W50S9A-21-Q-0004 Attach 6. Hangar Fire Suppression As-built (2019).pdf
PDF 933 KB Posted
- Attached to
- Maintain Fire Suppression Systems Federal contract opportunity
- Solicitation number
- W50S9A-21-Q-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S9A-21-Q-0004 Amend 001 Combined Synopsis_Solicitation.pdf | ||
| W50S9A-21-Q-0004 Combined Synopsis_Solicitation.pdf | ||
| W50S9A-21-Q-0004 Attach 4. Hangar Fire Protection Specs (1994).pdf | ||
| W50S9A-21-Q-0004 PWS.pdf | ||
| W50S9A-21-Q-0004 QASP.pdf | ||
| W50S9A-21-Q-0004 Attach 1. MDEQ Wastewater PFAS Sampling Guidance.pdf | ||
| W50S9A-21-Q-0004 Attach 2. PFAS in 50k Gallon Pump House (June 2019).pdf | ||
| W50S9A-21-Q-0004 Attach 3. Hangar Fire Protection Drawings (1994).pdf | ||
| W50S9A-21-Q-0004 Attach 5.Hangar Fire Suppression O&M (2019).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D
W e s u p p o r t n c o u r a g e
N I C
E T c r t i f i c a t i o n
A L
A R
M
C
O N
T R
O L
S
Y S
T E
M S
I N
C
P H
O N
E
F
A X
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
R K
F
E L
Y
R E
P A
I
H
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N D
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
FS-00
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
ROLAND R. WRIGHT UTAH AIR NATIONAL GUARD
765 North 2200 West
Salt Lake City, Utah
Repair Hangar Fire Suppression Systems, USEB182001
W911YP18B2300
Back BoxItem
Description
Symbol Legend
Manufacturer Part No.
Qty.
Model No.
Electrical Installation Notes
1. Control panel requires a dedicated AC power circuit. 120 VAC, 50/60 Hz, 20 A.
2. Route all field wiring through the appropriate conduit knockouts, then to the appropriate circuit terminals. Provide adequate wire length to allow strain relief.
3. The following cable requirements apply to Initiating Device Circuits (IDC):
Type FPLP (or approved substitution), No. 16 AWG minimum
4. Class A circuits shall be installed in a looped conduit, raceway, or cable system (i.e., outgoing and return conductors may not be installed in the same conduit/raceway/cable or enclosure) with the following exceptions:
a) Single conduit/raceway/cable drops to individual devices or appliances shall be permitted.
b) Single conduit/raceway/cable drops to multiple devices or appliances installed within a single room not exceeding 1000 square feet in area shall be permitted.
5. Recommended minimum separation between outgoing and return cables of a Class-A circuit is 12 inches where the cable is installed vertically and 48 inches where the cable is installed horizontally.
6. Install manual release stations so that operable part is located at least 42" a.f.f., but not more than 48" a.f.f. Install all manual release stations at a uniform height.
Definitions
A.F.F. = Above Finished Floor
AUX = Auxiliary power circuit, 24 volt, DC.
FACP = Fire Alarm Control Panel
IDC = Initiating Device Circuit: A circuit to which automatic manual initiating devices are connected where the signal received does not identify the individual device operated.
NAC = Notification Appliance Circuit: A circuit or path directly connected to a notification appliance(s).
RELEASE = A circuit used to actuate fire suppression system release devices.
HANGAR 19 - FIRE PROTECTION SYSTEM DEMOLITION PLAND-02
DRAWING
NUMBER
DESCRIPTION
D-01 HANGAR 3 - FIRE PROTECTION SYSTEM DEMOLITION PLAN
FS-01
FS-02
FS-03
FS-04 HANGAR 19 - FOAM MANUAL RELEASE STATION PLAN
HANGAR 3 - HEAT DETECTION SYSTEM PLAN
HANGAR 3 - FOAM MANUAL RELEASE STATION PLAN
HANGAR 19 - HEAT DETECTION SYSTEM PLAN
WD-01 HANGAR 3 - FIRE ALARM / FOAM RELEASING CONTROL PANEL WIRING DIAGRAM
WD-02 HANGAR 19 - FIRE ALARM / FOAM RELEASING CONTROL PANEL WIRING DIAGRAM
ID-01 INSTALLATION DETAILS
FS-00 TITLE/LEGEND SHEET
FIRE ALARM/RELEASING CONTROL PANEL (EXISTING) PROTECTOWIRE FS-2000 FS-2000 2
INCLUDED
HEAT DETECTOR, RATE COMPENSATED, 160°F (NEW) KIDDE-FENWAL 12-E27121-000-03-0T DETECT-A-FIRE 109
STANDARD 4"-SQUARE
ELECTRICAL BOX
SURGE PROTECTION DEVICE FOR 120VAC CKT (NEW) DITEK DTK-120SRD DTK-120SRD 3
HINGED
TERMINAL BOX
CLEAR TAMPER COVER W/ SOUNDER (NEW) STI STI-13020CY STI-13020CY 12
N/A
SIGN, 24"H X 20"W FOR FOAM RELEASE STATION (NEW) ACS CUSTOM CUSTOM 12
N/A
FOAM MANUAL RELEASE STATION, YELLOW (NEW) SIGCOM SGX-32SK1-YL SGX-32SK1-YL 12
INCLUDED
FIRE ALARM MANUAL PULL STATION EXISTING EXISTING EXISTING
N/A
AUDIBLE NOTIFICATION APPLAINCE EXISTING EXISTING EXISTING
N/A
ALARM PRESSURE SWITCH (WATERFLOW INDICATOR) EXISTING EXISTING EXISTING
N/A
VALVE TAMPER SWITCH EXISTING EXISTING EXISTING
N/A
SOLENOID VALVE EXISTING EXISTING EXISTING
N/A
APS
TS
SV
INSTALLED IN CONDUIT: YESSHIELDED: NOTWISTED: N/AGAUGE: #16 AWG MINIMUMCABLE TYPE: FPLP (OR APPROVED SUBSTITUTION)
CLASS: N/ASIGNALING LINE CIRCUIT (SLC): STYLE: N/A
ALARM INITIATION
SYSTEM TYPE: CONVENTIONAL (IDC) ADDRESSABLE
INITIATING DEVICE CIRCUIT (IDC): CLASS: A
SCOPE OF WORK:
1. THIS PROJECT IS A MODIFICATION OF EXISTING FIRE ALARM / FOAM RELEASING SYSTEMS PROTECTING HANGAR 3
AND HANGAR 19.
2. ALL FIRE ALARM / FOAM RELEASING CONTROL COMPONENTS ARE EXISTING AND ARE TO REMAIN IN SERVICE.
3. DEMOLISH EXISTING LINEAR HEAT DETECTORS. 2 ZONES OF LINEAR HEAT DETECTOR IN HANGAR 3 AND 2 ZONES
OF LINEAR HEAT DETECTOR IN HANGAR 19. UNLESS PLANNED TO BE REUSED FOR NEW SYSTEM, DEMOLISH
ASSOCIATED WIRING, CONDUIT, BOXES AND OTHER DEDICATED COMPONENTS. ANY REUSED COMPONENTS
MUST MEET ALL REQUIREMENTS OF NEW SYSTEM.
4. INSTALL NEW KIDDE DETECT-A-FIRE RATE COMPENSATED HEAT DETECTORS. HEAT DETECTOR TEMPERATURE
RATING SHALL BE BETWEEN 160°F AND 170°F.
HEAT DETECTOR CIRCUITS SHALL BE INSTALLED IN A CLASS-A CONFIGURATION. ALL HEAT DETECTOR WIRING
SHALL BE IN MINIMUM 3/4" EMT CONDUIT. HEAT DETECTOR PIGTAIL CONNECTIONS SHALL BE TERMINATED USING
WAGO SPLICING CONNECTORS.
HEAT DETECTOR CONFIGURATION SHALL BE CROSS-ZONED WITH DETECTORS ARRANGED IN A CHECKERBOARD
PATTERN SO THAT ADJACENT DETECTORS ARE WIRED TO OPPOSITE ZONES. DETECTOR SPACING SHALL BE
25' X 25' MAXIMUM COVERAGE AS SPECIFIED. PER PROJECT SPECIFICATION, NFPA 72 SPACING REDUCTION FOR
CEILING HEIGHT IS NOT REQUIRED.
5. EXISTING FIRE ALARM / FOAM RELEASING PANELS SHALL BE RECONFIGURED AS NECESSARY TO SUPPORT THE
SEQUENCE OF OPERATION.
6. DEMOLISH ALL EXISTING FOAM MANUAL RELEASE STATIONS AND CONDUIT. EXISTING FOAM MANUAL RELEASE
STATION CONDUCTORS SHALL BE REUSED.
7. REPLACE ALL EXISTING FOAM MANUAL RELEASE STATIONS AND INSTALL 2 NEW STATIONS IN HANGAR 3, ADJACENT TO EXISTING FIRE ALARM MANUAL PULL STATIONS LOCATED ON THE NORTH AND SOUTH WALLS NEAR
THE AIRCRAFT DOOR.
8. CONDUIT FOR NEW FOAM RELEASE STATIONS SHALL BE 3/4" MINIMUM. NEW CONDUIT AND ASSOCIATED FITTINGS
SHALL BE WATERTIGHT. ROUTE CONDUIT INTO BOTTOM OF FOAM MANUAL RELEASE STATIONS. PROVIDE THE
LOW POINT OF NEW CONDUIT WITH A DRAIN. DRAIN RATING SHALL BE NEMA TYPE 4 OR BETTER. FLEXIBLE
CONDUIT IS NOT PERMITTED. SEE SHOP DRAWING SHEET ID-1.
9. NEW FOAM MANUAL RELEASE STATIONS SHALL BE NEMA TYPE 4 OR BETTER. FOAM MANUAL RELEASE STATIONS
SHALL BE YELLOW AND REQUIRE A KEY TO BE RESET. PROVIDE A TAMPER COVER WITH AUDIBLE ALARM.
TAMPER COVER SHALL BE FURNISHED WITH YELLOW PORTIONS AND THE LETTERING ON THE COVER SHALL READ
"FOAM". NEW FOAM MANUAL RELEASE STATIONS SHALL BE FURNISHED WITH SIGN AS SPECIFIED. SEE SHOP
DRAWING SHEET ID-1.
10. FURNISH AND INSTALL NEW WIRE AS REQUIRED. NEW WIRE SHALL BE #16AWG MINIMUM. PULL ALL CONDUCTORS
SPLICE FREE. CONDUCTORS SHALL BE CONTINUOUS FROM DEVICE TO DEVICE. THE USE OF WIRE NUTS, CRIMPED CONNECTORS, OR TWISTING OF CONDUCTORS IS PROHIBITED.
11. INSTALL SURGE PROTECTION DEVICES (SPD) TO PROTECT ALL 120VAC PRIMARY POWER CIRCUITS SERVING THE
EXISTING FIRE ALARM / FOAM RELEASING SYSTEM CONTROL PANELS AND ANY ASSOCIATED SUB-PANELS. SPD
SHALL BE LOCATED IN AN ADJACENT HINGED TERMINAL BOX.
12. INSTALL SURGE PROTECTION DEVICES FOR ANY INITIATING DEVICE CIRCUIT OR NOTIFICATION APPLIANCE
CIRCUIT THAT ENTERS OR LEAVES A FACILITY'S EXTERIOR ENCLOSURE. SPD MUST BE PROVIDED NEAR WHERE
THE CIRCUIT ENTERS OR LEAVES THE FACILITY, PRIOR TO CONNECTION TO ANY OTHER DEVICES WHEN
FEASIBLE. SPD IS NOT REQUIRED FOR DEVICES CONNECTED DIRECTLY TO THE FACILITY EXTERIOR WHEN THE
FACILITY ITSELF IS PROVIDED WITH LIGHTNING PROTECTION.
13. DEMOLISH EXISTING ULTRAVIOLET/INFRARED (UV/IR) FLAME DETECTORS. REMOVE EXISTING CONDUIT FROM
FLAME DETECTOR LOCATION TO NEAREST JUNCTION BOX. REMOVE EXISTING FLAME DETECTOR CIRCUIT
WIRE/CABLE TO NEAREST JUNCTION BOX. TRIM EXCESS LENGTH AND LABEL ABANDONED CONDUCTORS AS
"SPARE" AND LEAVE COILED IN NEAREST JUNCTION BOX. PROVIDE COVER(S), PLUG(S) ETC. FOR EXISTING
JUNCTION BOX AS REQUIRED SO THAT JUNCTION BOX HAS A COVER AND NO OPEN KNOCKOUTS OR HUBS.
14. HANGARS ARE HAZARDOUS/CLASSIFIED LOCATIONS UP TO 18" A.F.F. ALL AREAS OF THE HANGARS HIGHER THAN
18" A.F.F. ARE ORDINARY.
15. EACH HANGAR IS PROTECTED BY TWO (2) OVERHEAD FOAM ZONES DESIGNATED AS "EAST BAY OVERHEAD FOAM
ZONE" AND "WEST BAY OVERHEAD FOAM ZONE". EACH OVERHEAD FOAM ZONE IS FURNISHED WITH ITS OWN
VALVE.
ID-02 SEQUENCE OF OPERATION
FS2000
TVSS
M
F
THIS SHOP DRAWING SET CONTAINS THE
FOLLOWING SCHEDULE OF MATERIAL
SUBMITTALS ITEMS:
ITEM 4- HEAT DETECTOR SHOP
DRAWINGS AND
CALCULATIONS
ITEM 5- HEAT DETECTOR WIRING
ITEM 6- HEAT DETECTOR CONDUIT
ITEM 10- HEAT DETECTOR SHOP
DRAWINGS AND
CALCULATIONS
ITEM 11- RELEASING STATION WIRING
ITEM 12- RELEASING STATION
CONDUIT
ITEM 13- RELEASING STATION
SIGNAGE
ITEM 16- SURGE PROTECTION DEVICE
TERMINAL BOXES
Reviewed by:
Eric Rossi
Certified Senior Engineering Technician
N.I.C.E.T. Certification No. 088924, Level IV
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
3 01/04/2019 ER REVISE DOOR LOCATION, DELETE FOAM RELEASE STATION
4 05/24/2019 ER AS-BUILT
F F
M
M
F
TS
M
TS
M
APS
M
F
F
M
FF
TS
U
V
U
V
U
V
U
V
SV
HANGAR 3
REMOVE ALL LINEAR HEAT DETECTOR AND
ATTACHMENTS FROM HANGAR CEILING.
U
V
U
V
HANGAR 3
APS
TS
TS
APS
SV
SV
HANGAR 3 - FIRE PROTECTION SYSTEM DEMOLITION PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
KEYED NOTES:
1 REMOVE EXISTING MANUAL RELEASE STATION. REMOVE
EXISTING CONDUIT TO NEAREST JUNCTION BOX. LEAVE
EXISTING MANUAL RELEASE CIRCUIT WIRE/CABLE IN PLACE
FOR FUTURE USE.
2 REMOVE EXISTING FLAME DETECTOR. REMOVE EXISTING
CONDUIT FROM FLAME DETECTOR TO NEAREST JUNCTION
BOX. REMOVE EXISTING FLAME DETECTOR CIRCUIT
WIRE/CABLE TO NEAREST JUNCTION BOX. LABEL
ABANDONED CONDUCTORS AS "SPARE" AND LEAVE COILED IN
NEAREST JUNCTION BOX. PROVIDE COVER(S), PLUG(S) ETC.
FOR EXISTING JUNCTION AS REQUIRED SO THAT JUNCTION
BOX HAS A COVER AND NO OPEN KNOCKOUTS OR HUBS.
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
C
T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
D-01
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
A I R
S
U
P
S T
A I R
S
U
P
STAIRS UP
F
M
M
F
F
M
APS
TS
TS
APS
F
M
TS
TS
F
F M
U
V
U
V
U
V
U
V
U
V
U
V
TS
TS
SV SV
REMOVE ALL LINEAR HEAT DETECTOR AND
ATTACHMENTS FROM HANGAR CEILING.
HANGAR 19
U
V
F S
HANGAR 19 - FIRE PROTECTION SYSTEM DEMOLITION PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
KEYED NOTES:
1 REMOVE EXISTING MANUAL RELEASE STATION. REMOVE
EXISTING CONDUIT TO NEAREST JUNCTION BOX. LEAVE
EXISTING MANUAL RELEASE CIRCUIT WIRE/CABLE IN PLACE
FOR FUTURE USE.
2 REMOVE EXISTING FLAME DETECTOR. REMOVE EXISTING
CONDUIT FROM FLAME DETECTOR TO NEAREST JUNCTION
BOX. REMOVE EXISTING FLAME DETECTOR CIRCUIT
WIRE/CABLE TO NEAREST JUNCTION BOX. LABEL
ABANDONED CONDUCTORS AS "SPARE" AND LEAVE COILED IN
NEAREST JUNCTION BOX. PROVIDE COVER(S), PLUG(S) ETC.
FOR EXISTING JUNCTION AS REQUIRED SO THAT JUNCTION
BOX HAS A COVER AND NO OPEN KNOCKOUTS OR HUBS.
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
D-02
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
WEST BAY OVERHEAD FOAM ZONE
EAST BAY OVERHEAD FOAM ZONE
ZONE 1
ZONE 2
ZONE 1
ZONE 3
ZONE 3
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 3
ZONE 3
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 3
ZONE 3
ZONE 1
ZONE 1
ZONE 1
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 4
ZONE 4
ZONE 4
ZONE 4
ZONE 4
ZONE 2
ZONE 4
19'-0" 19'-0" 23'-8" 23'-8" 19'-0" 19'-0" 11'-2"11'-2"
23'-6"
23'-6"
12'-6"
9'-0"
23'-0"
23'-0"
23'-0"
F S
HANGAR 3
C E
I L I N
G
P
E A
K
DRAFT CURTAIN DRAFT CURTAIN
12'-6"
HANGAR 3
12'-0"
ZONE 2
ZONE 2
ZONE 2 ZONE 2 ZONE 2
ZONE 1
ZONE 4
ZONE 4
ZONE 4
ZONE 3ZONE 3ZONE 3ZONE 3
ZONE 3
ZONE 3 ZONE 3 ZONE 3
ZONE 4
ZONE 4ZONE 4
ZONE 4
ZONE 4
HANGAR 3 - HEAT DETECTION SYSTEM PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
GENERAL NOTES
1. HEAT DETECTORS TO BE INSTALLED WITHIN 1 FOOT OF THE
UNDERSIDE OF THE ROOF DECK.
2. HEAT DETECTOR SPACING SHALL NOT EXCEED 25' X 25'.
3. HEAT DETECTOR INITIATING DEVICE CIRCUIT WIRING SHALL
BE INSTALLED IN EMT CONDUIT, 3/4" MINIMUM.
KEYED NOTES
HEAT DETECTOR MUST BE LOCATED WITHIN 3'-0" OF
CEILING PEAK
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
FS-01
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
HANGAR 3HANGAR 3
JJJ
J
J
J
J
J
J
J J
J
J
J
APS
TS
TS
APS
J
TS
SV
SV
F
M
NEW
M
NEW
F
M
NEW
M
NEW
M
NEW
F
M
NEW
F
J
F S
F
F
M
NEW
F
F
T V
S S
REMAIN IN CURRENT
LOCATION
LOCATE DIRECTLY
EAST OF EYWEASH
STATION
EAST OF WINDOW.
MNIMUM 5' SEPARATION FROM
FIRE ALARM PULL STATION
J
BETWEEN DOOR AND
FOAM MONITOR
MINIMUM 5' SEPARATION
FROM FIRE ALARM PULL STATION
LOCATE AS SHOWN
L O
C A
R
E C
T
U
E Y
E W
A S
H
S
T A
T I O
N
LOCATE WEST OF WINDOW, BETWEEN
WINDOW AND 110AC OUTLET
AS SHOWN
REMAIN IN CURRENT
LOCATION
DIRECTLY EAST OF
FIRST WINDOW
HANGAR 3 - FOAM MANUAL RELEASE STATION PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
GENERAL NOTES
1. ALL FIRE PROTECTION SYSTEM CONTROLS ARE EXISTING
AND TO REMAIN IN SERVICE.
2. ALL FIRE PROTECTION SYSTEM FIELD DEVICES ARE EXISTING
AND TO REMAIN IN SERVICE UNLESS NOTED OTHERWISE.
3. EXISTING CONDUIT AND CABLE ARE TO REMAIN IN SERVICE.
4. NEW FOAM MANUAL RELEASE STATIONS SHALL BE INSTALLED
SO THAT THEY ARE UNOBSTRUCTED, READILY ACCESSIBLE,
AND LOCATED WITHIN 10' OF EXITS AS SHOWN ON THIS
DRAWING.
MAINTAIN A MINIMUM SEPARATION DISTANCE OF 5' BETWEEN
THE GENERAL FIRE ALARM PULL STATIONS AND FOAM MANUAL
RELEASE STATIONS. WHERE POSSIBLE, INSTALL THE FOAM
MANUAL RELEASE STATIONS ON THE OPPOSITE SIDE OF THE
DOOR FROM THE GENERAL FIRE ALARM PULL STATIONS.
IF POSSIBLE, LOCATE THE FOAM MANUAL RELEASE STATIONS
SO THAT FUTURE STOP STATIONS AND SIGNS MAY BE
INSTALLED (SEE ID-01).
INSTALLER TO CONFIRM LOCATION OF EACH FOAM MANUAL
RELEASE STATION WITH OWNER PRIOR TO INSTALLATION.
KEYED NOTES
NEW MANUAL RELEASE STATION WITH INSTRUCTIONAL SIGN
AND CLEAR PLASTIC TAMPER COVER. SEE DETAIL ON
SHEET ID-01
FURNISH AND INSTALL NEW SURGE PROTECTION DEVICE
(SPD) TO PROTECT ALL 120VAC POWER SUPPLY CIRCUITS
FOR FIRE ALARM/FOAM RELEASING PANEL AND ALL
SUB-PANELS. FOR 120VAC CIRCUITS SERVING MULTIPLE
FIRE PROTECTION SYSTEM PANELS, A SINGLE SPD MAY BE
FURNISHED.
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
FS-02
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
ZONE 1
ZONE 2
ZONE 2
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 1
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 2
ZONE 4ZONE 3 ZONE 4 ZONE 4 ZONE 4
ZONE 4ZONE 4ZONE 4ZONE 4
ZONE 3 ZONE 3 ZONE 3
ZONE 3
ZONE 3ZONE 3ZONE 3ZONE 3
ZONE 4
WEST OVERHEAD FOAM ZONE
EAST OVERHEAD FOAM ZONE
HANGAR 19
C E
I L I N
G
P
E A
K
DRAFT CURTAIN DRAFT CURTAIN
ZONE 1
ZONE 1
24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-11" 7'-11"
10'-8"
20'-3
21'-0"
21'-0"
21'-0"
21'-0"
10'-8
21'-0"
12'-6"
7'-9
HANGAR 19 - HEAT DETECTION SYSTEM PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
GENERAL NOTES
1. HEAT DETECTORS TO BE INSTALLED WITHIN 1 FOOT OF THE
UNDERSIDE OF THE ROOF DECK.
2. HEAT DETECTOR SPACING SHALL NOT EXCEED 25' X 25'.
3. HEAT DETECTOR INITIATING DEVICE CIRCUIT WIRING SHALL
BE INSTALLED IN EMT CONDUIT, 3/4" MINIMUM.
KEYED NOTES
HEAT DETECTOR MUST BE LOCATED WITHIN 3'-0" OF
CEILING PEAK
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
FS-03
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
HANGAR 19
J
J
J
J
J
J J J
J
J
J
APS
TS
TS
APS
TS
TS
TS
SV SV
F S
M
NEW
F
M
NEW
F
M
NEW
F
M
NEW
F
M
NEW
F
TVSS
A E
S
TVSS
EXISTING RADIO
ALARM TRANSMITTER
HANGAR 19 - FOAM MANUAL RELEASE STATION PLAN
N
32'16'4' 8'0'
SCALE: 1/8"=1'-0"
GENERAL NOTES
1. ALL FIRE PROTECTION SYSTEM CONTROLS ARE EXISTING
AND TO REMAIN IN SERVICE.
2. ALL FIRE PROTECTION SYSTEM FIELD DEVICES ARE EXISTING
AND TO REMAIN IN SERVICE UNLESS NOTED OTHERWISE.
3. EXISTING CONDUIT AND CABLE ARE TO REMAIN IN SERVICE.
4. NEW FOAM MANUAL RELEASE STATIONS SHALL BE INSTALLED
SO THAT THEY ARE UNOBSTRUCTED, READILY ACCESSIBLE,
AND LOCATED WITHIN 10' OF EXITS AS SHOWN ON THIS
DRAWING.
MAINTAIN A MINIMUM SEPARATION DISTANCE OF 5' BETWEEN
THE GENERAL FIRE ALARM PULL STATIONS AND FOAM MANUAL
RELEASE STATIONS. WHERE POSSIBLE, INSTALL THE FOAM
MANUAL RELEASE STATIONS ON THE OPPOSITE SIDE OF THE
DOOR FROM THE GENERAL FIRE ALARM PULL STATIONS.
IF POSSIBLE, LOCATE THE FOAM MANUAL RELEASE STATIONS
SO THAT FUTURE STOP STATIONS AND SIGNS MAY BE
INSTALLED (SEE ID-01).
INSTALLER TO CONFIRM LOCATION OF EACH FOAM MANUAL
RELEASE STATION WITH OWNER PRIOR TO INSTALLATION.
KEYED NOTES
NEW MANUAL RELEASE STATION WITH INSTRUCTIONAL SIGN
AND CLEAR PLASTIC TAMPER COVER. SEE DETAIL ON
SHEET ID-01.
FURNISH AND INSTALL NEW SURGE PROTECTION DEVICE
(SPD) TO PROTECT ALL 120VAC POWER SUPPLY CIRCUITS
FOR FIRE ALARM/FOAM RELEASING PANEL AND ALL
SUB-PANELS. FOR 120VAC CIRCUITS SERVING MULTIPLE
FIRE PROTECTION SYSTEM PANELS, A SINGLE SPD MAY BE
FURNISHED.
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
FS-04
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
GROUND
120 VAC
SUPPRESSOR
SURGE
DTK-120SRD
DITEK
G B W
XFMR
24V
M
M
M
M
M
M
F
F
F
F
F
F
F
APS
TS
TS TS
TSTS
TS
TSTS TS
TB2
RANGE
X10
TB1
X1
ALARM
SCANNER
ZONE
43 5 6
ON
1 2 3
TB3
TB3
R
B
PUMP 1
N.O. CONTACT
PUMP 2
N.O. CONTACT
F
APS APS
LA LA
TS TS
TSTS
LA
TS
TS
TS
TS
TS
XFMR
SW-24 POWER
DC
Z O
N E
AC IN
12V
SUPPLY
AC
BATT
STEALTH LABS.
WF WF WF
JM
TB3
31 2 54 117 86 9 10 12
S I G
G
N
L
TB2
JX
C
A L A
R M
NO
NC
S I G
NO
C
C
NC
T R
B L
COMMON (-)COMMON (-)
NO
NC
TB1
T R
B L
F1
F2
CB1
KA
KT
F4
MOD-
TBA642 3 5
TE2
JB
KP
F3
1-1
C O
N T
R O
L
C
A
Z
M
HANGAR 3
HANGAR CEILING EAST
HEAT DETECTORS
HANGAR 3
HANGAR CEILING EAST
HEAT DETECTORS
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
1-2
Z O
HANGAR CEILING WEST
HEAT DETECTORS
HANGAR 3
HANGAR CEILING WEST
HEAT DETECTORS
SPARE SPARE
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
1-3
Z O
SPARE SPARE
MANUAL
RELEASE
HANGAR 3
PULL
STATIONS
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-1
Z O
FIRE PUMP
NO. 1
RUNNING
FIRE PUMP
NO. 2
RUNNING
PUMP HOUSE
PULL
STATION
SPARE
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-2
W A
T E
R F
L O
W
Z
O N
E
C
A
T E
R F
L O
W
Z
O N
E
C
A
N. MONITOR
WATERFLOW
HANGAR 3
S. MONITOR
WATERFLOW
BLDG. 3 (EAST)
OVERHEAD
APS
BLDG. 3 (WEST)
OVERHEAD
APS
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-3
W A
T E
R F
L O
W
Z
O N
E
C
A
U
P E
R V
I S
O R
Y
Z
O N
E
C
A
DRY PIPE SYS.
APS
PUMP HOUSE
WET SYSTEM
WATERFLOW
BLDG. 3 (EAST)
OVERHEAD
LOW AIR
BLDG. 3 (WEST)
OVERHEAD
LOW AIR
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
3-1
S U
P E
R V
I S
O R
Y
Z
O N
E
C
A
P E
R V
I S
O R
Y
Z
O N
E
C
A
MAIN OVERHEAD
VALVE TAMPER SW.S
HANGAR 3
TEST HEADER
VALVE TAMPER SW.S
HANGAR 3
DRY PIPE SYS.
VALVE TAMPER/LOW AIR SW.S
HANGAR 3
HEAT TRACE
POWER LOSS
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
3-2
S U
P E
R V
I S
O R
Y
Z
O N
E
C
A
P E
R V
I S
O R
Y
Z
O N
E
C
A
VARIABLE TONE
SPKR. PANEL
TROUBLE
PUMP HOUSE
8" VALVE TAMPER
SWITCHES
SURGE TANK
10" VALVE
TAMPER SW.S
PUMP HOUSE
10" VALVE
TAMPER SW.S
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
3-3
S U
P E
R V
I S
O R
Y
Z
O N
E
C
A
P E
R V
I S
O R
Y
Z
O N
E
C
A
PUMP HOUSE
8" VALVE
TAMPER SW.
PUMP HOUSE
6" VALVE
TAMPER SW.
PUMP HOUSE
RADIO CONTROL
VALVE TAMPER SW.
PUMP HOUSE
PIV & 10" VALVE
TAMPER SW.
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
4-1
S U
P E
R V
I S
O R
Y
Z
O N
E
C
A
P E
R V
I S
O R
Y
Z
O N
E
C
A
PUMP NO. 1
AC POWER LOSS
PUMP HOUSE
PUMP NO. 1
PHASE REVERSAL
PUMP HOUSE
PUMP NO. 2
AC POWER LOSS
PUMP HOUSE
PUMP NO. 2
PHASE REVERSAL
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
5-1
A U
D I B
P
A N
D E
R
C
A
D I B
P
A N
D E
R
C
A
INDICATING
APPLIANCES
HANGAR 3
INDICATING
APPLIANCES
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
4-2
BLDG. 3
OVERHEAD
SELECTOR
BLDG. 3
OVERHEAD
PROPORTIONER
BLDG. 3 (EAST)
OVERHEAD
VALVE TAMPER SW.S
BLDG. 3 (WEST)
OVERHEAD
VALVE TAMPER SW.S
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
4-3
BLDG. 3
MONITOR
SELECTOR
BLDG. 3
MONITOR
PROPORTIONER
BLDG. 3
MAIN MONITOR
VALVE TAMPER SW.S
PUMP HOUSE
WET SYSTEM
VALVE TAMPER SW.S
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
5-2
BLDG. 3 (EAST)
OVERHEAD
SOLENOID
BLDG. 3 (WEST)
OVERHEAD
SOLENOID
HANGAR 3
NORTH MONITOR
VALVE TAMPER SW.S
HANGAR 3
SOUTH MONITOR
VALVE TAMPER SW.S
BELL
WAIL
HORN
INTERRUPT
T R
O U
B L E
TB2 10 9
J1
P O
L A
R I
T P
U T
S I G
N A
L
S P
A R
E
8 7
R E
V E
R S
I N
G
R E
V E
R S
I N
G
N O
N P
O L A
R I
TB1
V
D C
P O
W E
R
A L A
P U
T
I N
P U
T
T O
N E
V
D C
129 10 11
T R
O U
B L E
13 14 15 16
C K
T
C K
T
SPLF-25RHR
(LOCATE IN 2ND FL.
OFFICE AREA)
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
5-3
BLDG. 3
N. MONITOR
SOLENOID
BLDG. 3
S. MONITOR
SOLENOID
LOW TANK
WATER
LEVEL
PUMP HOUSE
6" & PRIMELINE
VALVE TAMPER SW.
LS
TS
TS
TS
TS TS
TS TS
TS
(DISABLE
K4
BLK
RED
NC
NO
C
AFFF DISCHARGE
AFFF PRE-DISCHARGE
AFFF PRE-ALARM
K2
K3
K1
RED
GRN
YEL
NC
NO
C
YEL
RED
NO
C
NC
BLK
NO
C
NC
GRN
NC
C
NO
YEL
NO
BLK
RED
C
NC
K1 & K2)
F F F
SV SV SV SV SV SV SV SV
MODIFICATIONS
ADJACENT TO CONTROL PANEL
INSTALL IN HINGED ENCLOSURE
Z O
O
O
O
ZONE 5 ZONE 6
ZONE 7 ZONE 8
ZONE 9
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
WD-01
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
HANGAR 3 - FIRE ALARM / FOAM RELEASING CONTROL PANEL WIRING DIAGRAM
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
JM
TB3
31 2 54 117 86 9 10 12
S I G
G
N
L
TB2
JX
C
A L A
R M
NO
NC
S I G
NO
C
C
NC
T R
B L
COMMON (-)COMMON (-)
NO
NC
TB1
T R
B L
F1
F2
CB1
KA
KT
F4
MOD-
TBA642 3 5
TE2
JB
KP
F3
1-1
C O
N T
R O
L
C
A
HANGAR CEILING EAST
HEAT DETECTORS
HANGAR 19
HANGAR CEILING EAST
HEAT DETECTORS
Z O
EARTH GROUND
120 VAC
SUPPRESSOR
SURGE
DTK-120SRD
DITEK
G B W
XFMR
24V
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
1-2
Z O
HANGAR CEILING WEST
HEAT DETECTORS
HANGAR 19
HANGAR CEILING WEST
HEAT DETECTORS
Z O
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
1-3
Z O
O
SPARE
MANUAL
RELEASE
STATIONS
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-1
Z O
PULL
STATIONS
SPARE
W A
T E
R F
L O
W
C
A
NORTH
MONITOR
WATERFLOW
SOUTH
MONITOR
WATERFLOW
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-2
W A
T E
R F
L O
W
C
A
HANGAR CEILING
EAST BAY PRE-ACTION
FOAM APS
HANGAR CEILING
WEST BAY PRE-ACTION
FOAM APS
W A
T E
R F
L O
W
C
A
DRY PIPE
SPRINKLER APS SPARE
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
2-3
S U
P E
R V
I S
O R
Y
C
A
HANGAR CEILING
EAST BAY LOW AIR
PRESSURE
HANGAR CEILING
WEST BAY LOW AIR
PRESSURE
S U
P E
R V
I S
O R
Y
C
A
MAIN OVERHEAD
VALVE TAMPER
SWITCHES
TEST HEADER
VALVE TAMPER
TE1
72 3 4 5 6 108 9
1211 171413 1615 2018 19
TE2
MOD-
JM
3-1
S U
P E
R V
I S
O R
Y
C
A
DRY PIPE SPRINKLER
VALVE TAMPER
LOW AIR SWITCHES
HEAT TRACE
POWER LOSS
S U
P E
R V
I S
O R
Y
C
A
VARIABLE TONE
PANEL
TROUBLE
PUMP HOUSE
MAIN VALVE
TAMPER SWITCH
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
3-2
HANGAR CEILING
EAST BAY
SUPERVISORY SW.S
HANGAR CEILING
WEST BAY
SUPERVISORY SW.S
HANGAR CEILING
EAST BAY
SOLENOID VALVE
HANGAR CEILING
WEST BAY
SOLENOID VALVE
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
3-3
GENERAL MONITOR
SUPERVISORY
SWITCHES
CONCENTRATE TANK
WATER INLET
TAMPER SWITCHES
CONCENTRATE TANK
FOAM OUTLET,
OVERHEAD
SPARE
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
4-1
NORTH MONITOR
VALVE TAMPER/LOW
AIR SWITCHES
SOUTH MONIOTOR
VALVE TAMPER/LOW
AIR SWITCHES
CONCENTRATE TANK
FOAM OUTLET,
MONITOR
NORTH
MONITOR
M
M
M
M
M
FFFFFFFFFF
APS
APS
LA LA
TS
TS TS
TS
LA
TS
TS
LA LA
TS
TS
TS
TSTS
TS
TS
TS
B1R
TB3
TB3
ON
653 4
ZONE
SCANNER
ALARM
X1
TB1
X10
RANGE
TB2
2C
1C
1B
2B
2A
1A
C4
C3
ZV-91
C1
C2
4 4
3 3
78910TB2
S P
A R
E
T R
O U
B L E
INTERUPT
HORN
WAIL
BELL
1 1
J1
N O
N P
O L A
R I
V E
R S
I N
G
R E
V E
R S
I N
G
P O
L A
R I
TB1
I G
N A
L
O U
T P
U T
4 3 2 1
T O
N E
I N
P U
T
P O
W E
R
V
D C
V
D C
A L A
P U
T
161514131211109
T R
O U
B L E
C K
T
C K
T
1 2
Z O
N E
AC IN 12V BATT
AC
DC
STEALTH LABS.
SW-24 POWER
SUPPLY
K1
NC
C
NO
NO
C
NC
K2
K3
NC
C
NO
AFFF PRE-ALARM
AFFF PRE-DISCHARGE
AFFF DISCHARGE
XFMR
JRT
JA JA
WF WF
APS
NC
C
NO
K4
C
NO
NC
C
NO
NC
(DISABLE
K1 & K2)
43 76
TR1
JY
13 1514 16 17 18 19
MOD-
REV, D
4-2
VALVE HOUSE
LOW TEMP
SPARE
SOUTH
MONITOR
SPARE
RED
BLK
RED
BLK
RED
BLK
YEL
GRN
RED
YEL
YEL
GRN
TS
SV SV SV
SV SV SV SV
MODIFICATIONS
ADJACENT TO CONTROL PANEL
INSTALL IN HINGED ENCLOSURE
Z O
O
O
O
ZONE 5 ZONE 6
ZONE 7 ZONE 8
ZONE 9
ZONE 10
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
K
E
C
I T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
WD-02
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
HANGAR 19 - FIRE ALARM / FOAM RELEASING CONTROL PANEL WIRING DIAGRAM
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
STOP
FOAM
SYSTEM
3" HIGH RED
BLOCK LETTERING
STOP
TO STOP FOAM SYSTEM
PRESS AND CONTINUOUSLY
HOLD "STOP" BUTTON UNTIL
RELIEVED BY EMERGENCY
RESPONDERS. THERE MAY
BE UP TO A 30 SECOND
DELAY AFTER PRESSING
THE STOP BUTTON BEFORE
THE FOAMS STOPS.
1" HIGH GREEN
BLOCK LETTERING
SIGNS TO BE SPACED
MAXIMUM 12" APART
SIGN TO HAVE YELLOW
OR LIME/YELLOW
BACKGROUND COLOR
3/4" RIGID CONDUIT
ROUTED AROUND SIGN
AND CONNECTING INTO
BOTTOM OF BOX
START
FOAM
SYSTEM
START
YELLOW MANUAL RELEASE
STATION WITH CLEAR TAMPER
COVER WITH AUDIBLE ALARM
CROUSE-HINDS MODEL
T75M 3/4" T CONDULET
BODY OR EQUAL W/
GASKET AND COVER
CROUSE-HINDS MODEL
CD2 CONDUIT DRAIN 3/4"
OR EQUAL ORDINARY
LOCATION DRAIN
F U
T U
I C
CONNECT LEADS TO
INCOMING INITIATING
DEVICE CIRCUIT
CONDUCTORS
CONNECT LEADS TO OUTGOING
INITIATING DEVICE CIRCUIT
CONDUCTORS
DETECTOR INSTALLS IN
1/2" KNOCKOUT WITH
1/2" LOCKING NUT
BLACK
WHITE
BLACK
WHITE
DESIGNER DRAWN BY
J O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
ID-01
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
INSTALLATION DETAILS
1 FOAM MANUAL RELEASE STATION INSTALLATION
SCALE: NO SCALE
2 DETECT-A-FIRE HEAT DETECTOR
SCALE: NO SCALE
NOTES:
1. CONNECTION TO PIGTAIL LEADS
SHALL BE MADE WITH TERMINAL
BLOCKS.
2. REFER TO INSTALLATION
INSTRUCTIONS FOR COMPLETE
INSTALLATION DETAILS.
3 HEAT DETECTOR INSTALLATION
SCALE: NO SCALE
SIGNAGE NOTES:
1. FURNISH AND INSTALL FOAM SYSTEM "START" SIGN AS SHOWN
ON THIS DETAIL FOR EACH FOAM MANUAL RELEASE STATION.
2. FOAM SYSTEM "STOP" SIGN IS SHOWN FOR REFERENCE ONLY
AND IS NOT FURNISHED UNDER THIS CONTRACT.
3. CHOOSE A LOCATION FOR THE NEW FOAM MANUAL RELEASE
STATION THAT WILL ALLOW ENOUGH SPACE FOR THE FOAM
SYSTEM "START" SIGN AND THE FUTURE FOAM SYSTEM "STOP"
SIGN WHEN POSSIBLE.
4. DO NOT INSTALL BACK-BOXES OR ROUTE CONDUIT IN FRONT OF
SIGN IN A MANNER THAT OBSTRUCTS ANY LETTERING.
4 SURGE PROTECTION DEVICE FOR 120VAC CKT.
SCALE: NO SCALE
DITEK MODEL DTK-120SRD. REFER TO
DITEK DOCUMENT #INT-100130-001 FOR
COMPLETE SPD INSTALLATION
INSTRUCTIONS.
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
3 01/04/2019 ER REVISE DOOR LOCATION, DELETE FOAM RELEASE STATION
KIDDE-FENWAL DETECT-A-FIRE
HEAT DETECTOR
1" X 1/2" BUSHING
1" TEE CONDUIT BODY W/
THREADED HUBS AND COVER
3/4" CONNECTOR w/ BUSHING
3/4" EMT CONDUIT
DESIGNER DRAWN BY
O
B
N
U M
B E
R
DRAWING DATE
SCALE
DRAWING NO.
DRAWING CODE
CHECKED
PROJECT MGR.
BY:
REV
DATE
DESCRIPTION
NUM
CHECK
BY
f o r
N I C
E T
C E
R T
I F
I E
D p p o r c o u r a g e
N I C r t i f i c a t i o n
A L
A R
M
C
O N
T R
S
T E
M S
I N
C
P H
O N
E
S
E
S
A L
T
L
A K
E
C
I T
Y
U
T A
H
T H
I N
K
S
A F
E T
Y
W O
F
E L
Y
R E
P A
N
G A
R
F
I R
E
S
U P
P R
E S
S I O
N
S
Y S
T E
M
H
A N
G A
R
A
N
G A
R
U t a h A ir N a t io n a l G u a r d R o l a n d R
W r ig h t B a s e
N
O R
W
E S
T
S A
T
Y
U
T A
H
10/07/2018
ERIC ROSSI
ER
ER ER
AS NOTED
ID-02
UAG181151-1
0 10/07/2018 ER FOR OWNER REVIEW
SEQUENCE OF OPERATION
ZONE 1: HANGAR 3 EAST HEAT DETECTORS
INPUT
O U
T P
U T
L E
D
I N
D I C
A T
O R
S
G E
N E
R A
L
A
L A
L A
Y
G E
N E
R A
L
T
R O
U B
L A
Y
ZONE 2: HANGAR 3 EAST HEAT DETECTORS
ZONE 1 AND ZONE 2 IN ALARM (CROSS ZONE CONDITION)
ZONE 3: HANGAR 3 WEST HEAT DETECTORS
ZONE 4: HANGAR 3 WEST HEAT DETECTORS
ZONE 3 AND ZONE 4 IN ALARM (CROSS ZONE CONDITION)
ZONE 5: SPARE
ZONE 6: SPARE
ZONE 7: SPARE
ZONE 8: SPARE
ZONE 9: HANGAR 3 FOAM SYSTEM MANUAL RELEASE STATIONS
ZONE 10: HANGAR 3 FIRE ALARM MANUAL PULL STATIONS
ZONE 11: PUMP #1
ZONE 12: PUMP #2
WF-1: HANGAR 3 NORTH FOAM MONITOR WATERFLOW
WF-2: HANGAR 3 SOUTH MONITOR WATERFLOW
WF-3: HANGAR 3 EAST OVERHEAD FOAM WATERFLOW
WF-4: HANGAR 3 WEST OVERHEAD FOAM WATERFLOW
WF-5: HANGAR DRY-PIPE FIRE SPRINKLER SYSTEM WATERFLOW
WF-6: PUMP HOUSE WET FIRE SPRINKLER SYSTEM WATERFLOW
SUPV-1: HANGAR 3 EAST OVERHEAD FOAM LOW AIR PRESSURE
SUPV-2: HANGAR 3 WEST OVERHEAD FOAM LOW AIR PRESSURE
SUPV-3: HANGAR 3 MAIN OVERHEAD VALVE TAMPER SWITCHES
SUPV-4: HANGAR 3 TEST HEADER VALVE TAMPER SWITCHES
SUPV-5: HANGAR 3 DRY PIPE FIRE SYSTEM VALVE TAMPER & LOW AIR PRESSURE
SUPV-6: HEAT TRACE POWER LOSS
SUPV-7: VARIABLE TONE PANEL TROUBLE
SUPV-8: PUMP HOUSE 8" VALVE TAMPER SWITCHES
SUPV-9: PUMP HOUSE SURGE TANK 10" VALVE TAMPER SWITCHES
SUPV-10: PUMP HOUSE 10" VALVE TAMPER SWITCHES
SUPV-11: PUMP HOUSE 8" VALVE TAMPER SWITCH
SUPV-12: PUMP HOUSE 6' VALVE TAMPER SWITCH
SUPV-13: PUMP HOUSE RATIO CONTROL VALVE TAMPER SWITCH
SUPV-14: PUMP HOUSE PIT & 10" VALVE TAMPER SWITCHES
SUPV-15: HANGAR 3 EAST OVERHEAD FOAM VALVE TAMPER SWITCHES
SUPV-16: HANGAR 3 WEST OVERHEAD FOAM VALVE TAMPER SWITCHES
S O
L E
N O
I D
O
V E
R H
E A
D
S
E L E
C T
O R
S O
L E
N O
I D
O
V E
R H
E A
D
P
R O
P O
R T
I O
N E
R
S O
L E
N O
I D
M
O N
I T
L E
C T
O R
S O
L E
N O
I D
M
O N
I T
P
O
P O
R T
I O
N E
R
S O
L E
N O
I D
E
A S
T
O
V E
R H
E A
D
F
O A
M
S
Y S
T E
M
S O
L E
N O
I D
W
E S
T
O
V E
R H
E A
D
F
O A
M
S
Y S
T E
M
S O
L E
N O
I D
N
O R
A
M
M
O N
I T
O R
S O
L E
N O
I D
S
O U
A
M
M
O N
I T
O R
T R
A N
S M
N
D I T
I O
N
T
O
A
L A
C
E I V
I N
G
S
T A
T I O
N
HANGAR 3 - OPERATION MATRIX
ZONE 13: PUMP HOUSE FIRE ALARM MANUAL PULL STATIONS
ZONE 14: SPARE
SUPV-17: HANGAR 3 MAIN MONITOR VALVE TAMPER SWITCHES
SUPV-18: PUMP HOUSE WET FIRE SPRINKLER SYSTEM VALVE TAMPER SWITCHES
SUPV-19: HANGAR 3 NORTH MONITOR VALVE TAMPER SWITCHES
SUPV-20: HANGAR 3 SOUTH MONITOR VALVE TAMPER SWITCHES
SUPV-21: PUMP HOUSE LOW TANK WATER LEVEL
SUPV-22: PUMP HOUSE 6" & PRIME-LINE VALVE TAMPER SWITCHES
ZONE 1: EAST HEAT DETECTORS
INPUT
O U
T P
U T
L E
D
I N
D I C
A T
O R
S
G E
N E
R A
L
A
L A
L A
Y
G E
N E
R A
L
T
R O
U B
L A
Y
ZONE 2: EAST HET DETECTORS
ZONE 1 AND ZONE 2 IN ALARM (CROSS ZONE CONDITION)
ZONE 3: WEST HEAT DETECTORS
ZONE 4: WEST HEAT DETECTORS
ZONE 3 AND ZONE 4 IN ALARM (CROSS ZONE CONDITION)
ZONE 5: SPARE
ZONE 6: SPARE
ZONE 7: SPARE
ZONE 8: SPARE
ZONE 9: SPARE
ZONE 10: FOAM SYSTEM MANUAL RELEASE STATIONS
ZONE 11: FIRE ALARM MANUAL PULL STATIONS
ZONE 12: SPARE
WF-1: NORTH FOAM MONITOR WATERFLOW
WF-2: SOUTH MONITOR WATERFLOW
WF-3: HANGAR EAST OVERHEAD FOAM WATERFLOW
WF-4: HANGAR WEST OVERHEAD FOAM WATERFLOW
WF-5: DRY-PIPE FIRE SPRINKLER SYSTEM WATERFLOW
WF-6: SPARE
SUPV-1: HANGAR EAST OVERHEAD FOAM LOW AIR PRESSURE
SUPV-2: HANGAR WEST OVERHEAD FOAM LOW AIR PRESSURE
SUPV-3: HANGAR MAIN OVERHEAD VALVE TAMPER SWITCHES
SUPV-4: TEST HEADER VALVE TAMPER SWITCHES
SUPV-5: DRY PIPE FIRE SPRINKLER SYSTEM VALVE TAMPER & LOW AIR PRESSURE
SUPV-6: HEAT TRACE POWER LOSS
SUPV-7: VARIABLE TONE PANEL TROUBLE
SUPV-8: PUMP HOUSE MAIN VALVE TAMPER SWITCH
SUPV-9: HANGAR OVERHEAD EAST FOAM SUPERVISORY SWITCHES
SUPV-10: HANGAR OVERHEAD WEST FOAM SUPERVISORY SWITCHES
SUPV-11: COMMON FOAM MONITOR SUPERVISORY SWITCHES
SUPV-12: CONCENTRATE TANK WATER INLET VALVE TAMPER SWITCHES
SUPV-13: NORTH FOAM MONITOR VALVE TAMPER & LOW AIR PRESSURE
SUPV-14: SOUTH FOAM MONITOR VALVE TAMPER & LOW AIR PRESSURE
SUPV-15: VALVE HOUSE LOW TEMPERATURE
SUPV-16: SPARE
S O
L E
N O
I D
H
A N
G A
R
E
A S
T
O
V E
R H
E A
D
F
O A
M
V
A L V
E
S O
L E
N O
I D
H
A N
G A
R
W
E S
T
O
V E
R H
E A
D
F
O A
M
V
A L V
E
S O
L E
N O
I D
O
V E
R H
E A
D
C
O N
C E
N T
R A
N
K
F
O A
M
O
U T
L E
T
S O
L E
N O
I D
S
P A
R E
S O
L E
N O
I D
M
O N
I T
N
C E
N T
R A
N
K
F
O A
M
O
U T
L E
T
S O
L E
N O
I D
N
O R
A
M
M
O N
I T
O R
S O
L E
N O
I D
S
O U
A
M
M
O N
I T
O R
S O
L E
N O
I D
S
P A
R E
T R
A N
S M
N
D I T
I O
N
T
O
A
L A
C
E I V
I N
G
S
T A
T I O
N
HANGAR 19 - OPERATION MATRIX
FOAM RELEASE SEQUENCE OF OPERATION - HANGAR 3
1. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #1 THE FOLLOWING SHALL OCCUR:
1.1. SOUND GENERAL ALARM TONE.
1.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
2. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #2 THE FOLLOWING SHALL OCCUR:
2.1. SOUND GENERAL ALARM TONE.
2.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
3. UPON ACTIVATION OF AT LEAST ONE HEAT DETECTOR ON ZONE #1 AND AT LEAST ONE HEAT
DETECTOR ON ZONE #2 THE FOLLOWING SHALL OCCUR:
3.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
3.2. ENERGIZE HANGAR 3 OVERHEAD SELECTOR SOLENOID.
3.3. ENERGIZE HANGAR 3 OVERHEAD PROPORTIONER SOLENOID.
3.4. ENERGIZE HANGAR 3 MONITOR SELECTOR SOLENOID.
3.5. ENERGIZE HANGAR 3 MONITOR PROPORTIONER SOLENOID.
3.6. ENERGIZE HANGAR 3 EAST OVERHEAD FOAM SYSTEM SOLENOID.
3.7. ENERGIZE HANGAR 3 NORTH FOAM MONITOR SOLENOID.
3.8. ENERGIZE HANGAR 3 SOUTH FOAM MONITOR SOLENOID.
3.9. START FIRE PUMP(S)
4. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #3 THE FOLLOWING SHALL OCCUR:
4.1. SOUND GENERAL ALARM TONE.
4.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
5. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #3 THE FOLLOWING SHALL OCCUR:
5.1. SOUND GENERAL ALARM TONE.
5.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
6. UPON ACTIVATION OF AT LEAST ONE HEAT DETECTOR ON ZONE #3 AND AT LEAST ONE HEAT
DETECTOR ON ZONE #4 THE FOLLOWING SHALL OCCUR:
6.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
6.2. ENERGIZE HANGAR 3 OVERHEAD SELECTOR SOLENOID.
6.3. ENERGIZE HANGAR 3 OVERHEAD PROPORTIONER SOLENOID.
6.4. ENERGIZE HANGAR 3 MONITOR SELECTOR SOLENOID.
6.5. ENERGIZE HANGAR 3 MONITOR PROPORTIONER SOLENOID.
6.6. ENERGIZE HANGAR 3 WEST OVERHEAD FOAM SYSTEM SOLENOID.
6.7. ENERGIZE HANGAR 3 NORTH FOAM MONITOR SOLENOID.
6.8. ENERGIZE HANGAR 3 SOUTH FOAM MONITOR SOLENOID.
6.9. START FIRE PUMP(S)
7. UPON ACTIVATION OF ANY HANGAR 3 FOAM SYSTEM MANUAL RELEASE STATION THE
FOLLOWING SHALL OCCUR:
7.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
7.2. ENERGIZE HANGAR 3 MONITOR SELECTOR SOLENOID.
7.3. ENERGIZE HANGAR 3 MONITOR PROPORTIONER SOLENOID.
7.4. ENERGIZE HANGAR 3 NORTH FOAM MONITOR SOLENOID.
7.5. ENERGIZE HANGAR 3 SOUTH FOAM MONITOR SOLENOID.
7.6. START FIRE PUMP(S)
FOAM RELEASE SEQUENCE OF OPERATION - HANGAR 19
1. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #1 THE FOLLOWING SHALL OCCUR:
1.1. SOUND GENERAL ALARM TONE.
1.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
2. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #2 THE FOLLOWING SHALL OCCUR:
2.1. SOUND GENERAL ALARM TONE.
2.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
3. UPON ACTIVATION OF AT LEAST ONE HEAT DETECTOR ON ZONE #1 AND AT LEAST ONE HEAT
DETECTOR ON ZONE #2 THE FOLLOWING SHALL OCCUR:
3.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
3.2. ENERGIZE OVERHEAD CONCENTRATE TANK FOAM OUTLET SOLENOID.
3.3. ENERGIZE HANGAR 19 EAST OVERHEAD FOAM SYSTEM SOLENOID.
3.4. ENERGIZE MONITOR CONCENTRATE TANK FOAM OUTLET SOLENOID.
3.5. ENERGIZE HANGAR 19 NORTH FOAM MONITOR SOLENOID.
3.6. ENERGIZE HANGAR 19 SOUTH FOAM MONITOR SOLENOID.
3.7. START FIRE PUMP(S)
4. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #3 THE FOLLOWING SHALL OCCUR:
4.1. SOUND GENERAL ALARM TONE.
4.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
5. UPON ACTIVATION OF ANY HEAT DETECTOR ON ZONE #4 THE FOLLOWING SHALL OCCUR:
5.1. SOUND GENERAL ALARM TONE.
5.2. TRANSMIT GENERAL ALARM SIGNAL TO ALARM RECEIVING STATION.
6. UPON ACTIVATION OF AT LEAST ONE HEAT DETECTOR ON ZONE #3 AND AT LEAST ONE HEAT
DETECTOR ON ZONE #4 THE FOLLOWING SHALL OCCUR:
6.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
6.2. ENERGIZE OVERHEAD CONCENTRATE TANK FOAM OUTLET SOLENOID.
6.3. ENERGIZE HANGAR 19 WEST OVERHEAD FOAM SYSTEM SOLENOID.
6.4. ENERGIZE MONITOR CONCENTRATE TANK FOAM OUTLET SOLENOID.
6.5. ENERGIZE HANGAR 19 NORTH FOAM MONITOR SOLENOID.
6.6. ENERGIZE HANGAR 19 SOUTH FOAM MONITOR SOLENOID.
6.7. START FIRE PUMP(S)
7. UPON ACTIVATION OF ANY HANGAR 19 FOAM SYSTEM MANUAL RELEASE STATION THE
FOLLOWING SHALL OCCUR:
7.1. SOUND AFFF PRE-DISCHARGE ALARM TONE.
7.2. ENERGIZE HANGAR 19 FOAM CONCENTRATE OUTLET SOLENOID.
7.3. ENERGIZE HANGAR 19 NORTH FOAM MONITOR SOLENOID.
7.4. ENERGIZE HANGAR 19 SOUTH FOAM MONITOR SOLENOID.
7.5. START FIRE PUMP(S)
G E
N E
R A
L
F
I R
E
A
L A
N
E
F O
E
R
E L E
A S
E
T
O N
E
F O
L E
A S
E F
L O
W
T
O N
E
G E
N E
R A
L
F
I R
E
A
L A
N
E
F O
E
R
E L E
A S
E
T
O N
E
F O
L E
A S
E F
L O
W
T
O N
E
2 12/28/2018 ER REVISE HANGAR 3 DOOR LOCATIONS; REVISE SEQ. OF OPS.
1 12/17/2018 ER REVISE PER UANG REVIEW COMMENTS
3 01/04/2019 ER REVISE DOOR LOCATION, DELETE FOAM RELEASE STATION
S T
A R
T
F
I R
E
P
U M
P S
S T
A R
T
F
I R
E
P
U M
P S
| Sheets and Views |
| UAG181151-1-FS-00 Title |
| UAG181151-1-D-01 3 Demo Plan |
| UAG181151-1-D-02 19 Demo Plan |
| UAG181151-1-FS-01 3 Heat Detector Plan |
| UAG181151-1-FS-02 3 Release Station Plan |
| UAG181151-1-FS-03 19 Heat Detector Plan |
| UAG181151-1-FS-04 19 Release Station Plan |
| UAG181151-1-WD-1 Hangar 3 Wiring |
| UAG181151-1-WD-2 Hangar 19 Wiring |
| UAG181151-1-ID-1 Details |
| UAG181151-1-ID-2 Operation Matrix |
File details come from the government source that posted it. Updated .