Compiled Questions and Answers Sunshades.pdf

PDF 93 KB Posted

Attached to
142WG Sunshade Inspection Federal contract opportunity
Solicitation number
W50S8Y24QA011
Issued by
Department of the Army Oregon Army National Guard

About this file

This document is a Compiled Questions and Answers for a federal contract opportunity related to sunshade inspection services.

The key details are:

  • The contract is for periodic sunshade inspection services at the Portland Air National Guard Base. The contract has a 12-month base period with four 12-month option years.
  • The contract is set aside for small businesses under NAICS code 541350 - Building Inspection Services, with a size standard of $11.5 million.
  • The solicitation will be issued on June 4, 2024, with a proposal due date of June 28, 2024. All questions must be submitted by June 21, 2024.
  • The contract will be awarded as a firm-fixed price contract using FAR Part 12 and FAR Part 13 procedures.
  • Offerors must be registered in SAM.gov and complete a NIST SP 800-171 DOD Assessment to be eligible for award.
  • The document also provides responses to questions related to inspection requirements, reporting, response times, historical maintenance data, and site visits.

View the file

Other files for this federal contract opportunity

Other files attached to 142WG Sunshade Inspection, newest first.
File Type Posted
PWS Aircraft Sunshade Inspection 3 Apr 24.pdf PDF
WD 2015-5563.pdf PDF
Solicitation - W50S8Y24QA011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compiled Questions and Answers Sunshades

1. Can you provide more detailed specifications on the biannual and annual inspection requirements, including any specific standards or guidelines we need to follow?

Answer: All the inspection requirements can be found in the PWS. Everything on the PWS comes from actual Air Force Instructions (AFIs). The previous inspector would rent a lift and use it to inspect the upper portions of the sunshades and walk the rest.

2. Could you provide more details on the format and content expected for the inspection and maintenance reports?

Answer: The format of the inspection content should include those items that need to be inspected and their condition according to the PWS. The format of the submittal can be discussed post-award between the COR and the Contractor.

3. What are the expected response times for emergency repairs, and how should they be documented?

Answer: If emergency repairs are to be done, then the response time should be as soon as possible baring schedule and financial limitations. For documentation, a letter stating what was done in a PDF, signed by the Contractor, and then signed by the COR or sunshade manager or alternate manager for validation would be sufficient.

4. Is there any historical data available on the sunshade maintenance, including past performance issues or common repair needs?

Answer: There is one bird net that came down due to a snowstorm that is removed. The overhead lamps through attrition are being replaced with LEDs as the old lamps are unobtainable. There are at least 3 nonoperational currently. Often, a red obstruction light will need to be replaced and will typically be swapped out when the roof is inspected. The down spouts are affected by wind and weather and often come loose at the straps. The structure and the roof are in good condition. Some of the bird netting has minor damage in places at the lamp ballast.

5. Will there be an opportunity for a site visit before the proposal submission deadline to better understand the site conditions and requirements?

Answer: No, a site visit will not be considered at this time.

6. What condition is the bird netting in? Per the PWS "If loose or damaged, tighten, repair, patch, or replace IAW manufacturer’s specifications" if the bird netting needed to be completely replaced that would be worth 3-4 times the cost of this inspection/maintenance contract. Can it be understood that the bird deterrents will be maintained and replaced but complete bird netting replacement is outside the scope of this contract?

Answer: Some of the bird netting has minor damage in places at the lamp ballast. Complete replacement would be outside of the scope of the contract.

7. Can you provide the contractor who currently tests the FCX power converter?

Answer: Bud Adams

MCM Engineering Field Service ba.mcm@comcast.net www.mcmeng.com