Consolidated RFIs Demo Bldgs. 6 11 14 17.docx
DOCX document 18 KB Posted
- Attached to
- Demolition Bldgs. 6, 11, 14 & 17 (TVAD 212204)
- Solicitation number
- W50S9322R0012
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attendance Roster 31-Aug-22.pdf | ||
| TVAD 212204 SOW Demo Buildings 6-11-14 and 17 (003).docx | DOCX document | |
| TVAD 212204 SOW Demo Buildings 6-11-14 and 17.docx | DOCX document | |
| Combo.docx | DOCX document | |
| TVAD 212204 SOW Demo Buildings 6-11-14 and 17.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Demolition of Buildings 6, 11, 14 & 17 Government Responses to Industry Questions
1. Are buildings 6, 11, 14, & 17 currently with electrical power? If in fact, they have power what is going to happen to expose electrical panels or sub panels after demolition?
· The buildings have power. As part of the demolition, all electrical components attached to the building must be demo as well. Main power source for each building must be disconnected from the facility and main feeder must be pulled and disposed. All underground electrical pipes must be cap at the surface. All electrical works must comply with UFC 3-560-01 Electrical Safety.
2. Buildings 6, 11, 14, & 17: For the benefit of everybody, can you please provide an estimated amount of square footage or incorporate an "Allowance Item" amount, for Lead-Based Paint and Asbestos mitigation? We think there is no way we can estimate that due to the few information given. If for example, we assume all the buildings are positive to Lead-Based paint and they are not, it will be an overburden in cost for the Owner.
· The square footage for each bldg. is in the SOW. Assume the following height for the facilities: Bldg. 6. 26ft & Bldg. 11, 14, 17 10 ft. There is no survey on asbestos or LBP on those buildings. Therefore, we request a survey. Building 6 and 11 were built prior 1978 assume there is LBP on them. Building 14 and 17 were built after 1978 by this time LBP was prohibited on new construction. However, a LBP survey must be performed. Assume there is asbestos on all buildings.
3. Building #6: Elastomeric roof sealer years of warranty??
· At least 10 years. Roof work must comply with UFC 3-110-04 & UFC 3-110-03
4. Building #6: With the limited access we had in building please let us know where the security room is located?
· Most of the repair section for building 6 has been deleted. Please review modified SOW.
5. Building #6: Please confirm the amount of HVAC units to be installed and their capacities.
· Most of the repair section for building 6 has been deleted. Please review modified SOW.
6. Building #6: Please provide more information on the existing fire alarm actual conditions since we didn't have access to it.
· Most of the repair section for building 6 has been deleted. Please review modified SOW.
7. Was a site visit conducted? If so, will the list of attendees be posted soon?
· The site visit was conducted on August 31st, list of attendees was already posted in SAM.
8. There was no mention of the magnitude of this project. Has a magnitude been determined?
· NGB considers demolitions to be a service, not a construction project, hence, no magnitudes are disclosed.