This document is a PowerPoint presentation providing background information on the accreditation efforts for various IT systems at Fort Carson, including the Traffic Control System, Utility Management Control System, Central Plant Hot Water System, Microgrid System, Wastewater Treatment System, and Wastewater System.

The presentation covers the regulatory framework and Army policies governing the Risk Management Framework (RMF) process for authorizing these IT systems, as well as the current compliance status of each system. It identifies the system owners, system descriptions, operational requirements, resources needed to operate, and FISMA requirements. The document does not contain information about a specific federal contract opportunity, but rather provides technical details about the IT systems in use at Fort Carson.

View the file

Other files

File Type Posted
TE-J.1.2.2.2 Traffic Paint Usage Report.xlsx XLSX spreadsheet
AMENDMENT 0001-FT CARSON W5168W-24-R-0009-24MAY2024.pdf PDF
TE-H.2.11B PCMS and Ft Carson Sewer Manhole Graphic.pdf PDF
TE-H.17.7.1 Environmental Battle Book.pdf PDF
TE-H.1.3.3 IMCOM Facility Maint Instruction.pdf PDF
TE-H.1.1.1 Real Property Facilities.pdf PDF
TE-H.2.15.1 Dampness and Mold Visual Assessment Worksheet.pdf PDF
Attachment U-W5168W-24-R-0009-WAGEDETERMINATION-29APR2024-FTCARSON.pdf PDF
Annex J to OPORD 18-011 Facility Maint Horizontal-Attachment H-18APR2024.pdf PDF
Annex G to OPORD 18-011 Pavement Clearance-18APR2024 - Copy.pdf PDF
TE-H.2.13.1.6- Individual Boiler Sys.xls XLS spreadsheet
TE-H.2.20.1 LPS and GP test locations.pdf PDF
Attachment T-Past Performance Questionnaire-W5168W-24-R-0009-FTCARSON-9APR2024.pdf PDF
TE-H.2.10.5 Backflow Prevention Devices.xlsx XLSX spreadsheet
TE-H.2.13.4A HVAC-COILS.xls XLS spreadsheet
TE-H.2.13.1.5 Boiler Operating Hours.xls XLS spreadsheet
Annex F to OPORD 18-011 Grounds Maint-FtCarson-8MAY2024.pdf PDF
TE-H.2.13.3 Chiller Wtr Chem.xls XLS spreadsheet
TE-H.2.19 Auxilary Generator.xlsx XLSX spreadsheet
TE-H.2.10.8 Wash Rack Facilities.xlsx XLSX spreadsheet
TE-H.2.13.4.1 Evaporative Coolers.xls XLS spreadsheet
TE-H.13 Propane Tank Locations.xlsx XLSX spreadsheet
TE-H.2.18.1 Emergency signs and lights.xlsx XLSX spreadsheet
TE-H.2.25 List of Facilities with Elevators.xlsx XLSX spreadsheet
TE-H.2.23 Playground locations.xlsx XLSX spreadsheet
TE-H.27 Fire Pumps.xlsx XLSX spreadsheet
TE-H.2.27b Vault Doors.xlsx XLSX spreadsheet
TE-H.2.3A AC-Units.xls XLS spreadsheet
TE-H.9.0A High Mast Lighting Assets.xlsx XLSX spreadsheet
W5168W-24-R-0009-Ft Carson Solicitation - 21MAR2024.pdf PDF
TE-J.2.1.4 Tank Trails.pdf PDF
TE-J.2.2.3c Red Devil Water Distribution.pdf PDF
TE-J.2.1.5 Bridge Locations.pdf PDF
TE-J.2.1.7.4 BAAF Paint Diagram.pdf PDF
TE-J.2.1.7 Butts AAF.pdf PDF
TE-J.2.1.8 Fort Carson Rail.pdf PDF
TE-G.2.5.1 FODPP.pptx PPTX presentation
TE-G.1.3 After Action Review.pdf PDF
TE-F.2.2.1B BAAF_Mowing 1 JAN 2020.PDF PDF
TE-F.2.2.11A PCMS Irrigation.pdf PDF
TE-F.2.2.6 Flower Beds.xlsx XLSX spreadsheet
Annex L to OPORD 18-011 Wastewater Services.pdf PDF
TE-K.3.1 Fuel Ordering Process.pptx PPTX presentation
Annex K to OPORD 18-011 Heating and Cooling.pdf PDF
TE-K.4.2.1 Monthly Chiller Log.xls XLS spreadsheet
TE-A.2D 2021 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2F-1 2023 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.7.4.A Government Furnished Property (GFP) (Equipment)-18MAR2024.xlsx XLSX spreadsheet
TE-A.6.0 Consolidated Deliverable Index.xlsx XLSX spreadsheet
TE-A.2.1.10 Subcontract Report.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directorate of Public Works Accreditation Efforts

TE-H.2.13.9.2A

Accreditation Efforts Jan 2023

References :

a. Federal Information Security Modernization Act of 2014, Public Law No. 113-283

b. Army Regulation (AR) AR 25-2, Information Assurance, 24 October 2007, Rapid Action Revision (RAR) 23 March 2009.

c. IMCON OPORD 16-001, Installation Management Command (IMCOM) Fiscal Year 2016-2017 (FY16-17) Annual Command Guidance (ACG), 24 June 2015.

d. IMCOM OPORD 15-088, Register IT-Based Industrial Control System

e. Department of Defense Instruction (DoDI) 8510.01, Risk Management Framework (RMF) for DoD Information Tecnology (IT), 12 March 2014.

f. DoDI 8510.01, DoD Information Assurance Certification and Accreditation (C&A) Process (DIACAP), 28 November 2007.

g. National Institute of Standards and Technology Special Publication (NIST SP) 800-37, Guide to Applying the Risk management Framework to Federal Information Systems, February 2020.

CONTROLLED UNCLASSIFIED INFORMATION

Background :

a. On 12 March 2014, the DoD Chief Information Officer approved the implementation of the RMF, which replaced DIACAP. The RMF establishes cybersecurity policies and assigns responsibilities for executing and maintaining the RMF consistent with the principles set in NIST SP 800-37.

b. The RMF applies to all Army IT that receives, process, stores, displays and/or transmits DoD/Army information. These technologies are broadly grouped as Information System Platform IT (PIT), PIT systems, IT services and IT products.

c. The Army's transition to the RMF began in February 2015.

d. The Army migrated to the DoD Enterprise Mission Assurance Support Service (eMASS) tool as part of the RMF implementation.

e. The Army CIO/G-6 is responsible for overall administration of the RMF and remains the Army Authorizing Official (AO). The Army CIO/G-6 Cybersecurity Director remains the Army Senior Information Security Officer (SISO).

Background cont.

Fort Carson DPW has register the following system in FISMA and eMASS.

System NameFort Carson Traffic Control SystemSystem AcronymTCS FT CARSONRegionCentral
System
DescriptionThe system operates and monitors traffic control systems Post Wide. The system consists of centralized master controller and 24 local controllers at roadway intersections linked via radio communications operating at 407.3 MHz's. The master controller is in the Traffic Control Center in the Directorate of Public Works (DPW). Program data can be uploaded and downloaded via radio between master and local controllers.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1540AITR NumberDA 306233
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?NO

Operational requirement. To provide Fort Carson with control of traffic systems on Post. The system allows the local controllers to be monitored for traffic conditions and counts, signal operations and functional status of equipment.

Resources (human/financial/technical) required to operate.One government person maintains and controls the system and the controllers. Power requirements for the local controllers is managed underneath the Operations and Maintenance Contract. This system has been in place since the late 1980s.
FISMA requirements.The workstation and centralized master controller are behind a locked door in the Traffic Engineers office. Radio antenna at each traffic signal are directional and only face the master controller antenna in the DPW building. The domain of the system is RF/Radio.
System NameFORT CARSON UTILITY MANAGEMENT CONTROL SYSTEMSystem AcronymUMCS FT CARSONRegionCentral
System
DescriptionThe Utility Management and Control System (UMCS) system and the user interface are located in Bldg. 1225 and reside on the Network Enterprise Center (NEC) backbone via the UMCS Local Area Network (LAN). The control system is an open Building Automation System (BAS) plan based on open LonWorks consisting of base-wide UMCS that is interoperable with multi-vendor LonWorks Direct Digital Control (DDC) systems. The system monitors and supervises networks of fielded building automation devices that control Heating, Ventilation and Cooling (HVAC) equipment and fire for over 340 buildings.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1370AITR NumberDA 306234
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?YES
Operational requirements.The Fort Carson UMCS has 15 Windows 10 machines. The Fort Carson UMCS utilizes an access controlled Virtual Local Area Networks (VLAN) on the Fort Carson Installation Campus Area Network (ICAN) to connect the Windows servers and machines to the control systems in each building at Fort Carson. The VLANs are used to transport encrypted information within the Fort Carson UMCS boundary. The VLANs reside in a private, non-routable IP space. Fort Carson UMCS does have one outbound connection, out-bound traffic is restricted to MDMS Gateway reporting to the MDMS Enterprise on port 443
Resources (human/financial/technical) required to operate.The critical function is managed underneath the Base Operations and Maintenance (O&M) Contract. The management of the UMCS is provided through a subcontract under the O&M contract. The Base O&M contract is a critical function which receives high priority for funding.
FISMA requirements.The DPW system administrator maintain the compliance of the server, to include updates, risk mitigation along with the MOA, TSP & APMS records.
System NameFORT CARSON CENTRAL PLANT (DISTRICT) HOT WATER SYSTEMSystem AcronymDHWS FT CARSONRegionCentral
System
DescriptionThe Ft Carson Hot Water Heat Plant Controls is a Supervisory Control and Data Acquisition (SCADA) system based at the Solo Point Hot Water Treatment Plant. The system will be used by the Public Works Hot Water Plant Operators to control the Hot Water Plant including pumps, tanks, filters, motors and other equipment. The system monitors the operating conditions throughout the plant and records this historically for environmental compliance. Inputs to the system are data from sensors for water levels, pump status, motor status, filter status & water quality and commands from the Wastewater Plant Operators. Outputs of the system are plant operating conditions viewed on screens and stored in a history file.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1543AITR NumberDA 306224
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?YES
Operational requirement.The Fort Carson DHWS resides on a Stand-Alone SCADA network. Inputs to the system are data from sensors for water levels, pump status, motor status, filter status & water quality and commands from the Wastewater Plant Operators. Outputs of the system are plant operating conditions viewed on screens and stored in a history file.
Resources (human/financial/technical) required to operate.The function is managed and funded as part of the Base Operations and Maintenance (O&M) Contract.
FISMA requirements.The O&M contractor maintains the system and controllers.
System NameSmart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) MicrogridSystem AcronymMG FT CARSONRegionCentral
System
DescriptionThe Ft. Carson microgrid integrates diesel generators (DGs), PV panels, and electric vehicles used as electrical energy storage to provide backup electrical power to multiple circuits containing different categories of loads for the microgrid. The Ft. Carson microgrid incorporates essential loads and several discretionary load buildings that can be energized, if sufficient resources are available. The SPIDERS control system manages all the microgrid generation sources and selects generators to optimize DGs power performance for a given load, thereby improving endurance by minimizing the amount of diesel fuel burned.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1237AITR NumberDA 306226
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?YES
Operational requirement.The Fort Carson Microgrid is a Standalone network, not connected to other enterprise or security architecture/network. Fort Carson Microgrid controls the network with security measures as noted in applicable STIG checklists. Role-based access and physical security measures provide access control, host-based and network security includes firewalls and access control lists to restrict traffic to the authorized ports, protocols and endpoints. Unnecessary software and services were disabled or removed.
Resources (human/financial/technical) required to operate.The function is managed and funded as part of the Base Operations and Maintenance (O&M) Contract.
FISMA requirements.The O&M contractor maintains the system and controllers.
System NameFORT CARSON WASTEWATER TREATMENT SYSTEMSystem AcronymWTS FT CARSONRegionCentral
System
DescriptionAutomation system for remote monitoring and controlling of water and wastewater distribution systems. The systems is Governement owned; operated and maintained by A76 operations and maintenance contractor for the Directorate of Public Works. The systems runs and is monitored 24/7. All cantonment well and major flow lift stations are monitored by the system.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1541AITR NumberDA 306223
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?YES
Operational requirement.The Fort Carson Wastewater Treatment has 1 Windows 10 workstation, 1 Ethernet Switch and 7 Fiber Converter Switches. The Ethernet Switch and Fiber Converter Switches are connected to many SCADA devices. The Fort Carson WTS is a stand-alone system that is used to monitor and control the Wastewater Treatment Plant process and operations. The Fort Carson WTS processes level, tanks status and motor controls along with data collections for meeting State of Colorado regulations for wastewater treatment.
Resources (human/financial/technical) required to operate.The function is managed and funded as part of the Base Operations and Maintenance (O&M) Contract.
FISMA requirements.The O&M contractor maintains the system and controllers.
System NameFORT CARSON WASTEWATER SYSTEMSystem AcronymWS FT CARSONRegionCentral
System
DescriptionThe Fort Carson Wastewater System is a Supervisory Control and Data Acquisition (SCADA) system based at the Solo Point Wastewater Treatment Plant. The system will be used by the Public Works Wastewater Plant Operators to control the treatment plant including pumps, tanks, filters, motors and other equipment. The system monitors the operating conditions throughout the plant and records this historically for environmental compliance. Inputs to the system are data from sensors for water levels, pump status, motor status, filter status & water quality and commands from the Wastewater Plant Operators. Outputs of the system are plant operating conditions viewed on screens and stored in a history file.InstallationFort CarsonSystem OwnerJoe Wyka
eMASS ID1546AITR NumberDA 306222
Operational?YesPIA/SORN Required?NO
FISMA Required?YesCompliant?YES

Operational requirement. The Fort Carson Wastewater System is a Supervisory Control and Data Acquisition (SCADA) system based at the Solo Point Wastewater Treatment Plant. Inputs to the system are data from sensors for water levels, pump status, motor status, filter status & water quality and commands from the Wastewater Plant Operators. Outputs of the system are plant operating conditions viewed on screens and stored in a history file. Last reviewed and deemed current 28 May 2001

Resources (human/financial/technical) required to operate.The function is managed and funded as part of the Base Operations and Maintenance (O&M) Contract.
FISMA requirements.The O&M contractor maintains the system and controllers.