Responses to Questions_Inspect Fire Systems.pdf
PDF 243 KB Posted
- Attached to
- Inspect Fire Systems Federal contract opportunity
- Solicitation number
- W50S91-23-Q-0013
- Issued by
- Department of the Army National Guard
About this file
This document contains responses to questions regarding solicitation number W50S91-23-Q-0013 from the Department of the Army National Guard to inspect fire systems at various buildings on base. The government response provides quantities for wet and dry sprinkler risers, as well as pre-action systems, manual pull stations, smoke detectors, and fire pumps located in specific buildings. It notes that a five year internal obstruction test is not required for the fire sprinkler system. No other details are given on products or services required under the contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S91-23-Q-0013_Amd 1.pdf | ||
| Attachment 2 - Wage Determination - 171 ARW.pdf | ||
| Attachment 3 - Wage Determination - 258 ATCS.pdf | ||
| W50S91-23-Q-0013 - Inspect Fire Systems.pdf | ||
| Attachment 1 - PWS - Inspect Fire Systems.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Question Government Response
1.Can the Government provide the quantities for the following items broken out by building.
•Wet Sprinkler Risers •Dry Sprinkler Risers •Tamper Switches •Waterflow Switches •Pre-Action Systems (computer rooms) •Manual Pull Stations •Smoke Detectors •Heat Detector •Duct Smoke Detectors •Fire & Smoke Dampers •Fire Extinguishers •Backflow Preventers (Fire & Domestic) •Fire Pumps •Kitchen Hood Suppression Systems •Special Hazards Suppression (FM-200, Halon Systems, etc.)
•Wet Sprinkler Risers (in the PWS, Table 1) •Dry Sprinkler Risers (in the PWS, Table 1) •Tamper Switches (Unknown) •Waterflow Switches (Unknown) •Pre-Action Systems (1, in the flight simulator bay of building 304) •Manual Pull Stations (16 - 258th only) •Smoke Detectors (3 - 258th only) •Heat Detector (3 - 258th only) •Duct Smoke Detectors (2 – 258th only) •Fire & Smoke Dampers (Unknown) •Fire Extinguishers (not part of contract) •Backflow Preventers (Fire & Domestic) •Fire Pumps (3 diesel in building 321, 2 electric in building 325) •Kitchen Hood Suppression Systems (4 - building 300) •Special Hazards Suppression (FM-200, Halon Systems, etc.) (None)
2 Will the Fire Sprinkler System be required to have a 5 year internal obstruction test performed? No