Restroom floor plant of Bunker 9.docx
DOCX document 45 KB Posted
- Attached to
- Bldg. 9 CATM Renovations
- Solicitation number
- W50S9321B5014
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised SOW RENOVATIONS OF BLDG 9 CATM BUNKER.pdf | ||
| BLDG 3-A-1.0.pdf | ||
| RFIs Bldg 9 Renovations.pdf | ||
| BLDG 3 -M-1.0.pdf | ||
| BLDG 3-T-1.0.pdf | ||
| BLDG 3-A-1.1.pdf | ||
| BLDG 9 Bunker East Island.pdf | ||
| BLDG 3 RPR.pdf | ||
| BLDG 3 SKETCH FULL PLAN.pdf | ||
| Bldg. 3 Bunker Electrical plans.pdf | ||
| DRAFT Solicitation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The illustration above shows the only modification to the floor plant of Bunker 9. It demonstrate the relocations of toilets and showers inside the restroom, these changes will allow for the separation of female and male restrooms.
image1.png
File details come from the government source that posted it. Updated .