This document is a set of questions and answers related to a federal contract opportunity for CE Appliances. The key details are:

The contract will require the contractor to provide various appliances, including an ice maker, two microwaves, refrigerators, blood drawing chairs, and medical equipment such as otoscopes, ophthalmoscopes, and blood pressure units. Most of the appliances will be replacing existing units, with some requiring new wall-mounted installations. The microwaves are intended for countertop and shelf use. The blood drawing chairs will not be bolted to the floor and will be installed on the ground level. Following the anticipated award date of September 30, 2024, the contractor will have 90 days to furnish and install all items, with potential exceptions for long lead items. The solicitation number is W50S98-24-Q-0010, and the contracting agency is the Department of the Army Tennessee Army National Guard.

View the file

Other files

File Type Posted
New Combo Synopsis CE Appliances.pdf PDF
Att 1-Price Sheet.xlsx XLSX spreadsheet
Att 2-TANG Appliances.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CE Appliances Q & A

1. Ice Maker: Could you specify where the ice maker will need to be installed? (ground floor, etc.)

Will it replace an exis�ng unit, or will new plumbing lines need to be installed?

A: Ground floor. It will replace exis�ng ice machine

2. 1000-Wat Microwave: What type of housing or cabinetry will this microwave need to be installed into?

A: An exis�ng shelf in the kitchen area is the intended loca�on of this microwave

3. Refrigerators: Will these new refrigerators be replacing exis�ng units? If not, are electrical outlets close?

A: Electrical outlets are available at intended loca�ons of refrigerators

4. Blood Drawing Chairs: Will these chairs be bolted directly to the floor? Will they be installed on the ground level or elsewhere?

A: Blood drawing chairs will not be bolted to the floor. They will be installed on the ground level

5. Otoscope/Ophthalmoscope/BP Units: Are these units going to be wall-mounted, and if so, are there pre-exis�ng facili�es for this installa�on or will new installa�ons be necessary?

A: These units will be new wall-mounted installa�ons

6. 1200-Wat Microwave: Is this microwave intended for countertop use?

A: This microwave will be for countertop use

7. Installa�on Timeline: Following the an�cipated award date of September 30th, 2024, could you provide a �meline for when the installa�on of these items would be expected to commence and �me allowed for comple�on?

A: Following award the contractor will have 90 days to furnish and install all items. Should the contractor encounter long lead items, coordina�on and approval from Contrac�ng may occur by excep�on on a case by case basis.