. Once offeror's account is active, offerors may request access to documents in this solicitation posting on https://www.sam.gov/ . **PLEASE NOTE, THE
PERSON APPROVED FOR OFFEROR'S BUSINESS IN JCP MUST BE THE PERSON WHO REQUESTS ACCESS IN SAM OR OFFEROR WILL BE DENIED.**
7. Inspection/Acceptance/Free On Board (FOB) point for production shall be Origin/Origin/Origin. See Section F, "Deliveries or
Performance".
8. Early deliveries may be authorized, at no additional cost to the USG, subject to Procuring Contracting Officer (PCO) approval.
9. Bidders are advised to carefully read this entire IFB, including Section L and Section M before submitting their bids for evaluation. The basis for submission has been clearly identified in the Section L and Section M narrative. Bidders are responsible for understanding all requirements of the IFB and should carefully read FAR 52.214-5 Submission of Bids, 52.214-7 Late Submissions, modifications and withdrawals of bids, 52.214-10 Contract Award - Sealed Bid, and 52.214-12 Preparation of Bids. All bidders are responsible for ensuring that their bids contain all the information to be included per this IFB. The USG will award a contract resulting from this solicitation without discussions.
10. An Offeror is required to be registered in the System for Award Management (SAM) database when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of any contract resulting from this solicitation. Contractors may obtain information on registration and annual confirmation requirements via the SAM accessed through ttps://www.sam.gov/SAM/
11. Certified Cost and Pricing Data is not required to be submitted with a bidder's bid. However, if a bidder's proposed price cannot be determined fair and reasonable, the USG reserves the right to request Certified Cost and Pricing Data in accordance with FAR 52.214-
26.
2 64
W519TC-23-B-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
12. A Pre-Award survey might be required. The Pre-Award survey will be conducted by Defense Contract Management Agency (DCMA).
13. Bidders shall ensure that their bids are fully complete, including all fill-ins and blanks within the IFB. Failure to provide any information in accordance with this IFB may result in the bidder's response being considered nonresponsive. The USG shall not accept any additional prices submitted on Price Evaluation Sheet. All submitted price shall be reflected in First Article Acceptance Test (Initial
First Article Test and Subsequent First Article Test) and reflected within each quantity range within each Ordering Periods. If a bidder submits any additional pricing terms, whether added to the pricing evaluation sheet or contained in a cover letter, etc., the bid will be considered unacceptable and the USG will reject the bid.
14. Offeror questions regarding the IFB and all attachments are due to George R. Lingris, george.r.lingris.civ@army.mil and Kathleen M.
Ward, kathleen.m.ward20.civ@army.mil no later 9:00 a.m. Central Time, 02 November 2022 in order to ensure that all Offeror questions can be answered and posted for all potential Offeror's knowledge, prior to solicitation closing. This IFB shall not be discussed with any
USG employee except PCO, Kathleen M. Ward or her representative, George R. Lingris. Offeror shall indicate the IFB number, W519TC-23-B-
0001, in the subject line of all email correspondence pertaining to this IFB.
15. The closing date and time for receipt of bids is 9:00 a.m. Central Time on 16 November 2022. Bids shall be submitted by electronic
(emailed) to George R. Lingris, george.r.lingris.civ@army.mil and Kathleen M. Ward, kathleen.m.ward20.civ@army.mil. Any other type of submission will not be accepted. Any bid received after 09:00 a.m. Central Time shall not be accepted. To attend the Bid Opening, please request the teleconference number and password by submitting an e-mail to George R. Lingris, george.r.lingris.civ@army.mil -and
Kathleen M. Ward, kathleen.m.ward20.civ@army.mil by 9:00 a.m. Central Time 15 November 2022.
16. Any offeror submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 120 days after receipt of the bid.
17. Bid Opening shall commence at 9:00 a.m. Central Time on 17 November 2022. Due to security protocol at the Rock Island Arsenal, the
USG shall provide teleconference number and passcode, for those who have submitted a request and attendance list, prior to bid opening.
Teleconference bid opening attendance is not required.
18. The USG anticipates holding a post-award conference for the contract resulting from this solicitation. It is expected that the contractor will be responsible for hosting a post-award conference. Hosting is defined as securing meeting facilities and ensuring adequate presentation equipment is available.
19. Clauses and provisions from the FAR and supplements thereto are incorporated into this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
*** END OF NARRATIVE A0001 ***
3 64
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PA-55 FIRST ARTICLE TEST REPORT _______________________________
First Article Acceptance Test (FAAT) Report (either
Initial First Article Test(FAT) or Subsequent First
Article Test (SFAT))shall be submitted within 120 days after contract award. Refer to sections E and I for instructions on the FAT and SFAT.
The Government has 30 days to approve/disapprove FAT and SFAT Report after Government receipt of report.
Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting
Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or
(iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
Proposed FAT and SFAT prices for the base and each ordering period shall be provided on the Price
Evaluation Sheet(Attachment 0001).
(End of narrative B001)
0002 PA-55 SUBSEQUENT FIRST ARTICLE TEST ___________________________________
First Article Acceptance Test (FAAT) Report (either
Initial First Article Test(FAT) or Subsequent First
Article Test (SFAT))shall be submitted within 120 days after contract award. Refer to sections E and I for instructions on the FAT and SFAT.
The Government has 30 days to approve/disapprove FAT and SFAT Report after Government receipt of report.
Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting
Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or
(iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
Proposed FAT and SFAT prices for the base and each ordering period shall be provided on the Price
Evaluation Sheet(Attachment 0001).
4 64
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
0003 105 MM PA-55 FIBER CONTAINER PRODUCTION _______________________________________
This CLIN is included for the base and evaluated ordering. All proposed unit pricing shall be provided on the Price Evaluation Sheet(Attachment 0001).
Production deliveries shall begin 30 days after FAT or SFAT approval.
Inspection and Acceptance_________________________
Inspection: Origin
Acceptance: Origin
DELIVERIES OR PERFORMANCE_________________________
FOB POINT: Origin
Deliveries Locations will be determined at the time of each delivery order award.
(End of narrative B001)
0004 PA-71/A FIRST ARTICLE TEST REPORT _________________________________
First Article Acceptance Test (FAAT) Report (either
Initial First Article Test(FAT) or Subsequent First
Article Test (SFAT))shall be submitted within 120 days after contract award. Refer to sections E and I for instructions on the FAT and SFAT.
The Government has 30 days to approve/disapprove FAT and SFAT Report after Government receipt of report.
Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting
Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or
(iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
Proposed FAT and SFAT prices for the base and each ordering period shall be provided on the Price
Evaluation Sheet(Attachment 0001).
(End of narrative B001)
5 64
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 PA 71/A SUBSEQUENT FIRST ARTICLE TEST _____________________________________
First Article Acceptance Test (FAAT) Report (either
Initial First Article Test(FAT) or Subsequent First
Article Test (SFAT))shall be submitted within 120 days after contract award. Refer to sections E and I for instructions on the FAT and SFAT.
The Government has 30 days to approve/disapprove FAT and SFAT Report after Government receipt of report.
Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting
Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or
(iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
Proposed FAT and SFAT prices for the base and each ordering period shall be provided on the Price
Evaluation Sheet(Attachment 0001).
(End of narrative B001)
0006 105 MM PA-71/A FIBER CONTAINER PRODUCTION _________________________________________
This CLIN is included for the base and evaluated ordering. All proposed unit pricing shall be provided on the Price Evaluation Sheet(Attachment 0001).
Production deliveries shall begin 30 days after FAT or SFAT approval.
Inspection and Acceptance_________________________
Inspection: Origin
Acceptance: Origin
DELIVERIES OR PERFORMANCE_________________________
FOB POINT: Origin
Deliveries Locations will be determined at the time of each delivery order award.
(End of narrative B001)
6 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing for PA-55 and PA-71/A, with revisions in effect as of, August 28, 2022 are applicable to this procurement:
Fiber Container PA-71/A NSN: 8140-01-456-8878
Part Number: 9825005-10
THE FOLLOWING DRAWINGS, SPECIFICATIONS AND DOCUMENTS ARE APPLICABLE TO THIS
PROCUREMENT: DATA LIST 9825005-10, REV G, DATED 02/14/2022, AND REVISIONS OF
DOCUMENTS THEREON.
GOVERNMENT SPECIFICATIONS AND STANDARDS LISTED IN THE ADL MAY BE OBTAINED FROM
THE STANDARDIZATION DOCUMENTS ORDER DESK, BUILDING 4D, 700 ROBBINS AVENUE,
PHILADELPHIA, PENNSYLVANIA 19111-5094. INDUSTRY ASSOCIATION SPECIFICATIONS AND
STANDARDS MAY BE OBTAINED FROM THE APPLICABLE ASSOCIATIONS.
Government specifications and standards listed in the ADL may be obtained from the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111-5094. Industry Association specifications and standards may be obtained from the applicable associations.
Fiber Container PA-55 NSN: 8140-00-410-8331
Part Number: 9271050:19203
Change all references of each respective specification in MIL-C-50409:
FROM: MIL-STD-1235 TO: MIL-STD-1916
FROM: MIL-STD-105 TO: MIL-STD-1916
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled "Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
*** END OF NARRATIVE C0001 ***
7 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
(a) Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
(1) Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants.
(2) Preservation - Items susceptible to corrosion or deterioration shall be provided protection such as preservative coatings, volatile corrosion inhibitors, desiccants, water-proof and/or water-vapor-proof barriers.
(3) Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.
(b)Packing
(1) Unit packages and intermediate packages meeting the requirements for a shipping container may be utilized as shipping containers. All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items.
A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling.
(2) Bulk Packaging Items packaged directly in shipping containers shall be separated with pads, liners, partitions or dividers as required to protect the parts, strengthen the container and to distribute the load.
(3) Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.
(4) Shipping Containers - The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stackingat least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
(c) Unitization
(1) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(d) Marking
(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R with change 2, Dated: 27 Sep 2019 including 2D bar coding on outer shipping container and the unitized load. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings.
(e)Hazardous Materials
(1) A hazardous material is defined as a substance which has been determined by the Department of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Title 49 CFR and other applicable modal regulations effective at the time of shipment.)
Ammunition and explosives (Hazard Class 1) are special cases and must be properly hazard classified and registered with the competent authority of the United States (Department of Transportation).
(2) Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following document: Code of Federal Regulations (CFR) Title 49.
(f)Heat Treatment and Marking of Wood Packaging Materials
(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
8 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All
WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations(see
URL: ://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection
Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(g)Quality Assurance
(1) The contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package.
*** END OF NARRATIVE D0001 ***
9 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
MIL-STD-1916
The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
Part I General Statistical Process Control Requirements
(a) In addition to the quality requirements of the technical data package, the Contractor shall implement Statistical Process Control
(SPC) in accordance with a government accepted SPC Program Plan. Control chart techniques shall be in accordance with the American
National Standards Institute (ANSI) B1, B2 and B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.
(b) The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan. The plans shall be structured as delineated on the Data Item Description referenced in the DD Form 1423. The general and the detailed plans shall be submitted to the government for review per DD Form 1423 requirements. Notification by the Government of acceptance or nonacceptance of the plans shall be provided in accordance with the timeframes specified on the DD Form 1423. Once a general plan for a facility has been approved by this
Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted general SPC plan is not required if current SPC contract requirements and Data Item Description (DID) requirements are fulfilled. If this Command has previously accepted the general SPC plan under essentially the same SPC contractual requirements, so indicate by providing the Contracting Officer with the following information:
Date of Acceptance ______________
Contract Number(s) ______________
(c) The contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the Government, and corrective action shall be accomplished by the contractor.
(d) A milestone schedule will be submitted for those facilities who do not have, or have never had, a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for those SPC subjects addressed in the Statistical Process Control requirement located in Part
II of this section. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a first article is not required. Milestones shall be developed for each commodity identified for SPC application. Milestones shall be submitted through the Government Quality Assurance Representative to the Contracting Officer for review and acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted through the same channels for review. The Government reserves the right to disapprove any changes to the previously accepted milestones.
Notification by the Government of the acceptance or nonacceptance of the milestones shall be furnished to the Contractor by the
Contracting Officer.
(e) The Contractor shall review all process and operation parameters for possible application of SPC techniques. This review shall include processes and operations under the control of the prime contractor and those under the control of subcontractor or vendor facilities. A written justification shall be included in the detailed plan for each process and operation parameter that controls or influences characteristics identified as critical, special, or major which have been deemed impractical for the application of SPC techniques. A pamphlet on application of SPC for short production runs is available through the Contracting Officer.
(f) Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of 3 years. The control charts shall be provided to the Government for review at any time upon request.
(g) When the process or operation parameter under control has demonstrated both stability and capability, the Contractor may request, in writing, through Administrative Contracting Officer (ACO) and Contracting Officer (CO) channels to the Product Assurance and Test
Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated. Upon approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices and the control charts.
(h) The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of if any one of the following conditions exist:
10 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of 100% acceptance inspection or testing for an attribute-type critical parameter or characteristic.
(2) The Contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.
(3) The critical parameter or characteristic is a first order, single point safety failure mode (nonconformance of the critical parameter or characteristic in and of itself would cause a catastrophic failure).
(i) The Government will only consider reduction or elimination of the 100% acceptance inspection or test requirement for other critical parameters or characteristics if either of the following conditions are met:
(1) The process is in a state of statistical control utilizing variable control chart methods for the critical parameter or characteristic under control and the process performance index (Cpk) is at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance index is being maintained for each production delivery.
(2) The critical parameter or characteristic is conclusively shown to be completely controlled by one or more process or operation parameters earlier in the process, and those parameters are in a state of statistical control utilizing variable data, and the product of the probability of the conformance for each earlier parameter associated to the critical characteristic is better than or equal to a value equivalent to that provided by a Cpk of at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance indexes are being maintained for each production delivery.
(j) For characteristics other than critical, requests for reduction or elimination of acceptance inspection and testing shall be considered when the process performance index is greater than or equal to a Cpk of 1.33 for variables data. Requests shall be considered for attributes data when the percent beyond the specification limits is less than or equal to .003 (Cpk=1.33).
(k) Process or operation parameters under reduced or eliminated inspection or testing that undergo a break in production less than 6 months in length, may continue to operate under reduced or eliminated inspection or testing provided there has been no degradation below a Cpk of 1.33 (2.0 for criticals). Any break in production greater than 6 months shall require resubmission of the request for reduction or elimination of inspection or testing through the same channels cited in paragraph (g) above.
(1) Not used.
(m) Immediately following a change to a process or operation parameter under reduced or eliminated inspection, the process capability
(Cp) or process performance indexes (Cpk) shall be recalculated and documented for variable data; the grand average fraction defective shall be recalculated for attribute data. If any of these values have deteriorated, immediate notification shall be made to the
Government along with the associated documentation. Return to original inspection and test requirements may be imposed as stipulated in paragraph n below.
(n) The Government reserves the right to withdraw authorization to reduce or eliminate final acceptance inspection or testing and direct the Contractor to return to original contract inspection or test procedures at any indication of loss of process control or deterioration of quality.
Part II Detailed requirements pertaining to plan submittal
In accordance with DD Form 1423 and Part I of this section, the following supplemental information shall be considered and used when designing your general and detailed SPC plans.
1.0 General Management Plan
This section shall define managements SPC responsibilities and involvement and shall include managements commitment to continuous process improvement. The plan shall embrace a total commitment to quality and shall be capable of standing on its own merit.
1.1 Policy/Scope:
Describe the Contractors policy for applying SPC, including goals and management commitment to SPC.
1.2 Applicable Document:
List documents that are the basis for the contractors SPC program (i.e., ANSI standard, textbooks, Government documents).
1.3 SPC Management Structure:
Define the SPC management structure within the organization. Identify and include interrelationships of all departments involved in SPC
(i.e., Production, Quality, Engineering, Purchasing, etc.) Identify by job title or position all key personnel within departments involved in the application of SPC. Describe which functions are performed by key personnel and when these functions are performed
(i.e., include personnel responsible for performing inspections/audits, charting and interpreting data; personnel responsible for determining, initiating and implementing corrective action upon detecting assignable causes, etc.)
11 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1.4 SPC Training:
Identify by job title or position the primary individual responsible for overseeing that SPC training is accomplished. Describe the qualification program required and in use for all personnel utilizing SPC techniques, including the qualification of trainers. Identify who is to be trained and the type, extent and length of such training (i.e., on-the-job, classroom, etc.). Identify when refresher training is required and how personnel using SPC techniques are monitored.
1.5 Manufacturing Controls:
Identify the criteria for performing SPC gage capability studies and describe how and when these studies are applied. Repeatability and accuracy of gages should be addressed.
1.6 Determination of SPC Use:
Describe how the process/operation parameters are determined appropriate for SPC application and explain what actions are taken if SPC is not deemed appropriate for critical, special and major process/operation parameters (i.e., Pareto analysis; analysis of characteristics with tight tolerances, etc.)
1.7 Process Stability and Capability:
a. Identify the criteria for performing process capability studies and describe how and when these studies are applied. Describe how the process capability index is calculated and include the frequency of these calculations. Describe what actions are taken as a result of each process capability study. Describe the contractors methodologies when process capability is for variable and attribute data. To determine a capable process, the process/operation parameters shall meet the following requirements:
(1) Variable Data. Process capability (Cp) shall be determined. Process performance index shall be greater than or equal to 1.33
(Cpk). For critical parameters/characteristics, the process performance index shall be greater than or equal to 2.0 (Cpk).
(2) Attribute Data: Process capability/performance shall be the percent beyond the upper/lower specification limit less than or equal to .003 percent (Cpk=1.33).
b. Describe what actions will be taken if process/operation is sub-marginal or marginal. (Cpk less than 1.33 or 2.0 for criticals) or grand average fraction defective is greater than .003 percent).
c. Include analysis of statistical distributions and define all formulas and symbology utilized
1.8 Control Chart Policy:
a. Type of charts to be used (i.e., x bar/R x bar/S, etc.) and rationale for use; the criteria for selection of sample size, frequency of sampling and rational subgroups.
b. Procedures for establishing and updating control limits, including frequency of adjustments.
c. Criteria for determining out-of-control conditions (i.e., trends, points beyond control limits, etc.) and the corrective action taken; to include failure analysis when the process is unstable or when nonconforming product has resulted from unstable processes.
Illustrate out-of-control tests.
d. Describe the method of recording pertinent facts on control charts such as changes in raw material, machines, manufacturing methods and environment, and corrective actions taken and describe how control charts are traceable to the product.
1.9 Vendor/Subcontractor Purchase Controls:
Identify whether suppliers are required to utilize SPC and describe the extent the vendors policies and procedures are consistent with in-house procedures of the prime contractor. Describe the following: methods utilized to determine that suppliers have adequate controls to assure defective product is not produced and delivered; the system utilized to audit suppliers, what will be audited and how often;
what action will be taken when out-of-control conditions exist at subcontractor/vendor facilities.
1.10 SPC Audit System:
At a minimum, the contractors SPC Audit System shall consist of auditing compliance with the planned arrangements specified in the general and detailed SPC plans followed by a review and analysis of the outcome to include implementation of necessary corrective action.
1.11 SPC Records:
Identify various records to be used in support of SPC and describe their use. Identify retention periods.
2.0 Detailed Plan:
This section shall detail specific manufacturing process/operation parameters under control.
2.1 Control of Process/Operation Parameters or Characteristics:
a. Identify the following for each process/operation by name orcharacteristic under control:
12 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Identify process/operation by name or characteristic and provide rationale for selection; justification for non-selection if the parameter or characteristic is identified as critical, special and/or major.
(2) Describe how the characteristic is produced; the chain of events, type and number of machines involved, location of manufacturing facility, tolerances maintained, etc.
(3) Production and inspection machinery used. Include the production rate, number of shifts and length of shifts plus whether inspection is fully or semi-automatic or manual. If manual, identify the type of gages in use.
(4) Identify the type of charts to be maintained and whether the process/operation is performed in-house or subcontracted out;
identify facility/vendor where process/operation parameters are targeted for SPC.
2.2 Reduction or Elimination of Inspection/Test:
The Procuring Contracting Officer (PCO) will accept submissions of requests for reduction or elimination of final acceptance inspection/testing when the SPC contract requirements are met. Each request shall contain and/or address the following: control charts documenting twenty (20) consecutive production shifts or more for the same process/operation parameter under control; type of control chart utilized; control chart limits and process average or grand average fraction defective (as applicable); definition of out-of-control condition and corrective actions taken during out-of-control conditions; specification and part number.
REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition.
Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QARs disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the
Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to the delivered to the
Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall
13 64
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be shipped in accordance with the Contracting Officers instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
MEASUREMENT SYSTEM EVALUATION
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract
Data Requirements List (CDRL) and Data Item Description (DID). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic
Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see applicable DID referenced in DD Form 1423).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see
(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the
AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .