Questions Fiona Damages Repairs W50S9323B0001
5.1 Building 80: Auditorium
5.1.1 Replace all existing carpet areas with resilient flooring (12” x 12” vinyl tiles) and provide three (3) coats of polish.
Question
Is there shop drawings with the room’s measurements?
Yes, is included.
5.1.7 Replace 2’ x 2’ new acoustical ceiling tiles, 12 each.
In the site visit it was mentioned that 100% of the tiles would be replaced, is this accurate?
Yes.
5.2 Building 104: Oil-Water Separator
5.2.5 Paint chips, sediment and/or debris from building have to be clean up and dispose. Contractor will have to incorporate best management practices to avoid paint chips, sediment and/or debris from building pressure wash activities from accessing the storm water drains.
What would be the final disposition of the water inside?
Water could be disposed like stormwater, but, for final sludge sediments shall be dispose with a truck cistern after taking an environmental lab test.
5.2.6 Install new manual transfer switch with accessories to water pump electrical panel system.
Would it be possible the get localization grid and pictures?
Manual transfer switch shall be installed in sewage pump station next to Bldg. 93.
5.2.7 Remove and replace existing roof metal structures to include but not limited to beams and metal sheets.
Roof metal sheets (galvalume) shall be gauge 24. All metal structural elements shall be painted with corrosion resistance coating.
Can you provide the dimensions for the gazebo?
20’ x 24’
6. Question
We would like to know the following:
1-The gauge of the structural elements for the beams and columns of the water well area.
Answer: Same as exiting. Hot dip galvanized.
2- The information of the pump, its electrical components and type of pump.
Answer: There is no pump. The system works with gravity.
3- Payment and performance bond which would be the percentage, and which one applies.
Answer: As mandated by NGB, being an above $35K project they both apply, and the percentage is 100% of your awarded bid price. As a reminder, you bid offer will also need a bid bond worth 20% of your bid price.