Solicitation: W50S99-22-B-0001, Roadway & Parking Lot Pavement Repair
1. The scope of work section 1.1.2 call for the contractor to repair the asphalt per UFC 3-
270-01 O&M Manual: Asphalt and Concrete Pavement Maintenance, UFC 3-250-08FA:
Standard of Practice for Sealing Joints, and Cracks in Rigid and Flexible Pavements and
Repair and USDOT FAA Advisory Circular (AC) 150/5380-6C Guidelines and
Procedures for Maintenance of Airport Pavements. These manuals are very detailed in the procedure to be used for the crack repair. The (AC) 150/5380-6C requires the contractor to sawcut and remove the asphalt 12” on each side of the crack for both partial and full depth cracks before repairs can be performed.
Question: Is this the intention of the project, or are you all just wanting crack sealant without saw cutting and asphalt replacement?
Answer: Our intension is just to do crack seal and no cutting of and replacement of asphalt.