TE-G.1.3 After Action Review.pdf

PDF 80 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

The document provided is an After-Action Review (AAR) Guidance that outlines the purpose and process of conducting an AAR to assess a project or major activity. The AAR aims to discover what happened, why, reassess direction, and review successes and challenges. It focuses on answering five key questions: 1) what was supposed to happen, 2) what was the reality, 3) what went well, 4) what did not go well, and 5) what should be changed for next time. The AAR is not a critique, but rather a tool to identify lessons learned and inform future efforts.

The related federal contract opportunity is a solicitation for Base Operations Support Services at the U.S. Army Fort Carson, CO. The contract will include a range of Common Level of Services (CLS) such as grounds maintenance, pavement clearance, facility maintenance, heating and cooling services, and wastewater services. The solicitation is being issued by the Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson.

View the file

Other files

File Type Posted
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON-18JUNE2024.pdf PDF
W5168W-24-R-0009-GFP List-29MAY2024.pdf PDF
TE-G.2.1 Historical Snowfall-Updated.xlsx XLSX spreadsheet
TE-J.2.2.1.1 UPS-Locations-Updated.xlsx XLSX spreadsheet
TE-H.2.13.9.2 EMCS Inventory.xlsx XLSX spreadsheet
Annex A-Performance Work Statement (PWS)-W5168W-24-R-0009-24MAY2024.pdf PDF
TE-H.2.15.2 Post Remediation Verification Letter.pdf PDF
TE-H.2.13.1.5A Boiler Operating Log.xls XLS spreadsheet
TE-H.2.10.3 Sump_Lift Station Locations.pdf PDF
TE-H.2.11A STP Description.pdf PDF
TE-H.2.14 List of Facilities for Winterization and De-Winterization (Mothballed).xlsx XLSX spreadsheet
TE-H.1.1.1A Non Real Property.xlsx XLSX spreadsheet
TE-H.2.28 Food Service Equipment Location.xlsx XLSX spreadsheet
TE-H.25 Sand Pipes and Yard Hydrant Locations.xlsx XLSX spreadsheet
TE-H.2.9 Compressors.xls XLS spreadsheet
TE-H.21.1 AST_UST Locations.xlsx XLSX spreadsheet
TE-H.9.0 Privatized Street Lights.xlsx XLSX spreadsheet
TE-H.2.3.1.1 Radon Detection Units.xlsx XLSX spreadsheet
TE-H.2.4 Eyewash Station Locations.xlsx XLSX spreadsheet
W5168W-24-R-0009 Attachment List-FtCarson-24MAY2024.xlsx XLSX spreadsheet
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-20MAR2024-Final.xlsx XLSX spreadsheet
Attachment P-W5168W-24-R-0009-DAVISBACON-HIGHWAY-08DEC2023-FTCARSON.pdf PDF
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON.pdf PDF
Attachment K - W5168W-24-R-Staffing Matrix-FTCARSON.xlsx XLSX spreadsheet
Attachment M-CBA-W5168W-24-R-0009.pdf PDF
TE-J.2.1.8.8 Fort Carson Rail Graphic.pdf PDF
TE-J.2.1.3 Downrange Routes.pdf PDF
TE-J.2.2.3 Fort Carson Water Distribution System.pdf PDF
TE-J.2.1.6 Retention Ponds and Dams.pdf PDF
TE-J.2.2.4.1d Range 143 Sewer.pdf PDF
TE-J.2.2.4.1b Range 109 Sewer.pdf PDF
TE-J.2.2.4.1e PCMS Sewer.pdf PDF
TE-J.2.2 Rail Insp Checklist.pdf PDF
TE-J.2.2.1.3a Traffic Controller PM inspection and checklist.pdf PDF
TE-J.2.2.1.1 UPS-Locations.xlsx XLSX spreadsheet
TE-J.2.2.1.3 Traffic Control Cabinets.pdf PDF
TE-H.2.24 Washers-Dryers.xlsx XLSX spreadsheet
Attachment F-Annex G to OPORD 18-011 Pavement Clearance.pdf PDF
Attachment E-Annex F to OPORD 18-011 Grounds Maint.pdf PDF
TE-F.2.2.9.5 Tree Report.pdf PDF
TE-A.2.4.1 Integrated Cultural Resources Management Plan (ICRMP).pdf PDF
TE-A.2.1.3C Carson Cantonment Map.pdf PDF
TE-A.2F 2023 Workload Data (DMO-30JAN2024.xlsx XLSX spreadsheet
TE-A.2D-1 2021 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2A 2018 Workload Data.xlsx XLSX spreadsheet
TE-A.2.2.4 Historical PM Task Listing.xlsx XLSX spreadsheet
TE-A.7.3 Consolidated Technical Exhibit Index-15MAR2024.pdf PDF
TE-A.6.1 Consolidated Contractor Plans.xlsx XLSX spreadsheet
W5168W-24-R-0009-Ft Carson Solicitation - 21MAR2024.pdf PDF
TE-J.2.1.4 Tank Trails.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE-G.1.3

AAR Format 1 Jan 2023

AFTER-ACTION REVIEW GUIDANCE

An After-Action Review (AAR) is an assessment conducted after a project or major activity that allows team members and leaders to discover (learn) what happened and why, reassess direction, and review both successes and challenges. The AAR does not have to be performed at the end of a project or activity; it can be performed after each identifiable event within a project or major activity, thus becoming a live learning process.

The AAR should review the tasks and goals of the activity as they were initially understood. It should also evaluate whether these tasks and goals were effective after implementing the activity. Hence the AAR serves as a tool that can potentially redefine goals or future tasks. The AAR also identifies next steps or action items towards meeting these goals after the activity itself has finished. It is not a critique. In fact, it has several advantages over a critique:

• It does not judge success or failure.

• It attempts to discover why things happened.

• It focuses directly on the tasks and goals that were to be accomplished.

• It encourages team members to surface important lessons in the discussion.

• More team members participate so that more of the project or activity can be recalled and more lessons can be learned, shared, and incorporated back into the effort or subsequent efforts.

The AAR will seek to answer five key questions:

1) what was supposed to happen

2) what was the reality

3) what went well

4) what did not go well

5) what should be changed for next time.

TE-G.1.3

AAR Format 1 Jan 2023

• What was supposed to happen? (Date/Time of Event, Duration, etc)

• What was the reality? (Did the Snow get cleared IAW contract terms? Where there areas that happened that should have been completed but weren’t? TE’s inaccurate?)

• What went well? (Execution, scheduling, etc)

• What did not go well? (Personnel shortages, equipment failures, response to those failures, notifications, etc)

• What should be changed for next time? (Changes you can control, potential changes you can’t control/recommendations)

File details come from the government source that posted it. Updated .