statement of work bld 333 and 400.docx

DOCX document 1 MB Posted

Attached to
Cable Lifeline System Anchors Inspection
Solicitation number
W50S8Z-23-Q-0006
Issued by

View the file

Other files

File Type Posted
Cable Lifeline Combo.docx DOCX document
statement of work bld 333 and 400.docx DOCX document
Cable Lifeline Combo.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

CABLE LIFELINE SYSTEM ANCHORS INSPECTION

173 FIGHTER WING, ADVANCED PROGRAMS OFFICE

1. Description of Work. Contractor shall provide supplies, equipment, and labor necessary to inspect and test of two (2) Cable Lifeline Systems and Anchors in building 400 Bay 4 (28 feet off the ground) and building 333 (22 feet off the ground). The inspection must be done by a Competent Person and in accordance with ANSI/ASSP Z359.0

1.1 Major items of work that shall be performed:

1.2.1 In person visit to the above-mentioned location.

1.2.2 Visual inspection of all anchors and cable systems. This will require the use of a man lift. There will be no Government furnished equipment on this contract.

1.2.3 Load testing of systems as per CSA standard.

1.2.4 Certificate of compliance for each anchor/system.

1.2.5 All travel related expenses for one mobilization for entire inspection. Additional mobilization should not be required.

2. Basic Services. The Period of Performance shall be (1) business day. The Contracting Officer shall be immediately notified in writing of any delays. Once all work is completed and the final inspection is done, the project shall be considered completed and certificate of compliance for each anchor/system is provided.

3. General.

3.1 Hours of Operation. The Contractor shall perform inspections on a standard business day. Access will not be provided on weekends or Federal holidays. The Contractor shall perform inspections during normal business hours. Access will be provided from the hours of 0800 to 1600.

3.2 A site visit will not be conducted for this project.

3.3 If any conflicts occur necessitating departure from the Statement of Work, the reason(s) for the departure(s) and all relevant details shall be submitted to the Contracting Officer for written approval.

Bldg 400 area 1

Bldg 400 area 2

Bldg 400 area 3

Bldg 400 area 4

Bldg 333 area 1

Bldg 333 area 2

Bldg 333 area 3

Bldg 333 area 4 image7.jpeg image8.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg

File details come from the government source that posted it. Updated .