Rolling Bins Q and A.pdf

PDF 54 KB Posted

Attached to
LRS Rolling Bins Carousel
Solicitation number
W50S98-24-Q-0022
Issued by

About this file

This document is a set of Questions and Answers related to Solicitation W50S98-24-Q-0022 for the LRS Rolling Bins Carousel project. The solicitation is for a vertical lift system to optimize storage space for the Logistics Readiness Squadron at McGhee Tyson ANGB. Key details include:

The existing system consists of 4 carousels that are 17 feet tall, which will be removed. There is a loading dock and clear access to the removal and installation sites. The contractor will remove the bins but not dispose of the carousel parts. The new carousel will operate on 240V power, though 480V power is available in the building. The existing carousel model is a System Logistics Intertex group 70-250-304-30-500, weighing 10,415 lbs per unit. The new carousel has specific dimensional and capacity requirements, including 21'3" height, 100.63" depth, 138.46" width, 96.76 sq ft footprint, 55 storage trays with 551 lb capacity each, and various partition and divider quantities and sizes.

View the file

Other files

File Type Posted
Screenshot Bin Data.png PNG image
Item List.pdf PDF
Combo Syn-Sol SOA LRS Rolling Bins.pdf PDF
Demo Pics.pdf PDF
Vertical Bin Requirements LRS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S98-24-Q-0022

LRS Rolling Bins Carousel

Questions and Answers

1. Can you supply the height of the 4 carousels being removed?

A: The height of the existing 4 carousels is 17ft

2. Is there a loading dock and clear access to the 4 carousels being removed as well as the build site for the new Lift?

A: Yes, there is a loading dock and clear access to the 4 carousels being removed as well as the build site for the new Lift.

3. As a rule after existing Carousels are taken down we move the parts to a designated location for the customer to dispose of themselves. If this is the case, please confirm and note the distance from the demo area to the customers staging area. If this is not the case, please detail how the existing carousel parts are to be handled.

A: LRS will move all the parts out that is inside the 4 existing carousels. The company that is awarded the contract will just remove the bins and dispose of them.

4. Will the new carousel be 240v or 480v?

A: Currently we have 240v in the building. If the new carousel that is purchased runs off 480v It will need to be reduced down to 240v.

5. What is the Kardex series that is being demo’ed?

A: MFR: System Logistics, Intertex group, model # 70-250-304-30-500, weight 10,415 lbs per unit. See attached picture

File details come from the government source that posted it. Updated .