TE-A.6.0 Consolidated Deliverable Index.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

This document is a Consolidated Deliverable Index related to a federal contract opportunity for Base Operations Support Services at U.S. Army Fort Carson, Colorado. The index lists over 40 required deliverables and their associated requirements, including updated drawings, material certifications, inspection reports, schedules, and performance data across various functional areas such as grounds maintenance, facility maintenance, utilities, and environmental compliance. Key details include required submission formats (hard copy, electronic), distribution (Contracting Officer Representative, Facilities Manager), due dates (e.g. monthly, annually), and references to specific contract paragraphs. The related federal contract opportunity is a solicitation for a contractor to provide a wide range of base operations support services at Fort Carson, including grounds maintenance, facility maintenance, utilities, and environmental management.

View the file

Other files

File Type Posted
QandA Responses-24MAY2024-W5168W-24-R-0009.xlsx XLSX spreadsheet
TE-H.2.0B PM Tasks.xlsx XLSX spreadsheet
Annex K to OPORD 18-011 Heating and Cooling-18APR2024.pdf PDF
TE-H.2.23A Playground Checklist.pdf PDF
TE-H.1.1 Historical Locations.pdf PDF
TE-J.2.2.4.2 Lift Station PM Checklist.pdf PDF
TE-H.2.13.6.5 Chiller Plant Op Log.pdf PDF
TE-H.2.3.1.1A Exhaust Fan Locations.xlsx XLSX spreadsheet
Section M-W5168W-24-R-0009-FtCarson 23APR2024.pdf PDF
TE-H.2.13.1 List of Equip in Heat Plants.pdf PDF
TE-H.2.13.6 Major Oper Equip Cool Plant.pdf PDF
TE-H.2.13.4.2 Air Dryers.xlsx XLSX spreadsheet
TE-H.2.3 Furnances-Unit Heaters.xls XLS spreadsheet
TE-H.2.13.9.1 EMCS Facilities.xlsx XLSX spreadsheet
TE-H.9.5 Airfield Lighting.pdf PDF
TE-H.2.24A Washers-Dryers.xlsx XLSX spreadsheet
TE-H.2.13.7 Kitchen Hoods.xlsx XLSX spreadsheet
TE-H.2.29.1.7 Kitchen_Grill Hoods.xlsx XLSX spreadsheet
TE-H.9.1 Traffic Lights.xlsx XLSX spreadsheet
TE-H.2.27 Master Best Lock and Key count.xlsx XLSX spreadsheet
Add-In Text for-Executive Order 14055 Clause-Add in PD2.pdf PDF
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-24MAY2024.xlsx XLSX spreadsheet
Attachment Q-W5168W-24-R-0009-DAVISBACON-RESIDENTIAL-08DEC2023-FTCARSON.pdf PDF
Attachment D- Annex L to OPORD 18-011 Wastewater Services.pdf PDF
Attachment V- Annex K to OPORD 18-011 Heating and Cooling.pdf PDF
Attachment T3 - Specific Relevant Contracts Reference Sheet-W5168W-24-R-0009-FTCARSON.pdf PDF
TE-J.2.1.2.1 Cross walk locations.pdf PDF
TE-J.2.1.2.1 School Crosswalk Locations.pdf PDF
TE-J.2.2.4.1 Range 145 Sewer.pdf PDF
TE-J.2.2.4.1c Range 111 Sewer Maps.pdf PDF
TE-J.2.2.3b Olympic Shooting Complex Water Distribution.pdf PDF
TE-J.2.2.3a PCMS Water Distribution System.pdf PDF
TE-J.2.1.4.1 Running Trails.pdf PDF
TE-J.2.1.3.1 FCCO Firebreaks.pdf PDF
TE-J.2.1.8A PCMS Rail.pdf PDF
TE-J.1.2.2 IGSA Responsibilities.pdf PDF
TE-G.1.1 Snow Removal Map.pdf PDF
TE-G.2.1.2.3 Known Dumpster Locations.xls XLS spreadsheet
TE-G.2.1 Historical Snowfall.xlsx XLSX spreadsheet
TE-F.2.2.1C Down Range Mowing Maps.pdf PDF
TE-F.2.2.11 Fort Carson Irrigation.pdf PDF
TE-L.1.2 Sanitary Sewer Manhole Locations.pdf PDF
TE-A.2.1.3B PCMS Installation Map.PDF PDF
TE-A.2C 2020 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2E-1 2022 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2E 2022 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2.1.3A Fort Carson Installation Map.pdf PDF
TE-A.2.1.3D ADACG and Bldg 20000.pdf PDF
TE-A.7.4 Government Furnished Property (Facilities).pdf PDF
TE-G.1.2 Installation Snow Removal Plan.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TE-A.6.0
Consolidated Deliverable Index
1-Jan-23
Deliverable numberTitleRequirementsDate RequiredFormatDistributionSpecial instructions
D-A.2.3.1.1Updated DrawingsHard Copy submittal upon completion of modification effortsUpon completion of directed efforts or NLT 15 Oct annuallyHard CopyCOR/ GISUpdates may be coordinated with GIS directly
D-A.2.5.5.2Certification and estimate of percentage recovered materialIAW Para A.2.5.5.2NLT 15th day of final month of each PoPElectronicCOR/KO
D-A.2.5.5.3Material SDS ApprovalsIAW Para A.2.5.5.3Prior to orderingElectronicCOR
D-A.2.5.5.4Spill NotificationIAW Para A.2.5.5.4Within 1 hr of occuranceElectronicCOR
D-A.2.5.6.1DCC LetterIAW Para A.2.5.6.1Within 30 days of award; Reviewed AnnuallyElectronicCOR
D-A.7.5.4Contractor Caused Damage ReportIAW Para A.7.5.4Per OccuranceElectronicCOR/MICC PAMICC PA only were issued prperty is concerned
D-A.7.5.6Disposition Turn In of GFEIAW Para A.7.5.6Per OccuranceElectronicCOR/MICC PA
D-F.2.2.7.1Monthly Herbicide ReportIAW Para F.2.2.7.1Monthly, NLT 5th day for preceding monthElectronicCOR
D-F.2.2.7.4Monthly Building Inspection ScheduleIAW Para F.2.2.7.4Within 15 days from awardElectronicCORBuilt into GFEBS as well
D-F.2.2.7.4AInspection ResultsIAW Para F.2.2.7.45th day of the month preceding inspection monthElectronicCORIncludes OWO number
D-F.2.2.7.5Licenses and certificationsIAW Para F.2.2.7.5Within 5 days of award and upon request thereafterElectronicCORMaintain in HR Files
D-F.2.2.7.7Medical Surveilance AffirmationIAW Para F.2.2.7.7AnnuallyElectronicCOR/KO
D-G.1.3Snow Event AARIAW Para G.1.3NLT 3 days after event; Annually by JuneElectronicCOR
D-H.2.3.1.2Equipment Inventory ListIAW Para H.2.3.1.2within 60 days of award;Semi Anually thereafterElectronicCOR
D-H.2.3.2.1Seasonal Changeover ScheduleIAW Para H.2.3.2.1Within 60 days of award; Annually thereafterElectronicCOR
D-H.2.8PM Automatic Door-Fence OpenersIAW Para H.2.8Within 60 days of award; Annually thereafterElectronicCORBuilt into GFEBS as well
D-H.2.9PM Air compressor SystemsIAW Para H.2.9Within 60 days of awardElectronicCORBuilt into GFEBS as well
D-H.2.10.6.3Grease Trap InspectionsIAW Para H.2.10.6.3Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.11Septic Tank ReportIAW Para H.2.11Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.13.9.4Completed EMCS HVAC AnalysisIAW Para H.2.13.9.4Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.14.1Winterized FacilitiesIAW Para H.2.14.1Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.19.1Auxiliary Generator ReportIAW Para H.2.19.1Monthly, NLT 5th day for preceding monthElectronicCORBuilt into GFEBS as well
D-H.2.20.6GPS,LPS,CPS InspectionsIAW Para H.2.20.6Within 5 days of completionElectronicCORBuilt into GFEBS as well
D-H.2.21.1.2PM Fire Suppression and Mass NotificationIAW Para H.2.21.1.2Within 15 days of contract award ; updates as neededElectronicCOR/KO and FDBuilt into GFEBS as well
D-H.2.25.3.1Elevator Inspection ScheduleIAW Para H.2.25.3.1Within 30 days of award; Reviewed AnnuallyElectronicCOR
D-H.2.25.3.1AElevator Inspection ChecklistIAW Para H.2.25.3.1Within 10 days of Annual testElectronicCORMust utilize DA 7485-R
D-H.2.26Pool System InspectionsIAW Para H.2.26Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.29.1.6DFAC InspectionIAW Para H.29.1.6Due Weekly, Friday COBElectronicCOR
D-H.2.29.1.7Exhaust Hood CleaningIAW Para H.2.29.1.7Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.29.1.8Exhaust System Fire Suppression InspectionIAW Para H.2.29.1.8Monthly, NLT 5th day for preceding monthElectronicCOR
D-H.2.30.2Overhead Crane InspectionsIAW Para H.2.30.2AnnuallyElectronicCOR/Fac MgrProvide Facility Mgr copy of inspections; Annotate name on COR copy
D-H.4.5Self Help Material ListingIAW Para H.4.5Within 30 days of award; Reviewed AnnuallyElectronicCOR
D-H.5.1Energy Conservation DevicesIAW Para H.5.1Monthly, NLT 5th day for preceding monthElectronicCORBuilt into GFEBS as well
D-H.5.1Energy Conservation DevicesIAW Para H.5.2.3AnnuallyElectronicCOR
D-H.9.3Traffic Control PM ScheduleIAW Para H.9.3Within 30 days of award; Reviewed AnnuallyElectronicCORBuilt into GFEBS as well
D-H.9.5Airfield Lighting PM ScheduleIAW Para H.9.5Within 60 days of awardElectronicCORBuilt into GFEBS as well
D-H.11.0Storm Drainage SurveyIAW Para H.11.0Bi AnnuallyElectronicCOR
D-H.15.2Storm Drain and Gutter InspectionsIAW Para H.15.2Bi AnnuallyElectronicCOR
D-H.16.2Bi-weekly Flood Control pump stationsIAW Para H.16.2Bi WeeklyElectronicCOR
D-H.16.4Storm Drainage Service DisruptionIAW Para H.16.4As requiredElectronicCORSITREP Format
D-H.21.0Fuel System InspectionsIAW Para H.21.025th of each month, submitted NLT end of monthElectronicCOR. PST Program ManagerBuilt into GFEBS as well
D-H.27.1Hydrant Flow TestingIAW Para H.27.1AnnuallyElectronicCOR
D-H-27.1AFire Flow Calculations and Data SheetIAW Para H.27.1AAnnuallyElectronicCOR
D-H.30.0Water Test and DisinfectingIAW Para H.30.0Within 5 days of completionElectronicCOR
D-J.1.2.1.1PM Surfaced Areas ScheduleIAW Para J.1.2.1.1Within 30 days of award; Reviewed AnnuallyElectronicCORBuilt into GFEBS as well
D-J.1.2.1.1dIncident Traffic Control PlanIAW Para J.1.2.1.1 and sub paragraphs7 days prior to incidentElectronicCOR/DES/FDAs needed, per event addressing nuances from over arching TCP
D-J.1.2.1.1d.1Traffic Disruptions LogIAW Para J.1.2.1.1 and sub paragraphs5th day of the month for preceding monthElectronicCOR
D-J.1.2.1.3Street Sweeping ScheduleIAW Para J.1.2.1.35th day of the month for preceding monthElectronicCOR
D-J.1.2.1.3aStreet Sweeping Water UsageIAW Para J.1.2.1.3a5th day of the month for preceding monthElectronicCOR
D-J.1.2.1.5Parking Lot Painting ScheduleIAW Para J.1.2.1.5Within 15 days of contract award; updates as neededElectronicCOR
D-J.2.1.2.1School Crosswalk Paint ScheduleIAW Para J.2.1.2.1Within 15 days of NTP & NLT 5th of each Month thereafterElectronicCORBuilt into GFEBS as well
D-J.2.1.3.1Firebreak and MSR ScheduleIAW Para J.2.1.3.1Within 30 days of NTP & NLT 5th of each Month thereafterElectronicCORBuilt into GFEBS as well
D-J.2.1.8Rail InspectionsIAW Para J.2.1.8Monthly, NLT 5th day for preceding monthElectronicCOR
D-J.2.1.9Ammunition Bunker Inspection ScheduleIAW Para J.2.1.9Within 15 days of contract startElectronicCORBuilt into GFEBS as well
D-J.2.1.9aMonthly Bunker InspectionsIAW Para J.2.1.9Monthly, NLT 5th day for preceding monthElectronicCOR
D-K.2.6Offline Boiler NotificationIAW Para K.2.6Within 2 hrs of failure to bring Boiler onlineElectronicCOR
D-K.2.14Curtailment Notification/completionIAW Para K.2.14Within 1 hr of curtailment notification & within 2 hrs of changeover completionElectronicCOR
D-K.2.14.1ACM/LBP clearance resultsIAW Par K.2.14.1with 72 hrs of receiptElectronicCOR
D-K.4.2.1Monthly Chiller Log ReportIAW Para K.4.2.15th day of the month for preceding monthElectronicCOR
D-L.1.3.1.2STP Operators LogIAW Para L.1.3.1.210th day of the monthElectronicCOR
D-L.1.3.1.2ABio Solids ReportIAW Para L.1.3.1.2Annually, NLT 15 FebElectronicCOR
D-L.2.1Permit Violation IncidentIAW Para L.2.1Within 2 hrs of violationTelephonic &ElectronicCOR
D-L.3.3.1.3Monthly IWTP SamplesIAW Para L.3.3.1.310th day of the monthElectronicCOR
D-L.3.4.1System Bypass NotificationIAW Para L.3.4.1within 1 hr of initiation & returnTelephonic &ElectronicCOR
D-L.3.4.1.1Sedimentation Sludge TestIAW Para L.3.4.1.1Within 7 days of requestElectronicCOR