TE-K.4.2.1 Monthly Chiller Log.xls

XLS spreadsheet 41 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

This document appears to be a Monthly Chiller Log for Building 1864, which provides details on various chiller and HVAC-related metrics tracked over the course of a month.

The related federal contract opportunity is a solicitation (W5168W-24-R-0009) for Base Operations Support Services at U.S. Army Fort Carson, Colorado. The contract will cover a range of Common Level of Services (CLS) including grounds maintenance, pavement clearance, facility maintenance, heating and cooling services, and wastewater services. The solicitation is being issued by the Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson.

View the file

Other files

File Type Posted
TE-J.1.2.2.2 Traffic Paint Usage Report.xlsx XLSX spreadsheet
AMENDMENT 0001-FT CARSON W5168W-24-R-0009-24MAY2024.pdf PDF
TE-H.2.11B PCMS and Ft Carson Sewer Manhole Graphic.pdf PDF
TE-H.17.7.1 Environmental Battle Book.pdf PDF
TE-H.1.3.3 IMCOM Facility Maint Instruction.pdf PDF
TE-H.1.1.1 Real Property Facilities.pdf PDF
TE-H.2.15.1 Dampness and Mold Visual Assessment Worksheet.pdf PDF
Attachment U-W5168W-24-R-0009-WAGEDETERMINATION-29APR2024-FTCARSON.pdf PDF
Annex J to OPORD 18-011 Facility Maint Horizontal-Attachment H-18APR2024.pdf PDF
Annex G to OPORD 18-011 Pavement Clearance-18APR2024 - Copy.pdf PDF
TE-H.2.13.9.2A Accreditation Efforts.pptx PPTX presentation
TE-H.2.13.1.6- Individual Boiler Sys.xls XLS spreadsheet
TE-H.2.20.1 LPS and GP test locations.pdf PDF
Attachment T-Past Performance Questionnaire-W5168W-24-R-0009-FTCARSON-9APR2024.pdf PDF
TE-H.2.10.5 Backflow Prevention Devices.xlsx XLSX spreadsheet
TE-H.2.13.4A HVAC-COILS.xls XLS spreadsheet
TE-H.2.13.1.5 Boiler Operating Hours.xls XLS spreadsheet
Annex F to OPORD 18-011 Grounds Maint-FtCarson-8MAY2024.pdf PDF
TE-H.2.13.3 Chiller Wtr Chem.xls XLS spreadsheet
TE-H.2.19 Auxilary Generator.xlsx XLSX spreadsheet
TE-H.2.10.8 Wash Rack Facilities.xlsx XLSX spreadsheet
TE-H.2.13.4.1 Evaporative Coolers.xls XLS spreadsheet
TE-H.13 Propane Tank Locations.xlsx XLSX spreadsheet
TE-H.2.18.1 Emergency signs and lights.xlsx XLSX spreadsheet
TE-H.2.25 List of Facilities with Elevators.xlsx XLSX spreadsheet
TE-H.2.23 Playground locations.xlsx XLSX spreadsheet
TE-H.27 Fire Pumps.xlsx XLSX spreadsheet
TE-H.2.27b Vault Doors.xlsx XLSX spreadsheet
TE-H.2.3A AC-Units.xls XLS spreadsheet
TE-H.9.0A High Mast Lighting Assets.xlsx XLSX spreadsheet
W5168W-24-R-0009-Ft Carson Solicitation - 21MAR2024.pdf PDF
TE-J.2.1.4 Tank Trails.pdf PDF
TE-J.2.2.3c Red Devil Water Distribution.pdf PDF
TE-J.2.1.5 Bridge Locations.pdf PDF
TE-J.2.1.7.4 BAAF Paint Diagram.pdf PDF
TE-J.2.1.7 Butts AAF.pdf PDF
TE-J.2.1.8 Fort Carson Rail.pdf PDF
TE-G.2.5.1 FODPP.pptx PPTX presentation
TE-G.1.3 After Action Review.pdf PDF
TE-F.2.2.1B BAAF_Mowing 1 JAN 2020.PDF PDF
TE-F.2.2.11A PCMS Irrigation.pdf PDF
TE-F.2.2.6 Flower Beds.xlsx XLSX spreadsheet
Annex L to OPORD 18-011 Wastewater Services.pdf PDF
TE-K.3.1 Fuel Ordering Process.pptx PPTX presentation
Annex K to OPORD 18-011 Heating and Cooling.pdf PDF
TE-A.2D 2021 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2F-1 2023 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.7.4.A Government Furnished Property (GFP) (Equipment)-18MAR2024.xlsx XLSX spreadsheet
TE-A.6.0 Consolidated Deliverable Index.xlsx XLSX spreadsheet
TE-A.2.1.10 Subcontract Report.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller log Monthly

Technical Exhibt
TE-K.4.2.1 Monthly Chiller LogJan-22
DateChiller Exp Tank LevelExp Tank PressSouth Supply PressureSouth Return PressureNorth Supply PressureNorth Return PressureCHW MakeupCond Makeup# 1 chiller hoursChiller-2 HourmeterChiller-3 HourmeterTemp South SupplyTemp South ReturnTemp North SupplyTemp North ReturnTech Initials
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Average0000
High
Low
Total0000
Operating Engineers Signature:Comments

&L

&C&"Arial,Bold"&18Bldg 1864 &"Arial,Regular"&10

File details come from the government source that posted it. Updated .