Question 1: Do you have a drawing of the piece for what you are requesting?
Answer 1: There is currently not a drawing of the furniture. Please reference the Statement of Work for exact criteria.
Question 2: Please confirm the size of the monitors.
Answer 2: All monitors are 22” W 13.5”H Question 3: Can you identify which monitors are NIPR/SIPR within the 2 rows of 3 monitors at each console position and confirm NIPR/SIPR spacing requirements?
Answer 3: Center position will have unclas systems to the left-hand side, classified systems on the right. Right position will have SIPR on the left and NIPR to the right. Left position will have NIPR to the right and SIPR to the left. All monitors will need minimum 2” space between them.
Question 4: Please confirm the quantity and size of the CPUs and/or laptops to be stored in the equipment cabinets at each console position.
Answer 4: At least 3 laptops and at least 8 CPUs with potential for future expansion. Standard size CPU’s and laptops.
Question 5: Can you identify which CPUs/laptops are NIPR/SIPR and confirm the NIPR/SIPR spacing requirements?
Answer 5: 2 SIPR and 2 NIPR; remaining are classified and unclassified systems independent from NIPR/SIPR.
Question 6: Do the separate cable trays require separation for NIPR/SIPR? If so, please confirm the spacing.
Answer 6: Cable trays do not need to be separated. Only the monitors require 2” separation and CPUs require ½ meter separation.
Question 7: Can you describe what is meant be “half-moon shaped” in reference to the credenza as it is unclear what is expected? Is there one credenza to be shared by the three consoles or should each position have a credenza?
Answer 7: Credenza should have ability to lay flush against the wall/flat surface and when facing the credenza individual will have 180-degree view of binder storage. Credenza can be placed between controller positions in the center position or on and adjacent wall. Must be movable and not fixed to any furniture.
Question 8: Can the site accept a 53’ trailer? Is there a dock or forklift for offload?
Answer 8: The base can accept all commercial delivery trucks and forklift is available.
Question 9: Do you require plexi-glass inlay for the Credenza work surface as well?
Answer 9: No Question 10: What are the two rectangular shapes located above the consoles and can they be moved for a potential Credenza location?
Answer 10: Those are for NIPR and SIPR printers. Credenza can go under center console or in the vicinity of workstations; within arms reach +/- a few feet when at station etc.
Question 11: Can the Shredder be moved as this may be a possible location for Credenza?
Answer 11: Yes Question 12: To ensure we meet “5.3.1 Product and installation must meet NSTISSAM Tempest standards” can you provide the standard.
Answer 12: Radio’s have to be placed 3 meters from classified systems, CPU’s ½ meter apart and 5cm for cable management. As long as the furniture has the ability, configuring and positioning of equipment will be done by the Command Post/Comm Flight